18.06.2014 Views

IWMP 7 - Commissionerate of Rural Development Gujarat State ...

IWMP 7 - Commissionerate of Rural Development Gujarat State ...

IWMP 7 - Commissionerate of Rural Development Gujarat State ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Detail Project Report <strong>IWMP</strong> 7<br />

1<br />

Earth Work Construction <strong>of</strong> earthen bund (dry <strong>of</strong> moist)<br />

excavation<br />

and lying in 15 cm layer, breaking <strong>of</strong> clods. Separating leaves and<br />

small Stonees, dressing and compaction with<br />

sheep foot roller or<br />

hand rammer<br />

Up to 1.5 meter lift and 50 meter lead.<br />

a)ordinary soil<br />

b)hard soil<br />

3.00 + 1.00<br />

1 10.00<br />

2<br />

1.00 20.00 60.00 1200.00<br />

2 Providing 300 mm Thick Pucca Rubble Pitching in cm 1:5<br />

Proportion Width the surface pointed with cm 1:3 etc comp. for<br />

all Leads and Lifts<br />

U/S and D/S 2 2.50 - 0.90 4.50 504.80 2271.60<br />

Top 1 2.50 - 1.20 3.00 504.80 1514.40<br />

Total 4986.00<br />

Unit Cost <strong>of</strong> Earthen Bund<br />

5000/ Nos<br />

Farm Bund<br />

<strong>Gujarat</strong> <strong>State</strong> watershed Management Agency

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!