There was a breakthrough in selling of<br />
wind power transformers in the Americas,<br />
when the first 38 units of 2300 kVA SLIM®<br />
transformers were sold to Enercon for the<br />
Ripley Wind Farm in Canada<br />
In Pauwels, too, there have been several<br />
capacity increasing initiatives in <strong>2007</strong>-08.<br />
Investments were made in the Indonesian plant<br />
to raise capacities. This involved setting up a<br />
floating core coil assembly platform; installing a<br />
second drying oven; and a heavy duty vacuum<br />
pump. The distribution transformer facility at<br />
Cavan (Ireland) increased efficiency by 5% at<br />
little or no cost, and also added additional shifts<br />
in the bottleneck areas to increase output. The<br />
distribution transformer facility in the US is in<br />
the midst of an expansion programme which<br />
will facilitate manufacture of 10MVA through 60<br />
MVA medium power transformers up to 138 KV,<br />
650 KV BIL.<br />
$ DEVELOPING NEW MARKETS AND<br />
CUSTOMERS The SBU’s power transformer<br />
division achieved 32% growth over last year<br />
in its international orders. Export orders were<br />
obtained from eight new countries, including<br />
Greece, Trinidad, Qatar, Jordan and Ecuador. The<br />
division also supplied a new product: 2 X<br />
250 MVA 230/220 KV transformers for the<br />
Singapore and Malaysian power grids. Oman<br />
and Guatemala were countries where the<br />
division supplied equipment for the first time.<br />
Pauwels continued enjoying successes in the<br />
wind power industry, especially in Southern<br />
Europe, mainly Spain, where several new<br />
customers signed on to the SLIM® or bioSLIM®<br />
solution throughout <strong>2007</strong>-08. In addition, there<br />
was a breakthrough in selling of wind power<br />
transformers in the Americas, when the first 38<br />
units of 2300 kVA SLIM® transformers were sold<br />
to Enercon for the Ripley Wind Farm in Canada.<br />
Ganz’s transformers have also been getting<br />
new orders in Europe — in Spain, Belgium,<br />
Ireland and the UK.<br />
Ganz is executing one of its largest single GIS<br />
orders for the Steel Authority of India Limited’s<br />
Bhilai steel plant for 10 bays of 220 KV GIS and<br />
16 bays of 132 KV GIS. It also obtained an order<br />
for Power Grid Corporation of India Ltd for the<br />
supply of three bays of 132 KV GIS. In addition,<br />
the division became an approved vendor for<br />
customers such as Delhi Metro Rail Corporation,<br />
Reliance Energy, Torrent Power and the Nuclear<br />
Power Corporation of India. International<br />
marketing of switchgear also received a boost<br />
with new orders from Italy, Malaysia, Chile,<br />
Spain, Canada, Myanmar and Vietnam.<br />
A SLIM® TRANSFORMER BEING INSTALLED INSIDE THE WORLD’S HIGHEST TURBINE IN THE NORTHERN<br />
PART OF GERMANY<br />
Ganz is executing one of its largest single<br />
GIS orders for the Steel Authority of India<br />
Limited’s Bhillai steel plant for 10 bays of<br />
220 KV GIS and 16 bays of 132 KV GIS<br />