Dispatchable Load
Dispatchable Load
Dispatchable Load
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Equipment outages and consumption<br />
changes<br />
•Market participants are informed of the specific<br />
equipment designated for outage reporting at<br />
the time of facility registration. Outage slips (for<br />
information) are required for all planned<br />
equipment outages or material changes to<br />
consumption.<br />
• Following a forced equipment outage or a<br />
material change to its consumption, outage slips<br />
(for information) are required for outages<br />
expected to last longer than 8 hours. *<br />
20 April 2005 IESO Market Operations Standing<br />
Committee Meeting<br />
15