EXECUTIVE SUMMARY<br />

TABLE ES-2<br />

Comparison of Alternatives Retained for Detailed Evaluation<br />

Alternatives<br />

Evaluation Criteria<br />

Ability to Meet Purpose and Need<br />

Replace Aging Infrastructure<br />

Respond to Changes in the Air<br />

Transportation System<br />

Enhance Operational Efficiency<br />

Technical and Economic Factors<br />

No Action<br />

Would not replace existing<br />

infrastructure. Renovation and<br />

rehabilitation efforts described in<br />

Section 3.1.2.1 would be required<br />

to maintain the existing facilities,<br />

but would not eliminate existing<br />

inefficiencies.<br />

Would not reconfigure terminals to<br />

support current and future air<br />

service patterns.<br />

Would continue redundancy in<br />

passenger handling facilities and<br />

inefficient aircraft circulation in the<br />

terminal area.<br />

Proposed Action<br />

Would replace existing<br />

infrastructure with modern,<br />

energy efficient facilities.<br />

Would provide flexible facilities<br />

to meet functional needs of the<br />

current air transportation system<br />

and avoid functional<br />

obsolescence in the future.<br />

Would reduce redundancy in<br />

passenger handling facilities and<br />

enhance the efficiency of aircraft<br />

circulation in the terminal area.<br />

Average Aircraft Delay (minutes per<br />

operation)<br />

Annual Cost of Aircraft Delay and<br />

Taxi In and Out Time<br />

Roadway LOS (peak period, on<br />

arrival and departure roadways)<br />

4.55 (2025). 4.04 (2025).<br />

$153 million (2025). $145 million (2025).<br />

E/F – very unacceptable (2025). A/B – good (2025).<br />

Passenger <strong>Terminal</strong> LOS<br />

Public Circulation Areas –<br />

Industry Standard = 20.5 ft 2 /PHP a<br />

Departure Lounge Areas –<br />

Industry Standard = 10.8 ft 2 /PHP a<br />

15.7 ft 2 /PHP (28 MAP, about<br />

2025).<br />

10.8 ft 2 /PHP (28 MAP, about<br />

2025).<br />

35.0 ft 2 /PHP (28 MAP, about<br />

2025).<br />

14.9 ft 2 /PHP (28 MAP, about<br />

2025).<br />

Baggage Claim Areas –<br />

6.4 ft 2 /PHP (28 MAP, about 2025). 9.3 ft 2 /PHP (28 MAP, about<br />

Industry Standard = 17.2 ft 2 /PHP a 2025).<br />

1,420 ft 2 /PHP (28 MAP, about<br />

Security Screening Checkpoints –<br />

1,750 ft 2 /checkpoint b<br />

Industry Standard =<br />

2025).<br />

1,980 ft 2 /PHP (28 MAP, about<br />

2025).<br />

Public Restrooms –<br />

2.1 ft 2 /PHP (28 MAP, about 2025). 4.8 ft 2 /PHP (28 MAP, about<br />

Industry Standard = 3.5 ft 2 /PHP c 2025).<br />

4,950 ft 2 /PHP (28 MAP, about<br />

Retail and Food/Beverage<br />

10,000 ft 2 /MEP c<br />

Concessions – Industry Standard = 2025).<br />

7,640 ft 2 /PHP (28 MAP, about<br />

2025).<br />

RDD/102790005 (NLH4349.DOCX)<br />

TBG012712153950RDD<br />

ES-13