SPECIFICATION SECTION 23 21 23 HYDRONIC PUMPS<br />
Added Aurora as an acceptable pump manufacturer in Section 2.1.<br />
SPECIFICATION SECTION 23 25 00<br />
<br />
Added Section 1.11.D which indicates current status of building chemical treatment<br />
maintenance.<br />
SPECIFICATION SECTION 23 64 12 WATER COOLED WATER CHILLERS<br />
Added Multistack as an acceptable chiller manufacturer in Section 2.1.<br />
PLAN SHEET ME2.1<br />
<br />
<br />
Revised keyed note #10 to indicate ventilation fan, VF-1 to remain in its current condition.<br />
Added temporary door patch and eventual door/frame replacement requirements for Service<br />
Bay 101 exterior double doors.<br />
PLAN SHEET M10.1<br />
<br />
Added Owner Requested Graphics requirements to Cascaded Graphic User Interface<br />
Requirements.<br />
PLAN SHEET M10.2<br />
<br />
Revised bypass valve AI point to indicate a feedback signal type.<br />
PLAN SHEET M10.5<br />
Added end switch to EF-1 control damper (detail #1)<br />
Added duct static pressure high limit switch to detail #2.<br />
Revised water flow meter point type to be Analog Input (condenser water make up and<br />
blowdown meters).<br />
Deleted cooling tower basin water level control requirement (duplication of level control<br />
indicated on sheet M10.2).<br />
Added fan coil unit control diagram (detail #4).<br />
PLAN SHEET E1.2<br />
Added Add Alternate #3 keyed note description. Added key note symbol to AHU-3 controller<br />
per add alternate (install new VFD).<br />
PLAN SHEET E2.1<br />
Added Add Alternate # 2 & 3 keyed note descriptions.<br />
Added relative keyed note symbols to AHU-3 & AHU-4 controllers per add alternate (install<br />
new VFD’s).<br />
Note: Addenda Acknowledgement Form for Addendum 2 is attached herein. This form must be<br />
signed and submitted with the bid package.