01.11.2014 Views

Motorvision Drawout (MVD) Technical Manual - PBSI Group Ltd

Motorvision Drawout (MVD) Technical Manual - PBSI Group Ltd

Motorvision Drawout (MVD) Technical Manual - PBSI Group Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MVD</strong> TECHNICAL MANUAL<br />

1.1. Protective Functions.<br />

Max Start Time Protection<br />

Thermal Overload Protection with adjustable t6x and hot/cold ratio and fixed pre alarm<br />

Undercurrent Protection<br />

Load Increase Protection<br />

Low Set Overcurrent Protection<br />

Overfrequency Protection<br />

Underfrequency Protection<br />

Single Phase Protection<br />

Phase Rotation Protection<br />

Phase Unbalance Protection<br />

Undervoltage Protection<br />

Undervoltage Start Lockout<br />

Earth Fault Protection<br />

Excess Number of Starts Protection<br />

Overvoltage Protection<br />

Backspin Protection<br />

Power Factor Protection<br />

Short Circuit Protection<br />

Contactor Fault Protection<br />

Emergency Stop Protection<br />

Serial Timeout Protection<br />

Internal Error Protection<br />

Serial Inhibit Protection<br />

10 External Semi-Customised Digital Inputs<br />

Configurable 2 Channel Trip Circuit Supervision Protection (Optional)<br />

1.2. Displayed Drive Data.<br />

Phase & Average Amps<br />

Last Start Data<br />

Earth Fault Current<br />

Number of Trips<br />

Percentage Unbalance<br />

Total Operations, Start A<br />

Percentage Motor Load<br />

Total Operations, Start B<br />

3 Phase Voltage k(M/G/T)W Hours<br />

Percentage Thermal Capacity<br />

k(M/G/T)VA Hours<br />

Motor Status<br />

k(M/G/T)W Max Demand<br />

Power k(M/G/T)W<br />

k(M/G/T)VA Apparent Power<br />

Power Factor<br />

k(M/G/T)VAr Real Power<br />

Running Status<br />

Last Stop Source with time and date<br />

Frequency<br />

Time to Reaccelerate<br />

Time & Date<br />

Time to Clear Inhibit<br />

Hours Run<br />

Last Peak I<br />

Hours Run This Start<br />

Last Start Source with time and date<br />

Reference Start Curve (graphic)<br />

Last Start Curve (graphic)<br />

Start Curve (graphic)<br />

Time to Trip<br />

Time to Reset<br />

Page 2 Issue 1 03/2008 P&B Engineering

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!