10.09.2014 Views

UFC Construction Allowances and Installation Requirements

UFC Construction Allowances and Installation Requirements

UFC Construction Allowances and Installation Requirements

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>UFC</strong> 2-000-05N<br />

31 JAN 2005<br />

Table 74040-7 POOL/BILLIARDS DEMAND CALCULATION<br />

Note # Dem<strong>and</strong> Units x Usage Factor = Peak Dem<strong>and</strong><br />

(1) ____ Bowling Lanes x 0.22 machines per lane = ____ tables<br />

(2)<br />

____ Non-Bowling Patrons<br />

per Peak Hour<br />

x<br />

0.20 table-hours per<br />

patron<br />

= + ____ tables<br />

Total Dem<strong>and</strong> (round to the nearest whole unit) = ____ tables<br />

74040-6 SPACE ALLOWANCES. Space allowances for Bowling Centers are<br />

determined according to the planning criteria presented in Table 74040-8 below. The<br />

total allowance for a facility is the sum total of the space allowances for each functional<br />

component. The number of units of each component required to meet the dem<strong>and</strong> is<br />

obtained from the calculations in Tables 74040-1 through 74040-7.<br />

Table 74040-8 SPACE ALLOWANCES FOR BOWLING CENTERS<br />

Note Table Functional Component<br />

A, B<br />

ACTIVITY AREAS<br />

Bowling<br />

Bowling Lanes (incl. pin<br />

spotting, settee, promenade,<br />

lockers)<br />

#<br />

Units<br />

x<br />

Space<br />

Allocation<br />

Factor<br />

=<br />

Total<br />

NSF<br />

___ x 650 NSF per lane = ___<br />

A, B Workroom ___ x 70 NSF per lane = +___<br />

Food Service<br />

C<br />

Snack Bar (incl. seating,<br />

kitchen, serving counter, ___ x 27 NSF per lane = +___<br />

storage)<br />

D<br />

Lounge (incl. seating, bar,<br />

storage)<br />

___ x 20 NSF per lane = +___<br />

(1) E<br />

Combined Snack Bar/Lounge<br />

(incl. seating, kitchen, serving ___ x 25 NSF per lane = +___<br />

counter, bar, storage)<br />

(2) Meeting/Function Room ___ x 12 NSF per lane = +___<br />

Games<br />

Video Games ___ x 30 NSF per lane = +___<br />

Pool/Billiards ___ x 370 NSF per lane = +___<br />

Subtotal Activity Areas = +___<br />

ACTIVITY SUPPORT AREAS<br />

Toilets 3% x Subtotal Activity Areas = +___<br />

Administration (incl. pro shop,<br />

control counter, storage)<br />

3% x Subtotal Activity Areas = +___<br />

Subtotal Activity Support Areas = +___<br />

BUILDING SUPPORT<br />

AREAS<br />

Minimum or<br />

Maximum<br />

NSF<br />

120 NSF min.<br />

840 NSF max.<br />

1,000 NSF<br />

max.<br />

700 SERIES - 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!