Equipment outages and consumption<br />

changes<br />

•Market participants are informed of the specific<br />

equipment designated for outage reporting at<br />

the time of facility registration. Outage slips (for<br />

information) are required for all planned<br />

equipment outages or material changes to<br />

consumption.<br />

• Following a forced equipment outage or a<br />

material change to its consumption, outage slips<br />

(for information) are required for outages<br />

expected to last longer than 8 hours. *<br />

20 April 2005 IESO Market Operations Standing<br />

Committee Meeting<br />