RSB Approved Version- 4 th August <strong>2008</strong><br />

6. Available Water <strong>Capacity</strong><br />

The existing, under construction, committed and planned capacities are shown in the<br />

table below.<br />

Existing, Under Construction, Committed and Planned Capacities<br />

Gross Water <strong>Capacity</strong> (MIGD)<br />

Station <strong>2008</strong> 2009 2010 2011 2012 2013<br />

Umm al Nar East A<br />

Umm al Nar East B 20 20 20<br />

Umm al Nar West 1-6 24 24 24<br />

Umm al Nar West 7-8 6 6 6<br />

UAN - New (Sas Al Nakhl) 95 95 95 95 95 95<br />

APC 145 145 145 95 95 95<br />

AMPC 39 39 39 39 39 39<br />

Taweelah B1 70 70 70 70 70 70<br />

Taweelah B2 23 23 23 23 23 23<br />

Taweelah B New 35 69 69 69 69 69<br />

TAPCO 128 162 162 162 162 162<br />

GTTPC 85 85 85 85 85 85<br />

ECPC 51 51 51 51 51 51<br />

SCIPCO S1 101 101 101 101 101 101<br />

Shuweihat S2 101 101 101<br />

ESWPC Fujairah F1 102 102 102 102 102 102<br />

Fujairah F2 132 132 132 132<br />

Shuweihat S3 101 101<br />

Available <strong>Capacity</strong> 651 685 817 868 969 969<br />

Assumed capacity lifetime extensions are shown in green.<br />