16.11.2014 Views

MOLDED-CASE CIRCUIT BREAKERS & EARTH ... - Piti Group

MOLDED-CASE CIRCUIT BREAKERS & EARTH ... - Piti Group

MOLDED-CASE CIRCUIT BREAKERS & EARTH ... - Piti Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Special Purpose Breakers<br />

MDU Breakers<br />

NF630-SEP, NF630-HEP, NF800-SEP, NF800-HEP with MDU<br />

Front-Connection<br />

110<br />

32<br />

Trip<br />

button<br />

PE<br />

14<br />

40<br />

51<br />

140<br />

210<br />

3-pole<br />

85<br />

90<br />

Insulating barrier<br />

(removable)<br />

Mounting hole<br />

Current<br />

indication LED<br />

OVER<br />

PAL<br />

MDU<br />

70%<br />

MDU<br />

terminal<br />

cover<br />

70<br />

35<br />

210<br />

280<br />

50<br />

4-pole<br />

32<br />

102<br />

8<br />

15<br />

Conductor t max. 94.5<br />

600AF t8<br />

800AF t12<br />

87 275 87<br />

Neutral<br />

pole<br />

φ14<br />

M12 bolt<br />

51<br />

75<br />

30<br />

5<br />

97<br />

103<br />

φ14<br />

107<br />

131<br />

155<br />

8<br />

φ8<br />

8<br />

600AF 44<br />

800AF 46<br />

15<br />

600AF 44<br />

800AF 46<br />

Dimension of terminal<br />

directly connected to<br />

conductor<br />

φ8.5<br />

40<br />

22<br />

600AF 24<br />

800AF 26<br />

12<br />

Conductor t max.<br />

600AF t8<br />

800AF t10<br />

Conductor drilling for<br />

direct connection<br />

70<br />

3-pole<br />

Breaker<br />

M6 taps<br />

or φ7<br />

Drilling plan<br />

70<br />

4-pole<br />

243<br />

Rear-Connection<br />

Front-plate cutout<br />

1mm clearance on each<br />

side of handle.<br />

Mounting<br />

plate<br />

Connection<br />

allowance<br />

25<br />

Stud can be<br />

rotated 90°<br />

MDU<br />

M6 taps<br />

or φ7<br />

Breaker<br />

Eddy-current<br />

heat-reducing slit<br />

5<br />

4-pole<br />

(Load side of breaker mounting has given<br />

the space to pass wires to the terminal.)<br />

4-pole<br />

15<br />

10<br />

3-pole<br />

Breaker<br />

3-pole<br />

Breaker<br />

8<br />

40<br />

243<br />

295<br />

12.5<br />

243<br />

R6<br />

R6<br />

13<br />

46<br />

10<br />

113<br />

110<br />

32<br />

φ13<br />

M12 bolt<br />

8<br />

140<br />

M6 breaker<br />

mounting<br />

screw<br />

70<br />

140<br />

φ48<br />

70<br />

70<br />

210<br />

6<br />

(86)<br />

51<br />

46<br />

138<br />

172<br />

51<br />

92<br />

3-pole<br />

4-pole<br />

172<br />

Drilling plan<br />

<br />

<br />

Note:The drilling plan is different if insulating barriers are installed.<br />

CC-Link ; only MDU panel mounting<br />

NF400-SEP, NF400-HEP, NF630-SEP, NF630-HEP, NF800-SEP, NF800-HEP with MDU (CC-Link)<br />

MDU panel mounting<br />

MDU is connected with circuit breaker via MDU connection cable.<br />

MDU Terminal<br />

Figure of the breaker mounting<br />

is removed the terminal cover.<br />

Upper<br />

side<br />

43.1<br />

Operation/display<br />

side<br />

M3 screw<br />

38<br />

Terminal<br />

PE screw(M4)<br />

104.5<br />

12<br />

28.5<br />

Terminal<br />

block<br />

55<br />

75<br />

70<br />

58.5<br />

23<br />

Panel<br />

Panel holder<br />

plate<br />

MDU<br />

connector<br />

48<br />

M3<br />

screw<br />

67.5<br />

Terminal<br />

cover<br />

M3 screw<br />

M3 nut<br />

85<br />

90<br />

96<br />

M3 nut<br />

Panel<br />

thickness<br />

1~3.2mm<br />

90<br />

75<br />

MDU display<br />

part<br />

R2<br />

86.5<br />

40<br />

72<br />

Space greater than the value<br />

shown in the figure below<br />

must be secured, and must be<br />

separate 10cm or more from the<br />

distribution line.<br />

76<br />

Front panel cutout<br />

Type<br />

NF400-SEP<br />

NF400-HEP<br />

NF630-SEP<br />

NF800-SEP<br />

NF630-HEP<br />

NF800-HEP<br />

For the set<br />

installation<br />

A<br />

263<br />

393<br />

272<br />

282<br />

B<br />

205<br />

205<br />

221<br />

221<br />

402 221<br />

A<br />

B<br />

In case of front connection,<br />

keep space between MDU<br />

and conductor or insulation<br />

barrier too.<br />

<br />

<br />

Terminal block<br />

Control power<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

L2<br />

L1<br />

1 2 3 4<br />

SLD DG DB DA<br />

5 6 7 8<br />

SLD DG DB DA<br />

L1L2 1 2 3 4 5 6<br />

1<br />

2<br />

3<br />

4<br />

FG SLD DG DB DA<br />

5<br />

Control power<br />

6<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!