Wale Aboyade's thesis - lumes
Wale Aboyade's thesis - lumes
Wale Aboyade's thesis - lumes
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Akinwale Aboyade, LUMES Thesis, 2003/2004<br />
supposing the efficiency of the collection system in place is 60%, the potential electricity generation<br />
from Olusosun is depicted in the chart below(figure 4.4) under the following other assumptions.<br />
<br />
<br />
An energy generation potential of 33.8MJ/m 3 of methane,<br />
electricity conversion efficiency of internal combustion engine is 25% with an availability<br />
factor of 85% (i.e. 15% downtime)<br />
120,000.00<br />
14<br />
100,000.00<br />
12<br />
80,000.00<br />
10<br />
60,000.00<br />
40,000.00<br />
20,000.00<br />
0.00<br />
Figure 4.7 Potential electricity generation from Olusosun SWDS<br />
From the graph we see that should the plant start operating in 2005, it is possible to produce about<br />
70,000MWh from say, an internal combustion engine with installed capacity of about 8MW, and to do<br />
until 2005.The extra gas is flared.<br />
CERs are generated whether the<br />
methane is flared or combusted as in<br />
both cases methane is destroyed to<br />
form the less potent CO 2 and water.<br />
According to the model, the landfill<br />
could generate about 544,000 tCO 2 e<br />
annually or up 13.124 million tCO 2 e<br />
of methane emissions over 21 years.<br />
According to CDM regulations,<br />
CER’s are also generated from the<br />
CO 2 avoided through the<br />
displacement of grid based electricity<br />
1991<br />
1993<br />
1995<br />
1997<br />
1999<br />
2001<br />
2003<br />
2005<br />
2007<br />
2009<br />
2011<br />
2013<br />
2015<br />
40,000.00<br />
35,000.00<br />
30,000.00<br />
25,000.00<br />
20,000.00<br />
15,000.00<br />
10,000.00<br />
5,000.00<br />
0.00<br />
2017<br />
2019<br />
2021<br />
2023<br />
2025<br />
8<br />
6<br />
4<br />
2<br />
0<br />
2004<br />
2006<br />
2008<br />
2010<br />
2012<br />
2014<br />
2016<br />
2018<br />
2020<br />
2022<br />
2024<br />
Potential electricity<br />
production in MWh<br />
Potential installed<br />
capacity<br />
0.00<br />
Figure 4.8 Potential ER’s from Olusosun<br />
800,000.00<br />
700,000.00<br />
600,000.00<br />
500,000.00<br />
400,000.00<br />
300,000.00<br />
200,000.00<br />
100,000.00<br />
Estimated<br />
collectible<br />
methane<br />
(Tonnes)<br />
CO2<br />
equivalent<br />
(Tonnes)<br />
35