NRDA F-1- Schedule-D- Section III- Technical Specification of Works<br />

Construction of Forest and Water Resources department buildings, North Block at <strong>Naya</strong> <strong>Raipur</strong><br />

NRDA<br />

The board assembly shall also take care of the following requirements :<br />

Lamp indication shall be provided to indicate ON/ OFF (By red/green respectively) of switchgear.<br />

Healthy trip supply shall be indicated by clear lamp.<br />

Separate fuses shall be provided for lamps heaters and voltmeters, other instrumentation etc. on<br />

each panel.<br />

Anti-condensation space heaters suitable for each panel if specified. Supply and control<br />

equipment for the above shall be provided by the tenderer.<br />

12. Control Wiring<br />

All control, auxiliary and small wiring shall be carried out with stranded copper conductor PVC<br />

insulated cables. Wiring shall be colour coded and neatly laid out in bunches and firmly fastened to<br />

the steel members of the panel. All potential circuits shall be protected by HRC fuses near the tapoff<br />

points from the main connections. The termination’s shall be crimped with proper sockets. All<br />

the conductors shall be provided with printed PVC ferrules at both ends for easy identification.<br />

Suitable terminal blocks of reputed make shall be provided for terminating the control, auxiliary and<br />

small wiring and are same as described in the section "Medium Voltage Power Control Centres and<br />

Switch board panels" stated elsewhere.<br />

13. Surface treatment<br />

All sheet metal accessories and components of HT switchboard enclosure shall be thoroughly<br />

cleaned, decreased, de-rusted and hot dip phosphatised before a cot of red oxide primer is applied.<br />

The panel shall then be stove enamelled to the required final finish. The interior surfaces of the<br />

panel shall be off-white shade an the exterior shall be of battleship grey on any other approved<br />

shade.<br />

14. Name plates<br />

15. Testing<br />

The name plate shall be as per `Equipment Schedule-A'.<br />

The high tension panel shall be tested at factory after assembling of all components. The tests shall<br />

be conducted as BS:116 or ASTA Standards. The original test certificate shall be submitted alongwith<br />

the panel. The following tests shall be conducted.<br />

a) Impulse withstand test<br />

b) One minute power frequency withstand test.<br />

c) Breaking capacity and making capacity for circuit breakers.<br />

d) Insulation resistance test for all auxiliary and secondary wiring.<br />

16. Storing, Erection and Commissioning<br />