PRE-CONSTRUCTION SAFETY REPORT<br />

CHAPTER 14: DESIGN BASIS ANALYSIS<br />

SUB-CHAPTER : <strong>14.7</strong><br />

PAGE : 17 / 48<br />

Document ID.No.<br />

UKEPR-0002-149 Issue 02<br />

5. CONCLUSION<br />

The safety measures described in this sub-chapter are illustrated <strong>and</strong> detailed for each transient<br />

considered in the fault schedule. This fault schedule illustrates that the plant is protected by two<br />

diverse lines of protection for the most frequent events as detailed in the analyses of functional<br />

diversity provided in Sub-chapter 16.5. The efficiency of the plant to protect people <strong>and</strong> the<br />

environment from radiation exposure is highlighted in the deterministic radiological<br />

consequences analyses provided in Sub-chapter 14.6 <strong>and</strong> the probabilistic analyses provided in<br />

Sub-chapter 15.5. These two contributions form an important element in the demonstration that<br />

the ALARP principle is met by the UK EPR.