Detail Project Report <strong>IWMP</strong> 7<br />

Executive Summary<br />

Sarasva (N) cluster (<strong>IWMP</strong> 7) has been Sanction under the Integrated Watershed Management Programme running under the new Common Guideline 2008. It is<br />

located in South West direction <strong>of</strong> the Kadana taluka; Panchmahal district and <strong>Gujarat</strong> state. It consists <strong>of</strong> sixteen villages (Sarasva (N), Ditvas, Karvai, Moti Rath,<br />

Nani Rath, Bhul, Nana Padadara, Tarkoni Nal, Amboja, Karodia (North), Sarsdi, Rankakot, Jambunala, Pachher, Ghaswada, Ranakpur). The total Geographical area <strong>of</strong><br />

the watershed project is about 8364.96 ha, <strong>of</strong> which 2258.06 ha has been covered under Watershed –Hariyali Project remaining 6232.72 ha has to treat under<br />

Integrated Watershed management Programme. This covers 10 Micro watersheds. Based on thirteen Parameter (as per table no 2.1) watershed area has been<br />

selected.<br />

District Watershed <strong>Development</strong> Unit, Panchmahal has been selected as Project Implementation Agency (PIA) for Sarasva (N) cluster (<strong>IWMP</strong> 7) by <strong>State</strong> level Nodal<br />

Agency (GSWMA – <strong>Gujarat</strong> <strong>State</strong> Watershed Management Agency for <strong>Gujarat</strong> state). PIA is responsible for the Successful Implementation <strong>of</strong> the Watershed project.<br />

The WDT is an integral part <strong>of</strong> the PIA and will be set up by the PIA. WDT should have knowledge and experience in agriculture, soil science, water management,<br />

social mobilization and institutional building.<br />

DPR (Detail Project Report) is prepared after carrying out Baseline Survey, Technical survey and PRA Exercise (Participatory <strong>Rural</strong> appraisal) at village level. As per<br />

NRAA‘s Tools for Base Line Survey and Performance Assessment <strong>of</strong> Watershed <strong>Development</strong> Projects in India; Baseline survey was conducted at household level for<br />

Socio-economic information, Bio-physical survey was conducted at field level for natural resource information; same as PRA for better people participation and<br />

need identification <strong>of</strong> local people. Then Work plan will be prepared and resolution <strong>of</strong> DPR in Garmshabha will be done.<br />

Scientific inputs like GPS, GIS are used for watershed planning. Soil and water conservation structures are selected by Ridge to valley approach. Livelihood activities<br />

for the asset less persons have been planed as per local people’s competencies. Production system and micro enterprises have been planned as per requirement <strong>of</strong><br />

local people. For better implementation, we have designed a capacity building schedule for the different stakeholders like User groups, Self Help Groups, Village<br />

watershed committee etc.<br />

Soil and water conservation activities, livelihood plan, production system and enterprise development work will be implemented as peer DPR during the work<br />

phase. Expected outcome was pre-discussed and finalized DPR has been summed up using LFA (Logical framework <strong>of</strong> Analysis).<br />

<strong>Gujarat</strong> <strong>State</strong> watershed Management Agency