<strong>Arrow</strong> <strong>Bowen</strong> Gas <strong>Project</strong> EIS | Executive summary<br />

5 Field Development Planning 24<br />

5.1 Limitations and Opportunities 24<br />

5.2 Development Planning 24<br />

5.2.1 Exploration and Test Drilling 25<br />

5.2.2 Environmental and Social Constraints 25<br />

5.2.3 Development Plans 25<br />

6 Impact Assessment 27<br />

6.1 Climate 27<br />

6.2 Air Quality 27<br />

6.3 Greenhouse Gas 28<br />

6.4 Contaminated Land 29<br />

6.5 Soils and Land Suitability 29<br />

6.6 Geology 29<br />

6.7 Groundwater 30<br />

6.8 Surface Water 32<br />

6.9 Aquatic Ecology 33<br />

6.10 Terrestrial Ecology 33<br />

6.11 Environmentally Sensitive Areas 34<br />

6.12 Land Use and Tenure 36<br />

6.12.1 Co-existence with Mining 39<br />

6.13 Landscape and Visual Amenity 39<br />

6.14 Roads and Transport 40<br />

6.15 Noise and Vibration 40<br />

6.16 Economics 41<br />

6.16.1 Regional Context 41<br />

6.16.2 Gross Regional, State and National Product 41<br />

6.16.3 Government Taxes and Revenues 41<br />

6.16.4 Impacts on Employment, Workforce,<br />

Business, Population and Wages 42<br />

6.16.5 Impacts on the Property Market 42<br />

6.16.6 Economic Impact Issues and Mitigation 42<br />

6.17 Social 43<br />

6.17.1 Regional Context 43<br />

6.17.2 Social Impact Issues and Mitigation 43<br />

6.18 Cultural Heritage 44<br />

6.18.1 Indigenous Cultural Heritage 44<br />

6.18.2 Non Indigenous Cultural Heritage 45<br />

6.18.3 Mitigation Measures 45<br />

6.19 Preliminary Hazard and Risk 45<br />

6.20 Waste 46<br />

6.21 Decommissioning and Rehabilitation 46<br />

7 Cumulative Impacts 47<br />

7.1 Groundwater 49<br />

7.2 Social and Economic 49<br />

7.3 Roads and Traffic 49<br />

8 Environmental Management 50<br />

8.1 Environmental Management System 51<br />

8.2 Environmental Management Plans 52<br />

9 Ecological Sustainable Development 52<br />

10 Submissions 54<br />

Tables<br />

Table 1 EIS Milestone Dates 5<br />

Table 2 EIS Viewing Locations 6<br />

Table 3 Certified <strong>Project</strong> Area Reserves in Petajoules as<br />

at 31 December 2011 10<br />

Table 4 Permissible <strong>Project</strong> Activities based on Level of Constraint 12<br />

Table 5 Indicative Field Development Timing for Reference Case 14<br />

Table 6 <strong>Bowen</strong> Gas <strong>Project</strong> Main <strong>Project</strong> Components 19<br />

Table 7 Environmental and Social Design Specifications<br />

of <strong>Arrow</strong>’s HSEMS 25<br />

Table 8 Predicted Concentrations for Regional Scale Scenario 1<br />

(Year 2023) and Scenario 2 (worst case) 27<br />

Table 9 <strong>Project</strong> Contribution Estimates of Greenhouse Gas<br />

Emissions 28<br />

Table 10 Stakeholder Contributions on Managing <strong>Project</strong> Impacts 44<br />

Table 11 HSEMS Roles and Responsibilities 51<br />

Table 12 Requirements for Public Submission 54<br />

Figures<br />

Figure 1 <strong>Project</strong> Location 3<br />

Figure 2 <strong>Arrow</strong> LNG <strong>Project</strong> 4<br />

Figure 3 Approvals Process for Petroleum Gas Activities 8<br />

Figure 4 Australian Gas Resources by Basin 10<br />

Figure 5 Relationship of the Environmental Framework<br />

to the <strong>Arrow</strong> HSEMS 13<br />

Figure 6 <strong>Project</strong> Development Area 15<br />

Figure 7 Gas and Water Production and Treatment 18<br />

Figure 8 Indicative SIS Well Schematic 20<br />

Figure 9 Conceptual Integrated Processing Facility Arrangement 21<br />

Figure 10 Conceptual CSG Water Management Overview 22<br />

Figure 11 Conceptualisation of Groundwater Resources 30<br />

Figure 12 Environmentally Sensitive Areas 35<br />

Figure 13 Good Quality Agricultural Land 37<br />

Figure 14 Potential Strategic Cropping Land 38<br />

Figure 15 <strong>Project</strong>s Considered in Cumulative Impacts Assessment 48<br />

Plates<br />

Plate 1 Typical Production Wellhead 19<br />

Plate 2 Central Gas Processing Facility 20