Detailed Project Report <strong>IWMP</strong>-2<br />
Estimate <strong>of</strong> Check dam<br />
Mesurement Sheet<br />
Sr.No Discription Name No. Length Bridth Depth Quantity<br />
Excavated in all sort <strong>of</strong> soil with yellow, sandy, gravelly soil including s<strong>of</strong>t Body wall 1 13.00 2.00 1.30 33.80<br />
murram & H.M. including sorting & stacking and depositing the excaveted stuff<br />
Approne 1 13.00 2.50 0.40 13.00<br />
in uniform layer as and directed upto lead <strong>of</strong> 30mt. And lift 0 to 3 mt. depth<br />
inclucding clearing the sit etc. complete. P. NO. 25 I. NO. 1-A<br />
Toe wall 1 13.00 0.60 0.40 3.12<br />
Winng wall 2 3.10 0.60 1.30 4.84<br />
1<br />
2<br />
3<br />
Providing and laying position cement concrete 1:4:8 using cement, sand and<br />
machin crushed course aggregate (MAS-40 to 80) size including providing<br />
necessary formwork compaction, finishing and curing as directede required etc<br />
complete. P.NO. 24a I. NO. 1<br />
Providing and laying position cement concrete M-10 (1:3:6) using cement, sand<br />
and machin crushed course aggregate (MAS-40 to 80) size including providing<br />
necessary formwork compaction, finishing and curing as directede required etc<br />
complete. P.NO. 36 I. NO. 1a<br />
<strong>Gujarat</strong> <strong>State</strong> Watershed Management Agency<br />
Abutment 2 3.00 0.60 1.30 4.68<br />
Side wall 2 1.50 0.60 1.30 2.34<br />
Total 61.78<br />
Say 61.80<br />
Body wall 1 13.00 2.00 0.30 7.80<br />
Approne 1 13.00 2.50 0.30 9.75<br />
Toe wall 1 13.00 0.60 0.30 2.34<br />
Winng wall 2 3.10 0.60 0.30 1.12<br />
Abutment 2 3.00 0.60 0.30 1.08<br />
Side wall 2 1.50 0.60 0.30 0.54<br />
Total 22.63<br />
Say 22.65<br />
Body wall 1 13.00 2.00 1.00 26.00<br />
Body wall 1 13.00 1.30 1.20 20.28<br />
Approne 1 13.00 2.50 0.10 3.25<br />
Toe wall 1 13.00 0.60 0.40 3.12<br />
Winng wall 2 3.10 0.60 1.00 3.72<br />
Winng wall 2 3.10 0.60 1.70 6.32<br />
Abutment 2 3.00 0.60 1.00 3.60<br />
Abutment 2 3.00 0.60 2.40 8.64<br />
( 2.0 + 0.60 ) / 2 = 1.30 Side wall 2 1.50 0.60 1.00 1.80<br />