RSB Approved Version – 4 th August <strong>2008</strong><br />

transmission and distribution networks. Other factors must be considered when<br />

designing these networks, particularly their service lives. It is simply not practical or<br />

economical to upgrade the transmission and distribution networks regularly, every<br />

five years or so. This is another reason <strong>ADWEC</strong> prepares very long-term demand<br />

forecasts. It is however up to the transmission and distribution companies to decide<br />

upon what year <strong>of</strong> the forecast to target and what additional factors must be<br />

considered in their network planning.<br />

Northern Emirates<br />

<strong>ADWEC</strong>’s committed water exports to the Northern Emirates are shown below.<br />

<strong>ADWEC</strong>’s Contracted Water Supplies to the Northern Emirates<br />

Peak MGD <strong>2008</strong> 2009 2010 - 2030<br />

FEWA Contract 10 10 10<br />

FEC Contract 0 0 10<br />

SEWA Contract 5 5 5<br />

Other 5 5 5<br />

Total 20 20 30<br />

<strong>Statement</strong> <strong>of</strong> <strong>Future</strong> <strong>Capacity</strong> <strong>Requirements</strong> <strong>2008</strong> – 2030<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!