01.10.2014 Views

ANNUAL REPORT 2010 / 2011 - MINDS

ANNUAL REPORT 2010 / 2011 - MINDS

ANNUAL REPORT 2010 / 2011 - MINDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BUILDING & FACILITIES<br />

COMMITTEE<br />

Standing from left to right: Mr Terence Wong, Ms Karen Er, Mr Mike Koh, Mr Howard Yap, Mr Lim Yeow Khee, Mr James Wong,<br />

Mr Philip Tong, Mr Simon Low, Mr Michael Wang<br />

Not in picture: Mr Eric Seah<br />

Chairman<br />

Member<br />

Manager,<br />

Facilities/Procurement<br />

Facilities Officer<br />

Mr Lim Yeow Khee<br />

Mr Howard Yap<br />

Mr Terence Wong<br />

Mr James Wong<br />

Head, NTDC<br />

Supervisor, SMEDC<br />

Admin/Ops Manager, FGS<br />

Admin/Ops Manager, TGS<br />

Admin/Ops Manager, LGS<br />

Admin/Ops Manager, WGS<br />

Mr Mike Koh<br />

Ms Karen Er<br />

Mr Eric Seah<br />

Mr Philip Tong<br />

Mr Michael Wang<br />

Mr Simon Low<br />

The Building & Facilities Committee (BFC) oversees <strong>MINDS</strong> portfolio<br />

of facilities and provides guidance to the four schools and the seven<br />

centres in the area of facilities management, cyclical maintenance and<br />

upgrading works.<br />

Composition<br />

The Committee comprises 2 volunteers and 8 staff members with<br />

competencies in Building Construction, Civil Engineering, Quantity<br />

Surveying, Operations and Facilities Management. The diversity of their<br />

knowledge, skills and experience allows for useful exchange of ideas<br />

and views to support the BFC objectives.<br />

<strong>MINDS</strong> facilities are maintained in good condition and regularly<br />

upgraded to meet new demands and operational efficiency.<br />

MILESTONES AND ACHIEVEMENTS<br />

The committee held five meetings during the financial year. During<br />

the period, the Committee embarked on cyclical maintenance projects<br />

for Ang Mo Kio Training & Development Centre (ATDC) and Clementi<br />

Training & Development Centre (CTDC).<br />

Cyclical maintenance is carried out at pre-determined intervals to repair,<br />

refurbish and renew equipment and facilities necessitated from wear<br />

and tear, breakdown, obsolescence and expiry of their useful life.<br />

The multi-purpose hall flooring at Towner Gardens School (TGS) was<br />

upgraded and re-floored with Eco-Green Eco-Art Design Technology<br />

Engineering Single Plank Flooring. This product is in the Green Building<br />

Product Listing certified by Singapore Green Building Council (SGBC).<br />

Numerous minor improvement works were carried out to re-configure<br />

the respective centres, providing more space to the users, enhancing<br />

the centres further and giving a fresher look.<br />

Periodic structural inspections as required by BCA were carried out<br />

by certified Professional Engineers (PE) at Lee Kong Chiang Gardens<br />

School (LGS) and SIA-<strong>MINDS</strong> Employment Development Centre<br />

(SMEDC).<br />

At <strong>MINDS</strong>ville@Napiri, Fire Certificate Inspection was conducted<br />

in September <strong>2010</strong>. SCDF inspected the whole building and have<br />

renewed the Fire Safety Fitness Certificate.<br />

FY <strong>2011</strong>/12 WORKPLAN<br />

The work plan for <strong>2011</strong>/12 will focus on reviewing cyclical maintenance<br />

and upgrading works at <strong>MINDS</strong>-HQ, SMEDC, <strong>MINDS</strong>ville@Napiri, LGS<br />

and TGS .<br />

Major renovation work will be carried out in SMEDC and <strong>MINDS</strong> HQ<br />

to improve space utilisation and general condition of the operational<br />

areas.<br />

The Committee will also look into developing long term maintenance<br />

programmes for all the facilities and carry out awareness training<br />

for staff at all levels to build a culture of environment excellence in<br />

<strong>MINDS</strong>.<br />

Some of the activities in our work plan for FY <strong>2011</strong>/2012 will include:<br />

• SMEDC – Cyclical Maintenance<br />

• SMEDC and <strong>MINDS</strong> HQ – Additions & Alterations and Upgrading<br />

Works (carried out concurrently with cyclical maintenance)<br />

• <strong>MINDS</strong>ville@Napiri – Cyclical maintenance<br />

• IEDC – Washroom facilities at level #01, convert recreation room<br />

to AHP work areas<br />

• Building and hygiene inspections<br />

• Building maintenance inspections<br />

• Emergency Preparedness and Fire Safety Awareness for Schools,<br />

TDCs and EDCs<br />

<strong>MINDS</strong> <strong>ANNUAL</strong> <strong>REPORT</strong> <strong>2010</strong> / <strong>2011</strong> 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!