42<br />

SCHEDULE OF ITEMS<br />

NOTES: -<br />

1. Details of the items under this schedule shall be read in conjunction with the<br />

corresponding Specifications, Drawings and other Tender Documents.<br />

2. The work shall be carried out as per the approved drawings, specifications, and the<br />

description of items in the Schedule and or Engineer’s instructions. Drawings<br />

enclosed with these documents are only preliminary for giving some ideas of the<br />

work involved. Final drawings will be issued progressively during execution of the<br />

works.<br />

3. Items of work provided in this Schedule but not covered in the Specifications shall be<br />

executed strictly as per instructions of the Engineer.<br />

4. Unless specifically mentioned otherwise in the contract, the Tenderer shall quote for<br />

the finished items and shall provide for the complete cost towards labour, materials,<br />

plant and machinery, operational costs, levies, taxes, insurance, consumable,<br />

scaffolding, transport, repairs, rectification, maintenance till handing over, revenue<br />

expenses, contingencies, overheads, watering, curing, water, power tariffs and all<br />

incidental items not specifically mentioned but reasonably implied and necessary to<br />

complete the work according to the Contract.<br />

5. The quantities of the various items mentioned in this Schedule are approximate and<br />

may vary upto any extent or be deleted altogether. The quoted rates of each item will<br />

remain firm as long as the variation in the total value of the works executed under<br />

this contract including extra items, if any but excluding any price escalation remain<br />

within +/ -25% (twenty five percent) of the tendered value of the works. The<br />

Contractor, in his own interest, should get an indication of the probable extent of work<br />

to be executed under any particular item in this schedule, before undertaking any<br />

preliminary work or purchasing bought out components related to the work.<br />

6. Rates shall be quoted both in figures and in words in clear legible writing. No<br />

overwriting is allowed. All scoring and cancellation should be countersigned by the<br />

Tenderer. In case of illegibility, the interpretation , the decision of the Engineer-incharge<br />

of work shall be final. All entries shall be in English Language. In case if on<br />

check there are differences between the rates given by the bidder in words and<br />

figures or in the amounts worked out by him, the following procedure should be<br />

followed.