Motorvision Drawout (MVD) Technical Manual - PBSI Group Ltd
Motorvision Drawout (MVD) Technical Manual - PBSI Group Ltd
Motorvision Drawout (MVD) Technical Manual - PBSI Group Ltd
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>MVD</strong> TECHNICAL MANUAL<br />
1.1. Protective Functions.<br />
Max Start Time Protection<br />
Thermal Overload Protection with adjustable t6x and hot/cold ratio and fixed pre alarm<br />
Undercurrent Protection<br />
Load Increase Protection<br />
Low Set Overcurrent Protection<br />
Overfrequency Protection<br />
Underfrequency Protection<br />
Single Phase Protection<br />
Phase Rotation Protection<br />
Phase Unbalance Protection<br />
Undervoltage Protection<br />
Undervoltage Start Lockout<br />
Earth Fault Protection<br />
Excess Number of Starts Protection<br />
Overvoltage Protection<br />
Backspin Protection<br />
Power Factor Protection<br />
Short Circuit Protection<br />
Contactor Fault Protection<br />
Emergency Stop Protection<br />
Serial Timeout Protection<br />
Internal Error Protection<br />
Serial Inhibit Protection<br />
10 External Semi-Customised Digital Inputs<br />
Configurable 2 Channel Trip Circuit Supervision Protection (Optional)<br />
1.2. Displayed Drive Data.<br />
Phase & Average Amps<br />
Last Start Data<br />
Earth Fault Current<br />
Number of Trips<br />
Percentage Unbalance<br />
Total Operations, Start A<br />
Percentage Motor Load<br />
Total Operations, Start B<br />
3 Phase Voltage k(M/G/T)W Hours<br />
Percentage Thermal Capacity<br />
k(M/G/T)VA Hours<br />
Motor Status<br />
k(M/G/T)W Max Demand<br />
Power k(M/G/T)W<br />
k(M/G/T)VA Apparent Power<br />
Power Factor<br />
k(M/G/T)VAr Real Power<br />
Running Status<br />
Last Stop Source with time and date<br />
Frequency<br />
Time to Reaccelerate<br />
Time & Date<br />
Time to Clear Inhibit<br />
Hours Run<br />
Last Peak I<br />
Hours Run This Start<br />
Last Start Source with time and date<br />
Reference Start Curve (graphic)<br />
Last Start Curve (graphic)<br />
Start Curve (graphic)<br />
Time to Trip<br />
Time to Reset<br />
Page 2 Issue 1 03/2008 P&B Engineering