Grundfos CU 300 Installation and Operating Instructions - Geotech
Grundfos CU 300 Installation and Operating Instructions - Geotech
Grundfos CU 300 Installation and Operating Instructions - Geotech
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.4 System sizing<br />
In normal installations with the <strong>CU</strong> <strong>300</strong> <strong>and</strong> an SQE<br />
pump set to constant pressure control, the required<br />
tank size is 8 litres. Bigger tanks can be used without<br />
causing any problems.<br />
3.5 <strong>Installation</strong><br />
3.6 Location<br />
The installation must be designed for the<br />
maximum pump pressure.<br />
Before starting any work on the <strong>CU</strong> <strong>300</strong>,<br />
make sure that the electricity supply has<br />
been switched off <strong>and</strong> that it cannot be accidentally<br />
switched on.<br />
The <strong>CU</strong> <strong>300</strong> can be placed both indoors <strong>and</strong> outdoors.<br />
It must not be exposed to direct sunlight.<br />
3.7 Mounting the <strong>CU</strong> <strong>300</strong><br />
The <strong>CU</strong> <strong>300</strong> is designed for wall mounting.<br />
The box has six mounting holes (ø4), see fig. 12<br />
(dimensions stated in mm).<br />
The <strong>CU</strong> <strong>300</strong> must be mounted:<br />
• horizontally (see fig. 12) to allow condensed water,<br />
if any, to escape.<br />
• on a plane surface to avoid deformation of the<br />
box.<br />
Fig. 12<br />
104.5<br />
104.5<br />
TM01 2824 2498<br />
100<br />
140.5<br />
The <strong>CU</strong> <strong>300</strong> is supplied with a set of gaskets for the<br />
Pg screwed connections.<br />
The gaskets are to be used for the connection of<br />
cables/wires to ensure tight connections (IP 55) <strong>and</strong><br />
cable relief.<br />
12