Minister for Environment. It is important that there be an approved ‘span of <br />

time’ for a project, but there also needs to be a degree of flexibility available to <br />

the relevant parties. <br />

The requirement of the EPA was that <strong>Fremantle</strong> <strong>Ports</strong> apply to the EPA pursuant <br />

to section 45A of the EP Act for approval to ‘change the proposal’ so as to <br />

accommodate the backhoe work subsequent to the substantive dredging <br />

program. This process appeared to consume considerable time by all of the <br />

relevant parties to achieve an outcome that could be regarded by some as simply <br />

a process-­‐decision to accommodate a request to amend the ‘span of time’ for the <br />

project from 26 weeks to 29 weeks so as to provide for the completion of the <br />

backhoe work. <br />

Considerable care needs to be taken in considering the ‘span of time’ of a project <br />

to be set out in the Ministerial Statement. The timing schedule needs to be <br />

reviewed from time to time so that there is ample time to proceed through the <br />

process if an extension of the ‘span of time’ for a project is needed. Perhaps the <br />

process can be examined by the relevant authority and amended where <br />

appropriate. <br />

Appreciation by the Chairman <br />

I welcomed the opportunity to chair <strong>Fremantle</strong> <strong>Ports</strong> Dredging Reference Group. <br />

As is so often the case, I gained more from the experience than I gave. Each <br />

person attending the reference group meetings made a positive contribution, <br />

and I met many people whom I had not known before. <br />

I thank <strong>Fremantle</strong> <strong>Ports</strong> and their consultants for the professional approach each <br />

demonstrated in their <strong>submission</strong>s to the Group, and I thank all members of the <br />

Group for their inputs to the discussion. Those inputs, which came from an array <br />

of backgrounds, were very helpful and always courteous. <br />

Bernard Bowen <br />

27 May 2011 <br />