<strong>Arrow</strong> <strong>Bowen</strong> Gas <strong>Project</strong> EIS | Executive summary<br />
Figure 5. Relationship of the Environmental Framework to the <strong>Arrow</strong> HSEMS<br />
Environmental Impact statement<br />
Environmental Impact statement<br />
Environmental values<br />
(sensitivity/constraint)<br />
Constraints analysis<br />
(GIS layers/maps)<br />
Commitments<br />
(mitigation measures and<br />
recommendations)<br />
Permissible project activities<br />
and applicable environmental<br />
management controls<br />
arrow hsems<br />
Environmental Policy<br />
Standard operating<br />
procedures<br />
Inspection and<br />
monitoring<br />
Approvals<br />
Environmental<br />
Management Plan<br />
planning<br />
and design<br />
Site and<br />
route selection<br />
Construction and<br />
operation<br />
Construction<br />
Management Plan<br />
Environmental Authority<br />
Ecological and<br />
preconstruction<br />
clearance surveys<br />
Work Plans<br />
Development Plan<br />
Equipment and<br />
materials selection<br />
and facility design<br />
Operations and<br />
maintenance procedures<br />
13