BILLS OF QUANTITIES - Name of Project<br />

CONSULTANT:Name of Office<br />

DATE: APR.2008<br />

SKELETON WORKS - CONCRETE WORKS (SEC- 02)<br />

ITEM<br />

RATE<br />

AMOUNT<br />

DESCRIPTION<br />

UNIT QUANTITY<br />

NO. US$ CENT US$ CENT<br />

(SECTION NO. ' 2 ‘)<br />

SKELETON WORKS.<br />

CONCRETE WORKS.<br />

Preamble.<br />

Rates of Concrete Works shall include: -<br />

1. All form <strong>works</strong> and shuttering in any form, shape and<br />

size. Making chamfered and curved edges, allowing for<br />

and making grooves and sleeves and the like; removal of<br />

forms and cleaning of all exposed tie wires and rods;<br />

making good the harmed surfaces and edges and all<br />

surface finishing.<br />

2. Supplying, Casting, vibrating and curing as per<br />

specifications.<br />

3. Approved additives and admixtures.<br />

4. Incurred costs on Concrete Mix Designs, Sample<br />

taking, testing and providing test results certificates,<br />

storing and saving of samples, and preparation of bar<br />

bending schedules and <strong>works</strong>hops.<br />

5. Supplying reinforcement of any grade, size and length<br />

as detailed in the drawings, storing on <strong>site</strong> including<br />

cutting, bending and fixing in position and providing all<br />

tying wires, spacers, shop drawings, testing and bar<br />

bending schedules<br />

6. Painting of exposed surfaces of underground<br />

reinforced concrete elements with two coats of hot<br />

bituminous paint (75/25) ,or cold applied rubberized<br />

bitumen emulsion protective coating with fiber<br />

reinforcement, the strokes of each layer to be oppo<strong>site</strong> to<br />

each other.<br />

7. Steel bars used for alignment and fixing of<br />

reinforcement <strong>works</strong>, and extra steel added to assure<br />

proper detailing and safety.<br />

8. Temporary support and formwork.<br />

9. Measurement of Concrete elements shall be the net<br />

dimensions as detailed in the drawings. All recesses,<br />

openings and voids shall be deducted.<br />

10. Measurement shall be only for the seen surfaces of<br />

elements. Overlapping and measuring items twice under<br />

separate headings shall not be allowed.<br />

Slabs are measured from the External Edge of external walls.<br />

All beams, drop beams, projection including fair face, sun<br />

breakers, and any part casted together with the slab will be<br />

included in the price of the slab.<br />

Columns are to be measured from top level of the slab to the<br />

bottom level of the beam or dropped beam.<br />

11.All mesurements are as indicated in the drawings<br />

12. Steel Reinforcement is included in concrete price<br />

Page 6