Light Truck Frame Joint Stiffness Study Phase 1 Final Report
Light Truck Frame Joint Stiffness Study Phase 1 Final Report
Light Truck Frame Joint Stiffness Study Phase 1 Final Report
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TESTING PROCEDURE<br />
Table 2: Test <strong>Joint</strong> <strong>Stiffness</strong> Summary<br />
Kx Ky Kz<br />
<strong>Joint</strong> 1: Tube- Through-Tube (welded at<br />
both ends)<br />
2.563 KNm/deg 2.372 KNm/deg 2.573 KNm/deg<br />
<strong>Joint</strong> 2: Box to Lipped Channel<br />
8.415 KNm/deg 3.909 KNm/deg 50.429 KNm/deg<br />
<strong>Joint</strong> 3: Tube Through Partially Boxed<br />
Section (welded on both sides)<br />
1.940 KNm/deg 4.211 KNm/deg 2.979 KNm/deg<br />
<strong>Joint</strong> 4: Alligator to box Section (welded to<br />
both flanges)<br />
0.452 KNm/deg 1.081<br />
KNm/deg<br />
0.816 KNm/deg<br />
<strong>Joint</strong> 5: Hat Section to Box Section<br />
(welded all around)<br />
0.116 KNm/deg 0.180 KNm/deg 0.494 KNm/deg<br />
<strong>Report</strong>: A/SP-005-1 <strong>Light</strong> <strong>Truck</strong> <strong>Frame</strong> <strong>Joint</strong> <strong>Stiffness</strong> <strong>Study</strong> 46