23.10.2014 Views

ADWEC 2008 Statement of Future Capacity Requirements 2008 ...

ADWEC 2008 Statement of Future Capacity Requirements 2008 ...

ADWEC 2008 Statement of Future Capacity Requirements 2008 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RSB Approved Version- 4 th August <strong>2008</strong><br />

<strong>2008</strong> <strong>Statement</strong>’s Assumed Generation Outage Rates<br />

Reliability Data<br />

Company Stations<br />

FOR (%) MOR (days) MOR (%) Availability (%)<br />

BPC Al AIN 5.0% 40 11.0% 84.0%<br />

APC IWPP<br />

TAPCO IWPP<br />

UNE-A<br />

UNW-1-6<br />

UNW-7-8<br />

SAN<br />

TAW B1<br />

TAW B2<br />

TANE<br />

3.6% 10 2.7% 93.7%<br />

2.5% 10 2.7% 94.8%<br />

MRF 5.0% 40 11.0% 84.0%<br />

AMPC<br />

MZD 5.0% 10 2.7% 92.3%<br />

ECPC IWPP TAW A2 2.0% 12 3.3% 94.7%<br />

GTTPC IWPP TAW A1 3.3% 10 2.7% 94.0%<br />

SCIPCO IWPP SHT 1 3.3% 9 2.5% 94.2%<br />

SembCorp IWPP FUJ-1 1.4% 14 3.8% 94.8%<br />

FAPCO IWPP FUJ-2 3.3% 13 3.6% 93.1%<br />

FOR = Forced Outage Rate<br />

MOR = Maintenance Outage Rate<br />

4.2 Assumed Desalination Outage Rates<br />

For water, the required capacity is calculated according to a Desalination Security<br />

Standard (DSS) methodology specified by the RSB. This is a risk based<br />

methodology restricting the risk <strong>of</strong> loss <strong>of</strong> water supply to the Abu Dhabi consumers<br />

to 2% (once in 50 years), in contrast to the previous methodology, in which a constant<br />

margin (5% <strong>of</strong> demand) was added to the water demand to calculate the required<br />

capacity.<br />

<strong>Statement</strong> <strong>of</strong> <strong>Future</strong> <strong>Capacity</strong> <strong>Requirements</strong> <strong>2008</strong> – 2030 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!