together with all transport temporary plumbing, storage and<br />

distribution, pay all charges and alter adapt and maintain<br />

temporary work as necessary remove and make good at completion.<br />

3-9<br />

A 24 ELECTRICITY FOR THE WORKS<br />

<strong>SPECIFICATIONS</strong><br />

<strong>GENERAL</strong><br />

The Contractor shall make all necessary arrangements and<br />

provide all artificial lighting and power for the proper<br />

execution and security if the Works and its protection.<br />

With all meters temporary wiring and fittings, pay all charges<br />

and alter, adapt and maintain the temporary works as necessary<br />

and remove and make good at completion<br />

A 25 PROVISION <strong>OF</strong> PLANT <strong>AND</strong> TOOLS<br />

The Contractor shall provide and install all necessary hoists,<br />

ladders, scaffolding. Staging, tackles, tarpaulins, tools,<br />

vehicles, and other plant (mechanical and otherwise) and allow<br />

for altering adapting and maintaining them in good condition as<br />

necessary and eventually removing from site and making good.<br />

A 26 TEMPORARY BARRIERS, FENCING ETC...<br />

The Contractor is to provide all temporary barriers, fencing,<br />

hoarding, guard rails, gates, and the like as may be necessary<br />

to protect the public and others, for proper execution of the<br />

Works and shall remove and clear away at completion of the<br />

Works and make good all work disturbed.<br />

A 27 INCONSISTENCY IN CONTRACT DOCUMENTS<br />

The Contractor shall execute the Works according to the<br />

provisions of the Contract Documents. Any work indicated in one<br />

of the documents but omitted and/or stated in one or more of<br />

the other documents shall be treated as though it were included<br />

in all of them.<br />

If any two documents of the Contract conflict as to the quality<br />

of the work to be carried out, the discrepancy shall be brought<br />

to the notice of the Engineer, who shall instruct the<br />

Contractor which of the two conflicting documents to regard as<br />

correct.<br />

If the Contractor should discover that any work has been<br />

omitted and/or not indicated entirely or partially from all the<br />

documents, but that such work is essential to the safety or<br />

proper functioning of the works, he shall report the facts<br />

immediately to the Engineer. If the work is something which in