RSB Approved Version- 4 th August <strong>2008</strong><br />

3.2.7. Emirates National Grid<br />

The Emirates National Grid (ENG) began operating in May 2006, via the<br />

interconnection between Abu Dhabi and Dubai.<br />

Recent Summer peak <strong>ADWEC</strong> export contracts with DEWA, FEWA and SEWA are<br />

shown below for information purposes:<br />

<strong>ADWEC</strong>’s Peak Export Contracts (MW)<br />

Summer 2006 Summer 2007<br />

DEWA 400 700<br />

FEWA 500 500<br />

SEWA - 200<br />

sub-total 900 1400<br />

From June 2006 onwards the ENG was used to export approximately 400 MW from<br />

Abu Dhabi to Dubai. The total capacity <strong>of</strong> the ENG between Abu Dhabi and Dubai is<br />

approximately 1150 MW. Connection <strong>of</strong> the SEWA system to the ENG occurred in<br />

May 2007. Connection to the remaining Northern Emirates transmission networks via<br />

the Dhaid 400 kV sub-station was completed in April <strong>2008</strong>.<br />

3.2.9. GCC Grid<br />

From 2010 onwards the TRANSCO network will be a key part <strong>of</strong> the Gulf<br />

Cooperation Council (GCC) Grid. <strong>ADWEC</strong> will then have the optimal location with<br />

which to trade electricity via the following interconnections :<br />

• 900 MW between Abu Dhabi and Saudi Arabia (GCC Grid)<br />

• 1150 MW between Abu Dhabi and Dubai (ENG)<br />

• 400 MW between Abu Dhabi and Oman (GCC Grid).<br />

So <strong>ADWEC</strong> could export up to 2450 MW via the GCC / ENG grids.<br />

Note that the above interconnections estimates are maximum potential trades based on<br />

the various agreements and not expected trades. Note also that the interconnector<br />

capacities may exceed the values shown above providing further opportunities for<br />

trade. The GCC Grid and ENG will therefore present <strong>ADWEC</strong> with good<br />

opportunities for trading electricity with its neighbouring utilities and thereby<br />

lowering <strong>ADWEC</strong>’s economic procurement costs through higher efficiency and<br />

higher load factors etc.<br />

<strong>Statement</strong> <strong>of</strong> <strong>Future</strong> <strong>Capacity</strong> <strong>Requirements</strong> <strong>2008</strong> – 2030 20