Equipment outages and consumption<br />
changes - continued<br />
•For a planned outage, or following a forced<br />
outage, the dispatch data must be revised to be<br />
consistent with the outage plan or the expected<br />
consumption during the forced outage.<br />
•If a material consumption change is planned<br />
during an hour, the participant must notify the<br />
IESO of the change. IESO shall approve unless<br />
there is a reliability reason preventing it.<br />
•A forced change must be reported to the IESO.<br />
20 April 2005 IESO Market Operations Standing<br />
Committee Meeting<br />