HVAC Upgrades – International Center AAI #12-154<br />

2.3 VORTEX SEPERATOR/PUMP SYSTEM<br />

A. Manufacturers:<br />

1. Lakos<br />

2. Puroflux<br />

3. Substitutions: As approved by Engineer prior to bid date. .<br />

B. Supply a packaged separator system with pump, completely factory assembled. The<br />

packaged system shall include a centrifugal vortex type separator, integral pump and<br />

schedule 80 PVC interconnecting piping. The complete system shall be mounted on an<br />

epoxy coated steel skid.<br />

C. The separator shall be a dumbbell type design with a true tangential entry to ensure<br />

proper helical flow. The separator shall have an expected solids performance rating of<br />

98% efficient at 74 microns and larger (with a specific gravity of 2.6 or greater) on a<br />

single pass. The unit shall be equipped with inlet/outlet gauges to monitor pressure drop<br />

and a manual air relief valve shall be provided at the top of the vessel.<br />

D. The separator shall be fabricated of carbon steel, rated at 150 psi working pressure<br />

(temperature dependent). The separator vessel shall be hydro tested at 1.5 times the<br />

design pressure and finished with a fusion bonded epoxy coating.<br />

E. The system pump shall be a cast iron bronze fitted close couple, end suction type, sized<br />

for the proper flow rate of the package. The pump shall be of cast iron construction and<br />

include a cast iron pre-strainer with a perforated stainless steel basket. The pump shall be<br />

provided with a standard efficiency TEFC motor.<br />

F. Purging of the accumulation chamber shall be accomplished without interrupting flow or<br />

excessive loss of system fluid.<br />

1. The separator shall be equipped with automatic controls consisting of an<br />

electrically actuated two-way brass ball valve with a HOA switch and solid state<br />

purge timer mounted in the control panel.<br />

G. The separator shall be equipped with automatic controls consisting of a motor start/stop<br />

device with overload short circuit protection, pump HOA selector switch, mounted in a<br />

NEMA 4X fiberglass enclosure. The unit shall have have a single point electrical<br />

connection.<br />

PART 3 EXECUTION<br />

3.1 INSTALLATION<br />

A. Provide pumps to operate at specified system fluid temperatures without vapor binding<br />

and cavitation, are non-overloading in parallel or individual operation, and operate within<br />

25 percent of midpoint of published maximum efficiency curve.<br />

B. Install long radius reducing elbows or reducers between pump and piping. Support piping<br />

adjacent to pump so no weight is carried on pump casings.<br />

C. Install pumps on vibration isolators. Refer to Section 23 05 48.<br />

HYDRONIC PUMPS 23 21 23 - 4