PRE-CONSTRUCTION SAFETY REPORT<br />
CHAPTER 14: DESIGN BASIS ANALYSIS<br />
SUB-CHAPTER : <strong>14.7</strong><br />
PAGE : 31 / 48<br />
Document ID.No.<br />
UKEPR-0002-149 Issue 02<br />
Input to classification<br />
SUB-CHAPTER <strong>14.7</strong> - TABLE 1: FAULT AND PROTECTION SCHEDULE TABLE: FAULTS AT FULL POWER (14/24)<br />
SAFETY FUNCTION<br />
MAIN LINE<br />
DIVERSE LINE<br />
<strong>Fault</strong><br />
description<br />
Category<br />
References<br />
Frequency<br />
PCSR<br />
Ref.<br />
Main Safety<br />
Function<br />
Transient phases<br />
Cont.<br />
state<br />
Safe<br />
state<br />
Final<br />
state<br />
Plant Level Safety Function<br />
Based on EPR process <strong>and</strong><br />
international practice for<br />
PWR<br />
Safety Cat.<br />
Lower Level Safety Function<br />
Combination of the Plant Level<br />
Safety Function <strong>and</strong> the<br />
conditions of operations<br />
(normal, incident, accident)<br />
Safety Functional Groups<br />
Item<br />
Safety<br />
class<br />
System<br />
Req.<br />
Lower Level Safety Function<br />
Combination of the Plant Level<br />
Safety Function <strong>and</strong> the<br />
conditions of operations<br />
(normal, incident, accident)<br />
Safety Functional Groups<br />
Item<br />
Safety<br />
class<br />
Syst<br />
Req.<br />
Supporting study<br />
Comments<br />
Increase in Heat Removal<br />
Reactivity<br />
Control<br />
x<br />
x<br />
x<br />
x<br />
x<br />
Shutdown <strong>and</strong> maintain core<br />
sub-criticality<br />
Prevention of uncontrolled<br />
positive reactivity insertion<br />
into the core<br />
A<br />
A<br />
A<br />
Negative reactivity fast insertion<br />
High concentrated boron<br />
injection<br />
RCS overcooling protection<br />
Reactor trip - auto<br />
dP/dt<br />
Actuation PZR P, SG P, Cont<br />
P, DNBR<br />
Front. Syst. CRDM<br />
Emergency boron injection into<br />
the core - Auto<br />
Activ. & Elec SG P<br />
Front. Syst. EBS<br />
Turbine Trip<br />
Actuation RT checkback<br />
Front. Syst.<br />
Turbine admission<br />
valves<br />
Full load MFW isolation (4 SG)<br />
Actuation RT checkback<br />
Front. Syst.<br />
Full load MFW<br />
isolation valves<br />
EFW isolation (1 SG)<br />
Actuation Manual<br />
Front. Syst.<br />
EFWS injection lines<br />
Class 1<br />
Class 1<br />
Class 1<br />
Class 1<br />
Class 1<br />
F1A<br />
F1A<br />
F1A<br />
F1A<br />
F1A<br />
PS<br />
PS<br />
PS<br />
PS<br />
PS<br />
x<br />
Steam line isolation (1SG)<br />
Activ. & Elec dP/dt, SG P<br />
Front. Syst. MSIV<br />
Class 1<br />
F1A<br />
PS<br />
Steam system<br />
line break<br />
(states A <strong>and</strong> B)<br />
PCC-4<br />
10-6/(r.y)