STRUCTURAL FIRE PRECAUTIONS D - South Ayrshire Council
STRUCTURAL FIRE PRECAUTIONS D - South Ayrshire Council
STRUCTURAL FIRE PRECAUTIONS D - South Ayrshire Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
D2.1<br />
D<br />
Table 2 to D2.1: Minimum duration and maximum compartment area in a building other than a single<br />
storey<br />
Purpose Maximum Maximum Duration of Duration of Duration of elements of structure,<br />
groups and area of a area of an external elements of and where appropriate<br />
purpose compart- individual walls structure, compartmentation (see D3.1)<br />
sub-groups ment storey (see D8.1) and where The The The<br />
(m 2 ) [1] Within a appropriate topmost topmost topmost<br />
compart- compart- storey of a storey of a storey of<br />
ment (m 2 ) mentation building is building is a building<br />
[1] (see D3.1) at a height at a height is at a<br />
in a of not more of not more height of<br />
basement than 7.5 m than 18 m more than<br />
above above 18m above<br />
ground ground ground<br />
1 Dwellings Unlimited Unlimited Medium [2] Medium Short Medium Long<br />
2A Institutional 1,500 1,500 Medium Medium Medium Medium Long [3]<br />
2B Other 1,000 1,000 Medium [2] Medium Short Medium Long [3]<br />
residential 2,000 2,000 Medium Medium Medium Medium Long [3]<br />
4,000 2,000 Medium Medium Long Long Long<br />
3 Offices 2,000 2,000 Medium [2] Medium Short Medium Long [3]<br />
4,000 4,000 Medium Medium Medium Medium Long [3]<br />
8,000 4,000 Medium Medium Long Long Long<br />
4 Shops and 500 [4] 500 [4] Medium [3] Medium Short Medium Long [3]<br />
commercial 1,000 [5] 1,000 [5] Medium Medium Medium Medium Long [3]<br />
2,000 [6] 1,000 [6] Medium Medium Long Long Long<br />
5A Assembly & 1,000 1,000 Medium [2] Medium Short Medium Long [3]<br />
recreational 2,000 2,000 Medium Medium Medium Medium Long [3]<br />
(high risk) 4,000 2,000 Medium Medium Long Long Long<br />
5B Assembly & 1,500 1,500 Medium [2] Medium Short Medium Long [3]<br />
recreational 3,000 3,000 Medium Medium Medium Medium Long [3]<br />
(low risk) 6,000 3,000 Medium Medium Long Long Long<br />
6A Industrial 500 500 Medium Medium Medium Medium Long [3]<br />
(high risk) 6,000 3,000 Medium Medium Long Long Long<br />
6B Industrial 2,000 2,000 Medium Medium Medium Medium Medium<br />
(low risk) 15,000 7,500 Medium Medium Long Long Long<br />
7A Storage 200 200 Medium Medium Medium Medium Long [3]<br />
(high risk) 1,000 500 Medium Medium Long Long Long<br />
7B Storage 500 500 Medium Medium Medium Medium Medium<br />
(low risk) 5,000 2,500 Medium Medium Long Long Long<br />
7C Open-sided Unlimited Unlimited Short Medium Short Short Short<br />
car park<br />
Notes:<br />
1. In a building of purpose groups 3 and 5-7, areas may be doubled where there is an appropriate fire<br />
control system.<br />
2. Short duration for –<br />
a. external walls more than 1 m of the boundary; and<br />
b. external walls not more than 1 m from the boundary in the case of a building with an appropriate<br />
fire control system.<br />
3. Medium duration for compartmentation.<br />
4. 1,000 m 2 , provided there is an appropriate fire control system.<br />
5. 2,000 m 2 , provided there is an appropriate fire control system.<br />
6. Unlimited, provided there is an appropriate fire control system.<br />
9D Amdt: September 2001