Summary Report and Implementation Plan - Partners in Project Green
Summary Report and Implementation Plan - Partners in Project Green
Summary Report and Implementation Plan - Partners in Project Green
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Wet ponds can be designed as an efficient end-of-pipe facility<br />
for water quality, erosion <strong>and</strong> quantity control. They may also be<br />
designed with recreational, <strong>and</strong> other values <strong>in</strong> m<strong>in</strong>d contribut<strong>in</strong>g<br />
to the character of a community <strong>and</strong> becom<strong>in</strong>g the centrepiece of<br />
a new development.<br />
• Catchment 219 Stormwater Management<br />
Model<strong>in</strong>g, Assessment <strong>and</strong> Characterization<br />
Study – a catchment study focus<strong>in</strong>g on a<br />
“characteristic” sewershed with<strong>in</strong> the study<br />
area was completed <strong>in</strong> order to develop<br />
recommendations for the other upstream<br />
sewersheds. Catchment 219 was “characteristic”<br />
<strong>in</strong> that it <strong>in</strong>cludes various elements from a<br />
variety of similar <strong>in</strong>dustrial catchments, <strong>and</strong><br />
therefore the results (<strong>and</strong> treatment scenarios)<br />
could be implemented <strong>in</strong> other areas of the<br />
watershed. The study produced n<strong>in</strong>e treatment<br />
scenarios provid<strong>in</strong>g associated costs of <strong>in</strong>creased<br />
stormwater controls <strong>and</strong> impacts on stormwater<br />
quantity <strong>and</strong> quality.<br />
15