Malaysia - SETatWork - Sustainable Energy Technology at Work
Malaysia - SETatWork - Sustainable Energy Technology at Work
Malaysia - SETatWork - Sustainable Energy Technology at Work
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GHG emission<br />
reductions:<br />
‘EAU, CER, ERU,<br />
AAU”:<br />
Methodology:<br />
Baseline<br />
emissions:<br />
Contribution to<br />
<strong>Sustainable</strong><br />
Development:<br />
The estim<strong>at</strong>ed GHG reduction is approxim<strong>at</strong>ely 57,830 tCO 2 -<br />
equivalent/year.<br />
CER<br />
ACM0001 version 2 which applicable for landfill project which<br />
also claims emission reductions from electricity displacement.<br />
The anthropogenic emissions by sources of greenhouse gases of<br />
the baseline are the methane destruction and electricity<br />
displacement.<br />
The project will contribute to the sustainable development as<br />
follows:<br />
• The utiliz<strong>at</strong>ion of the LFG emitted to the air <strong>at</strong> the landfill site,<br />
which elimin<strong>at</strong>e the fossil fuel consumption for electricity<br />
gener<strong>at</strong>ion.<br />
• The collected LFG will be used for power gener<strong>at</strong>ion to be<br />
transferred to the distribution grid of TNB.<br />
• The project possibly serves as a replic<strong>at</strong>ion to other urban<br />
solid waste landfill sites in the country.<br />
• Small power gener<strong>at</strong>ion services will be developed as well as<br />
increasing the local particip<strong>at</strong>ion in manufacturing and<br />
constructing LFG system.<br />
• The project accompanies the safety closure of landfill.<br />
5.3.6 Economic d<strong>at</strong>a:<br />
Financing:<br />
Total project<br />
costs:<br />
There will be cooper<strong>at</strong>ion between the local project participant<br />
with and Annex-I Party in term of equity particip<strong>at</strong>ion and CER<br />
buyer. A special purpose company is to be established for the<br />
project.<br />
RM 26.7 million<br />
5.3.7 Additional inform<strong>at</strong>ion:<br />
The PDD can be downloaded from<br />
Title:<br />
Methodology:<br />
Address for download of<br />
electronic document:<br />
Project document:<br />
Address for download of<br />
electronic document:<br />
Kim Loong Methane Recovery for Onsite Utilis<strong>at</strong>ion<br />
Project <strong>at</strong> Kota Tinggi, Johor, Version 2.3, November<br />
26 th 2006<br />
AM0022: Avoided Wastew<strong>at</strong>er and On-site <strong>Energy</strong> Use<br />
Emissions in the Industrial Sector. Version 3, 28 July<br />
2006<br />
http://cdm.unfccc.int/methodologies/DB/BM4NZO7YA<br />
H9373G9P0UZHN6G1XM3IW/view.html<br />
http://cdm.unfccc.int/UserManagement/FileStorage/U<br />
4WDYI7HRUFY90HEVDG1JHVQBMA68A<br />
30