18.06.2014 Views

IWMP 7 - Commissionerate of Rural Development Gujarat State ...

IWMP 7 - Commissionerate of Rural Development Gujarat State ...

IWMP 7 - Commissionerate of Rural Development Gujarat State ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Detail Project Report <strong>IWMP</strong> 7<br />

Project reviewing committee along with the project co-coordinator will monitor the overall outcomes <strong>of</strong> the objectives as per the log frame. The outcomes<br />

level monitoring may start in the second year and continue on an annual basis. Most <strong>of</strong> the information can be available from the sets <strong>of</strong> output level indicators.<br />

Participatory methods should be used at the time <strong>of</strong> monitoring the activities.<br />

The methods <strong>of</strong> collecting samples data for the monitoring activities should be clearly documented in the monitoring report. The detail <strong>of</strong> the monitoring system is<br />

presented in the table as under.<br />

Table no 60. Details <strong>of</strong> Monitoring system proposed for the project<br />

Tiers <strong>of</strong> Monitoring Basis <strong>of</strong> monitoring Frequency <strong>of</strong> monitoring Orientation <strong>of</strong> the Indicator Monitoring by<br />

First tier<br />

Immediate result<br />

basis<br />

Regular Monthly Monitoring Activity oriented Local People organizations<br />

Second Tier<br />

Monitoring <strong>of</strong> Regular monitoring (Quarterly,<br />

Internal project team (WDT, PIA, MDT, Experts and<br />

Objective oriented<br />

Outputs<br />

half yearly and annually )<br />

PM)<br />

Third Tier<br />

1. Specified monitoring team formed by DWDU,<br />

Monitoring <strong>of</strong> Annually but monitoring start<br />

Goal Oriented<br />

2. External Monitoring team by GSWMA<br />

Outcomes<br />

from second year onwards?<br />

Apart from the above mentioned monitoring system, there are a Web-based GIS System is being developed for monitoring and evaluating the project in its<br />

planning & implementation phases. The system would be available on a public domain and can be accessed by all the stakeholders <strong>of</strong> the project. The system shows<br />

the entire state <strong>of</strong> <strong>Gujarat</strong> and all <strong>of</strong> those areas selected over the next 18 years. Filtering allows the user to zoom onto one particular project. Details related to soil<br />

type, Land-use classification, inhabitation etc., can be obtained village-wise. Furthermore, survey-number wise details related to ownership, irrigation source, yield<br />

etc., can also be accessed by the users <strong>of</strong> the system. This system is being used for pooling up the details obtained from the DPR. In other words, the DPR is made<br />

available online in the form <strong>of</strong> a database which will help the stakeholders know areas <strong>of</strong> importance viz., already treated areas/historical works in the area,<br />

proposed areas for treatment etc., for further treatment and planning. The system would also show the satellite imageries <strong>of</strong> various years from the project<br />

inception stage to the project closing stages. This allows the user to evaluate the effectiveness <strong>of</strong> the treatment and thereby plan corrective measures for the project<br />

area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy <strong>of</strong> the project.<br />

<strong>Gujarat</strong> <strong>State</strong> watershed Management Agency

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!