IWMP 7 - Commissionerate of Rural Development Gujarat State ...
IWMP 7 - Commissionerate of Rural Development Gujarat State ...
IWMP 7 - Commissionerate of Rural Development Gujarat State ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Detail Project Report <strong>IWMP</strong> 7<br />
Yet another component <strong>of</strong> the Web-based GIS system is the Mobile based Monitoring & Evaluation System, which will help the ground staff alias WDTs<br />
(Watershed <strong>Development</strong> Team) to transmit information from the ground level to the central server. Also, any higher-up <strong>of</strong>ficial in charge <strong>of</strong> the project can obtain<br />
information regarding the project area on their mobile phone by means <strong>of</strong> an SMS. The system works in the following manner. The WDT equipped with a GPS<br />
instrument marks the latitude-longitude information <strong>of</strong> various treatment areas during the DPR. The probable sites are then transferred onto the central server.<br />
During the works phase, any progress in the treatment areas is reported to the server by means <strong>of</strong> an SMS by the WDT. Similarly, any nodal <strong>of</strong>ficer or higher-up<br />
<strong>of</strong>ficial can view the progress in a project by means <strong>of</strong> summarized reports generated over frequent periods <strong>of</strong> time.<br />
7.1.2 Evaluation:<br />
The project will be evaluated by the external agency after the project completion to see the impact <strong>of</strong> the project in the area. The external agency should use<br />
the monitoring tool specified in the DPR <strong>of</strong> the project and should consider the assumptions and risk mentioned in the DPR because these are the factors which may<br />
be an obstacle in the implementation <strong>of</strong> the project. The agency will be decided by the <strong>State</strong> Nodal Agency (GSWMA) at the time <strong>of</strong> the evaluation. The evaluation<br />
will be evaluate that the goal is achieved or not after the implementation <strong>of</strong> the project.<br />
7.2 Plans for Post-Project Management/Sustainability Approach:<br />
Watershed development project can be rendered sustainable through an appropriate combination <strong>of</strong> environmental balance, community participation and<br />
institutionalization <strong>of</strong> process. So the detail plans for the post project management are described as under:<br />
7.2.1 Adopting Environment friendly conservation measures<br />
The measures taken up will be long lasting. Along with engineering measures, efforts will also be made to establish forest cover in the upper catchment<br />
areas and on the slopes. The downstream area will have prolonged stream flows. The stream banks should also be vegetated to create a buffer between land and<br />
water bodies. Such vegetation helps in stabilizing streams, enhancing recharge and improving the riparian habitat.<br />
An including species <strong>of</strong> trees and grasses will be selected for developing a vegetative cover at the time <strong>of</strong> implementation <strong>of</strong> <strong>IWMP</strong> 7 project <strong>of</strong> Panchmahal.<br />
The diversity <strong>of</strong> vegetative measures is the key to sustainability. Combination <strong>of</strong> shallow and deep-rooted plants, fast and slow growing plants, productive and<br />
<strong>Gujarat</strong> <strong>State</strong> watershed Management Agency