Malaysia - SETatWork - Sustainable Energy Technology at Work
Malaysia - SETatWork - Sustainable Energy Technology at Work
Malaysia - SETatWork - Sustainable Energy Technology at Work
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
to th<strong>at</strong>, the technology transfer and/or improvement in technology involved should also<br />
enhance the indigenous capacity of <strong>Malaysia</strong>ns to apply, develop and implement<br />
environmentally sound technologies.<br />
<strong>Technology</strong> transfer and/or improvement in technology should also support the<br />
sustainable objectives of <strong>Malaysia</strong>. As such, CDM projects should lead to reduced<br />
depletion r<strong>at</strong>e of non-renewable energy resources through the adoption of technologies<br />
with higher energy efficiency or renewable energy technologies which increases the<br />
deployment of renewable energy resources. Technologies th<strong>at</strong> reduce GHG emissions<br />
significantly through other Greenhouse Gases listed in Annex A of the Kyoto Protocol<br />
should also be considered.<br />
In order to ensure effective transfer of technology and/or improvement of technology<br />
employed in the energy sector, the relevant indic<strong>at</strong>ors should measure the following:<br />
! Impact of the project on indigenous capacity to apply, develop and implement<br />
environmentally sound technologies;<br />
! Impact on increased use of renewable energy resources and/or increased energy<br />
efficiency and/or reduction of greenhouse gas emissions;<br />
! Demonstr<strong>at</strong>ion and replic<strong>at</strong>ion potential of the technology; and<br />
! Impact on domestic energy-rel<strong>at</strong>ed industries and services (increased local<br />
content of skills and equipment in energy projects).<br />
Criterion 4: Project must fulfil all conditions underlined by the CDM Executive<br />
Board<br />
Getting a N<strong>at</strong>ional Host Country Approval is a requirement for registr<strong>at</strong>ion with CDM EB<br />
however in order for a proposed CDM projects to get a N<strong>at</strong>ional Host Country Approval,<br />
the project is also required to fulfill all conditions underlined by the CDM Executive board.<br />
The conditions are as follows:<br />
! Voluntary particip<strong>at</strong>ion;<br />
! Real, measurable and long-term benefits rel<strong>at</strong>ed to mitig<strong>at</strong>ion of clim<strong>at</strong>e change;<br />
and<br />
! Reductions in emissions th<strong>at</strong> are additional to any th<strong>at</strong> would occur in the<br />
absence of the certified project activity.<br />
12