18.06.2014 Views

IWMP-2 - Commissionerate of Rural Development Gujarat State ...

IWMP-2 - Commissionerate of Rural Development Gujarat State ...

IWMP-2 - Commissionerate of Rural Development Gujarat State ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Detailed Project Report <strong>IWMP</strong>-2<br />

Estimate <strong>of</strong> Check dam<br />

Abstract Sheet<br />

Sr.No Discription Quantity Rate Unit Amount<br />

1 Excavated in all sort <strong>of</strong> soil with yellow, sandy, gravelly soil including s<strong>of</strong>t murram & H.M.<br />

including sorting & stacking and depositing the excaveted stuff in uniform layer as and<br />

directed upto lead <strong>of</strong> 30mt. And lift 0 to 3 mt. depth inclucding clearing the sit etc. complete.<br />

P. NO. 25 I. NO. 1-A 61.80 44.00 Cmt 2719.20<br />

2 Providing and laying position cement concrete 1:4:8 using cement, sand and machin crushed<br />

course aggregate (MAS-40 to 80) size including providing necessary formwork compaction,<br />

finishing and curing as directede required etc complete. P.NO. 24a I. NO. 1 22.65 1460.00 Cmt 33069.00<br />

3 Providing and laying position cement concrete M-10 (1:3:6) using cement, sand and machin<br />

crushed course aggregate (MAS-40 to 80) size including providing necessary formwork<br />

compaction, finishing and curing as directede required etc complete. P.NO. 36 I. NO. 1a<br />

74.95 1740.00 Cmt 130413.00<br />

4 Earth work in embankment form borrow pits in all sots <strong>of</strong> soil and s<strong>of</strong>t murrum or other<br />

suitable strata as directed including brecking the clods and dressing to the desing sections<br />

including cutting the proud section with lead as under and lift including site clearing etc<br />

complete.(a) 0 to 30 mt. P.NO. 27 I.NO 5A 2250.00 36.00 Cmt 81000.00<br />

5 Providing and laying dry rubble pitching with base <strong>of</strong> inverted filter as per desing and<br />

drawing including providing headers or hand packing trimming and dressind <strong>of</strong> slops etc<br />

complete for leads sa specified and all lifts etc. complete. P.NO. 5 I.NO. 13-b 120.00 34.50 Smt 4140.00<br />

Total 251341.20<br />

2% Counti 5026.82<br />

Total 256368.02<br />

Say 256400.00<br />

<strong>Gujarat</strong> <strong>State</strong> Watershed Management Agency<br />

97 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!