the barrel of the pipe and the trench wall shall be 20mm<br />

on each side of the pipe. The width of the trench above<br />

that level may be as wide as necessary for sheeting and<br />

bracing and the proper performance of the work.<br />

Trench for Water Supply System shall be of a depth to<br />

provide minimum cover over the top of 300mm and avoid<br />

interference of water lines with other utilities. Width<br />

of trench shall be a maximum of 200mm on each side of the<br />

pipe.<br />

The width of trenches for electrical and telephone cables<br />

shall be as specified in their relative section. Banks<br />

may be sloped or widened to facilitate placement of<br />

cables, but not to an extend that will cause interference<br />

with other utilities.<br />

Excavation for appurtenant structures for manholes,<br />

septic tank, percolating pit and similar structures shall<br />

be sufficient to allow a minimum of 300mm of clear space<br />

between their outer surfaces shoring timbers which may be<br />

used to protect the banks.<br />

3-20<br />

<strong>SPECIFICATIONS</strong><br />

EXCAVATIONS<br />

B 13<br />

BACKFILL <strong>AND</strong> FILL<br />

Approved suitable excavated material as specified under<br />

“MATERIALS” shall be used in the backfilling and filling<br />

next to footings, foundations underground structures,<br />

under sub-floors, etc... and shall be laid in layers not<br />

exceeding 200mm and compacted with compaction equipment,<br />

as approved by the Engineer. Moisture content shall be<br />

adjusted as directed by the Engineer and 95% of dry<br />

weight compaction accordance to ASTM: D1557-70 shall be<br />

achieved.<br />

Should the quantity of the excavated material be not<br />

sufficient for the process of backfill and fill, the<br />

Contractor shall obtain the quantity required of such<br />

backfill and fill from approved borrow pits and transport<br />

same to the Site of work at his own expense.<br />

No backfill shall be executed until the footings,<br />

foundations, etc., have been inspected, measured and<br />

approved by the Engineer.<br />

Trenches should be backfilled until all required tests<br />

are performed and until the Engineer has verified that<br />

the Utility systems have been installed in accordance<br />

with the