NRDA F-1-Schedule-D- Section-II – SCOPE OF WORK<br />

Construction of Forest and Water Resources Department Buildings at Sector-19 of <strong>Naya</strong> <strong>Raipur</strong><br />

NRDA<br />

• External Glass Reinforced Concrete (GRC) jail work secured using MS sub frames<br />

• Provision and installation of Metal jail work in external areas<br />

• Provision and installation Stainless steel railing work<br />

c) Detailed Interior Items<br />

• False ceiling work in Gypsum and mineral fiber grid ceilings<br />

• Flooring work using Natural stone( Granite, Kotha stone, Vitrified tiles/Ceramic<br />

tiles)<br />

• Dado work in toilets/pantry area using Ceramic tiles<br />

• Laminated paneling work on walls-<br />

• Wall finishing using Putty, Acrylic emulsion and Textured paint finishes<br />

• Acoustical panel installation in Auditorium works<br />

• Internal GRC work<br />

Site Development including road network and landscaping<br />

• Cutting, filling and leveling of the site as per the site layout and achieving the desired<br />

site levels<br />

• Preparation and laying of Road work in Bitumen and Concrete as per the<br />

specification laid down in the detailed site drawings, preparation of pave red and<br />

tiled areas.<br />

• Road side curbstone ,appropriate road markings and signage<br />

• Surface preparation and tree plantation as per the details provided under the<br />

horticulture scheme<br />

• Preparation of landscape features, installation of artwork as specified.<br />

• Clearing and finishing the site in a manner that it shall be deemed t be completely fit<br />

for operation and use according to the satisfaction of the Engineer in charge.<br />

II. Electrification Works<br />

The work to be carried out under this contract comprises of internal and external electrical<br />

Installation of the project as called in the tender documents. The Electrical Contractor shall<br />

include for the supply of the whole of the materials in accordance with the Specifications<br />

and the whole of the work of fixing necessary for the complete installation as set out in<br />

these Specifications and with the accompanying schedule and drawings, commencing from<br />

the supply authority’s terminals. This also include any material, appliances, equipment not<br />

specifically mentioned herein or noted on the drawings as being furnished or installed but<br />

which are necessary and Customary to make the installation complete in all respects. In<br />

general the work to be performed under this contract shall comprise supply, installation,<br />

testing & commissioning of the following<br />

• All conduit work including junction boxes, outlet boxes, wiring & earthing for lighting<br />

& power.<br />

• All conduit work including junction boxes, outlet boxes & wiring for LV systems such<br />

as voice, data, fire alarm, paging, CCTV, Access control & MATV etc.<br />

• Switches, plug sockets, cover plates and wiring accessories.<br />

• Emergency lighting, wiring, Inverter/UPS.<br />

• DG Sets Installation and commissioning.<br />

• Earth pits & earth strip for earthling the body of the motors is being provided by the<br />

Electrical Contractor.<br />

• Substation, HT Switchgear and HT Cabling.<br />

Signature of Contractor……………………………....<br />

Signature of NRDA………………………..…………<br />