HVAC Upgrades – International Center AAI #12-154<br />
B. Installer: Company specializing in performing Work of this section with minimum five<br />
years experience.<br />
1.6 PRE-INSTALLATION MEETINGS<br />
A. Pre-installation meeting.<br />
a. Contractor shall attend a pre-installation meeting at the job site with all<br />
related contractors and trades on the job. At a minimum the following<br />
shall be addressed and coordinated:<br />
1) BAS wiring diagrams, work assignments and trade<br />
responsibilities.<br />
2) Chiller plant interface requirements, wiring diagrams, work<br />
assignments and trade responsibilities.<br />
3) 120VAC power requirements for any and all locations.<br />
4) Coordinate IP connection requirements with Owners IT<br />
department.<br />
5) Review campus, floor-plan, equipment and summary graphics<br />
and obtain approval of Owner and Engineer prior to assembling<br />
the final graphics package.<br />
6) Chemical treatment vendor to coordinate blow-down signal.<br />
7) Chiller Manufacturer: Coordinate chiller interface requirements<br />
and sequences of operation with chiller manufacturer.<br />
B. Convene prior to commencing work of this section.<br />
C. Keep meeting minutes and submit to Engineer of Record within 5 business days of<br />
meeting.<br />
1.7 FIELD MEASUREMENTS<br />
A. Verify field measurements prior to fabrication.<br />
1.8 MAINTENANCE SERVICE<br />
A. Furnish service and maintenance of control systems for one year from Date of Substantial<br />
Completion.<br />
B. Furnish two complete inspections per year, one in each season, to inspect, calibrate, and<br />
adjust controls. Submit written report after each inspection.<br />
C. Include systematic examination, adjustment, and lubrication of unit, and controls<br />
checkout and adjustments. Repair or replace parts in accordance with manufacturer's<br />
operating and maintenance data. Use parts produced by manufacturer of original<br />
equipment.<br />
D. Perform work without removing units from service during building normal occupied<br />
hours.<br />
E. Provide emergency call back service at all hours for this maintenance period.<br />
DIRECT DIGITAL CONTROL FOR HVAC 23 09 23 - 5