Akinwale Aboyade, LUMES Thesis, 2003/2004<br />

supposing the efficiency of the collection system in place is 60%, the potential electricity generation<br />

from Olusosun is depicted in the chart below(figure 4.4) under the following other assumptions.<br />

<br />

<br />

An energy generation potential of 33.8MJ/m 3 of methane,<br />

electricity conversion efficiency of internal combustion engine is 25% with an availability<br />

factor of 85% (i.e. 15% downtime)<br />

120,000.00<br />

14<br />

100,000.00<br />

12<br />

80,000.00<br />

10<br />

60,000.00<br />

40,000.00<br />

20,000.00<br />

0.00<br />

Figure 4.7 Potential electricity generation from Olusosun SWDS<br />

From the graph we see that should the plant start operating in 2005, it is possible to produce about<br />

70,000MWh from say, an internal combustion engine with installed capacity of about 8MW, and to do<br />

until 2005.The extra gas is flared.<br />

CERs are generated whether the<br />

methane is flared or combusted as in<br />

both cases methane is destroyed to<br />

form the less potent CO 2 and water.<br />

According to the model, the landfill<br />

could generate about 544,000 tCO 2 e<br />

annually or up 13.124 million tCO 2 e<br />

of methane emissions over 21 years.<br />

According to CDM regulations,<br />

CER’s are also generated from the<br />

CO 2 avoided through the<br />

displacement of grid based electricity<br />

1991<br />

1993<br />

1995<br />

1997<br />

1999<br />

2001<br />

2003<br />

2005<br />

2007<br />

2009<br />

2011<br />

2013<br />

2015<br />

40,000.00<br />

35,000.00<br />

30,000.00<br />

25,000.00<br />

20,000.00<br />

15,000.00<br />

10,000.00<br />

5,000.00<br />

0.00<br />

2017<br />

2019<br />

2021<br />

2023<br />

2025<br />

8<br />

6<br />

4<br />

2<br />

0<br />

2004<br />

2006<br />

2008<br />

2010<br />

2012<br />

2014<br />

2016<br />

2018<br />

2020<br />

2022<br />

2024<br />

Potential electricity<br />

production in MWh<br />

Potential installed<br />

capacity<br />

0.00<br />

Figure 4.8 Potential ER’s from Olusosun<br />

800,000.00<br />

700,000.00<br />

600,000.00<br />

500,000.00<br />

400,000.00<br />

300,000.00<br />

200,000.00<br />

100,000.00<br />

Estimated<br />

collectible<br />

methane<br />

(Tonnes)<br />

CO2<br />

equivalent<br />

(Tonnes)<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!