19.11.2014 Views

14.7 - Fault and Protection Schedule - EDF Hinkley Point

14.7 - Fault and Protection Schedule - EDF Hinkley Point

14.7 - Fault and Protection Schedule - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PRE-CONSTRUCTION SAFETY REPORT<br />

CHAPTER 14: DESIGN BASIS ANALYSIS<br />

SUB-CHAPTER : <strong>14.7</strong><br />

PAGE : 23 / 48<br />

Document ID.No.<br />

UKEPR-0002-149 Issue 02<br />

SUB-CHAPTER <strong>14.7</strong> - TABLE 1: FAULT AND PROTECTION SCHEDULE TABLE: FAULTS AT FULL POWER (6/24)<br />

Input to classification<br />

SAFETY FUNCTION<br />

MAIN LINE<br />

DIVERSE LINE<br />

<strong>Fault</strong><br />

description<br />

Category<br />

References<br />

Frequency<br />

PCSR<br />

Ref.<br />

Main Safety<br />

Function<br />

Transient phases<br />

Cont.<br />

state<br />

Safe<br />

state<br />

Final<br />

state<br />

Plant Level Safety Function<br />

Based on EPR process <strong>and</strong><br />

international practice for<br />

PWR<br />

Safety Cat.<br />

Lower Level Safety Function<br />

Combination of the Plant Level<br />

Safety Function <strong>and</strong> the<br />

conditions of operations<br />

(normal, incident, accident)<br />

Safety Functional Groups<br />

Item<br />

Safety<br />

class<br />

System<br />

Req.<br />

C&I<br />

platform<br />

Lower Level Safety Function<br />

Combination of the Plant Level<br />

Safety Function <strong>and</strong> the<br />

conditions of operations<br />

(normal, incident, accident)<br />

Safety Functional Groups<br />

Item<br />

Safety<br />

class<br />

Syst<br />

Req.<br />

Supporting study<br />

Comments<br />

Decrease in RCS water inventory<br />

Reactor trip - auto<br />

Emergency boron injection into<br />

the core - diversified<br />

Small break (not<br />

greater than<br />

DN50) including<br />

a break<br />

occuring on the<br />

Extra Boration<br />

System<br />

injection line<br />

(State A)<br />

PCC-3<br />

10 -4 /(r.y)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!