CONSULTANT:<br />
BILLS OF QUANTITIES -<br />
DATE:APR.2008<br />
BILL No. 7 INTERNAL FINISHES - CARPENTRY AND JOINERY WORKS (SEC- 03)<br />
ITEM<br />
NO.<br />
DESCRIPTION UNIT QUANTITY<br />
(SECTION NO. ' 3 ‘)<br />
INTERNAL FINISHES.<br />
CARPENTRY AND JOINERY WORKS<br />
Sizes of carpentry <strong>works</strong> given in the Bills of Quantities<br />
are skeleton sizes and shall be as per Drawings.<br />
RATE<br />
AMOUNT<br />
US$ CENT US$ CENT<br />
Sizes of doors and other items mentioned in the Bills of<br />
Quantities shall allow for tolerance to suit the structural<br />
openings shown in the Drawings:<br />
Wooden doors and pair of doors shall be measured in<br />
number for each structural opening, unless stated<br />
otherwise in the Bills of Quantities.<br />
Rates for carpentry and joinery work shall include:<br />
a) Shop and coordinated drawings..<br />
b) Allowance for plastering and tiling and the like.<br />
c) Cutting and fitting around obstructions, Bedding and<br />
painting.<br />
d) Grounds, blocking and backings.<br />
e) Plugging concrete, block work, and stonework, and<br />
making well ,frame insulation beneath tiles<br />
f) Ironmonger including wally cylindrical locks ,wally or<br />
wqual handles stoppers, screws, temporary fixing, refixing,<br />
oiling and adjusting.<br />
g)Providing 3 keys for each lock including tagging.<br />
h) Glass and glazing including cutting to size and putty.<br />
i)Preparing surfaces to receive finishes.<br />
j) Painting, varnishing, polishing, oiling, and the like, to<br />
any area or width in any location including work in<br />
multicolor and cutting in edges and putty.<br />
Page 16