RSB Approved Version – 4 th August <strong>2008</strong><br />

<strong>ADWEC</strong> Base Electricity Methodology<br />

for Residential / Commercial Mega Projects<br />

Mega Projects’ Developers Connected Load Forecasts<br />

<strong>ADWEC</strong> Demand / Diversity Factors<br />

Developers’ Connected Load x <strong>ADWEC</strong> Demand / Diversity Factors<br />

= Unadjusted Developers’ Mega Projects Peak Demand Forecast<br />

Peak Demand Forecast Adjustment Factors for 2013 / 2020 / 2030<br />

UPC’s Total Population Forecasts<br />

versus<br />

Mega Projects Developers’ Total Population Forecasts<br />

Mega Projects’ Population Curve Pro-rated to obtain Intermediate Years<br />

<strong>ADWEC</strong> Base Electricity Demand Forecast<br />

Mega Projects Forecasting Uncertainties<br />

1) Timing / Size <strong>of</strong> Mega Projects.<br />

• Implementation needs to be synchronized with the development <strong>of</strong> utility capacity<br />

and vice versa.<br />

• Shortage <strong>of</strong> contractors / labour could result in delays.<br />

• Mega Projects’ Developers timing estimates are usually optimistic, actual timing is<br />

likely to be delayed by at least 1 – 2 years.<br />

2) Population<br />

• Population / Number <strong>of</strong> new expatriates living in Mega Projects.<br />

3) Developers’ Demand Forecasts provided to <strong>ADWEC</strong>.<br />

• Relationship between Electricity Peak Demand and Electricity Connected Load<br />

depends on Demand & Diversity Factors.<br />

• Peak Demand will likely lag Connected Load because <strong>of</strong> lag associated with moving<br />

in etc.<br />

4) Unannounced Mega Projects - less important now that UPC in place.<br />

5) District Cooling: use in place <strong>of</strong> Conventional Air Conditioning.<br />

6) Waste Water: Desalinated water use in Irrigation / District Cooling etc.<br />

7) Industry: Zonescorp (Special Economic Zones / clusters /worker cities),<br />

Khalifa Port Industrial Zone (KPIZ), ADBIC and ADNOC etc.<br />

Source: <strong>ADWEC</strong> Electricity Demand Forecast <strong>2008</strong> – 2030 presentation, www.adwec.ae.<br />

<strong>Statement</strong> <strong>of</strong> <strong>Future</strong> <strong>Capacity</strong> <strong>Requirements</strong> <strong>2008</strong> – 2030<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!