19.11.2014 Views

14.7 - Fault and Protection Schedule - EDF Hinkley Point

14.7 - Fault and Protection Schedule - EDF Hinkley Point

14.7 - Fault and Protection Schedule - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PRE-CONSTRUCTION SAFETY REPORT<br />

CHAPTER 14: DESIGN BASIS ANALYSIS<br />

SUB-CHAPTER : <strong>14.7</strong><br />

PAGE : 31 / 48<br />

Document ID.No.<br />

UKEPR-0002-149 Issue 02<br />

Input to classification<br />

SUB-CHAPTER <strong>14.7</strong> - TABLE 1: FAULT AND PROTECTION SCHEDULE TABLE: FAULTS AT FULL POWER (14/24)<br />

SAFETY FUNCTION<br />

MAIN LINE<br />

DIVERSE LINE<br />

<strong>Fault</strong><br />

description<br />

Category<br />

References<br />

Frequency<br />

PCSR<br />

Ref.<br />

Main Safety<br />

Function<br />

Transient phases<br />

Cont.<br />

state<br />

Safe<br />

state<br />

Final<br />

state<br />

Plant Level Safety Function<br />

Based on EPR process <strong>and</strong><br />

international practice for<br />

PWR<br />

Safety Cat.<br />

Lower Level Safety Function<br />

Combination of the Plant Level<br />

Safety Function <strong>and</strong> the<br />

conditions of operations<br />

(normal, incident, accident)<br />

Safety Functional Groups<br />

Item<br />

Safety<br />

class<br />

System<br />

Req.<br />

Lower Level Safety Function<br />

Combination of the Plant Level<br />

Safety Function <strong>and</strong> the<br />

conditions of operations<br />

(normal, incident, accident)<br />

Safety Functional Groups<br />

Item<br />

Safety<br />

class<br />

Syst<br />

Req.<br />

Supporting study<br />

Comments<br />

Increase in Heat Removal<br />

Reactivity<br />

Control<br />

x<br />

x<br />

x<br />

x<br />

x<br />

Shutdown <strong>and</strong> maintain core<br />

sub-criticality<br />

Prevention of uncontrolled<br />

positive reactivity insertion<br />

into the core<br />

A<br />

A<br />

A<br />

Negative reactivity fast insertion<br />

High concentrated boron<br />

injection<br />

RCS overcooling protection<br />

Reactor trip - auto<br />

dP/dt<br />

Actuation PZR P, SG P, Cont<br />

P, DNBR<br />

Front. Syst. CRDM<br />

Emergency boron injection into<br />

the core - Auto<br />

Activ. & Elec SG P<br />

Front. Syst. EBS<br />

Turbine Trip<br />

Actuation RT checkback<br />

Front. Syst.<br />

Turbine admission<br />

valves<br />

Full load MFW isolation (4 SG)<br />

Actuation RT checkback<br />

Front. Syst.<br />

Full load MFW<br />

isolation valves<br />

EFW isolation (1 SG)<br />

Actuation Manual<br />

Front. Syst.<br />

EFWS injection lines<br />

Class 1<br />

Class 1<br />

Class 1<br />

Class 1<br />

Class 1<br />

F1A<br />

F1A<br />

F1A<br />

F1A<br />

F1A<br />

PS<br />

PS<br />

PS<br />

PS<br />

PS<br />

x<br />

Steam line isolation (1SG)<br />

Activ. & Elec dP/dt, SG P<br />

Front. Syst. MSIV<br />

Class 1<br />

F1A<br />

PS<br />

Steam system<br />

line break<br />

(states A <strong>and</strong> B)<br />

PCC-4<br />

10-6/(r.y)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!