- Page 1 and 2:
NSF Extensible Terascale Facility T
- Page 3 and 4:
Working Group Leaders Accounting Ad
- Page 5 and 6:
6.7 RP Operations: User Facing Proj
- Page 7 and 8:
1 Overview The TeraGrid is an open
- Page 9 and 10:
Further details can be found §6.2.
- Page 11 and 12:
2.1.10 2.1.11 2.1.12 2.1.13 2.1.14
- Page 13 and 14:
Figure 2-3. Illustration of the thr
- Page 15 and 16:
mapped out pathways from the bisabo
- Page 17 and 18:
The Center for Analysis and Predict
- Page 19 and 20:
density distribution. ADF/cofilin b
- Page 21 and 22:
Ranger at TACC, they simulated the
- Page 23 and 24:
Presentations at gateway telecons f
- Page 25 and 26:
USGS National Map infrastructure an
- Page 27 and 28:
Figure 4-4 Effect of adaptive optic
- Page 29 and 30:
4.2.0/. The NCSA team will support
- Page 31 and 32:
significantly improve the user expe
- Page 33 and 34:
petascale applications and tools, a
- Page 35 and 36:
Srinivasa Jampani, University Rao D
- Page 37 and 38:
efforts: Advanced Support for TeraG
- Page 39 and 40:
CMU Global Kinetic Simulations of t
- Page 41 and 42:
Heat Transfer Simulation of Suspens
- Page 43 and 44:
VanBriesen, CMU Villous Motility as
- Page 45 and 46:
• Subversion source management ha
- Page 47 and 48:
may be necessary to use a different
- Page 49 and 50:
Prof. Cheatham’s ptraj MD analysi
- Page 51 and 52:
PI: Choi (U. Nevada, Las Vegas, Ast
- Page 53 and 54:
Amanda Hughes, a PhD student of Dr.
- Page 55 and 56:
Yang Wang (PSC). Initial contact wa
- Page 57 and 58:
community. User feedback received,
- Page 59 and 60:
6 User Facing Projects and Core Ser
- Page 61 and 62:
Table 6-1. Q2 2010 Most Visited TGU
- Page 63 and 64:
“replacement” model, in which t
- Page 65 and 66:
The TGUP responded to 106,097 portl
- Page 67 and 68:
Most new documentation came as a di
- Page 69 and 70:
6.8 Information Production and Qual
- Page 71 and 72:
initial testing of NFS4 as a gatewa
- Page 73 and 74:
(pnetCDF and netCDF4) was completed
- Page 75 and 76:
provide a path to becoming Longhorn
- Page 77 and 78:
Figure 8-2: Total transfer (GB) per
- Page 79 and 80: 8.5.1 Data Movement (GridFTP) Stati
- Page 81 and 82: Figure 8-5: Total number of GridFTP
- Page 83 and 84: 8.5.2 Job Submission (GRAM) Statist
- Page 85 and 86: Figure 8-9: GRAM-submitted jobs as
- Page 87 and 88: As part of the NIGMS award, NRBSC a
- Page 89 and 90: The second issue related to adding
- Page 91 and 92: Figure 8-9. TeraGrid Computational
- Page 93 and 94: Figure 8-11. Top 20 TeraGrid PIs, Q
- Page 95 and 96: Institution Users Colorado Sch of M
- Page 97 and 98: Institution Users CSU-San Bernardin
- Page 99 and 100: objects that pass Futuregrid testin
- Page 101 and 102: 9.4.1 Technology Audit Services Pro
- Page 103 and 104: user management is complete. Local
- Page 105 and 106: developers to see what they have al
- Page 107 and 108: GIG place and orient new data. I pa
- Page 109 and 110: north of UT Austin’s main campus)
- Page 111 and 112: • Invite potential users of Gordo
- Page 113 and 114: Modules Under Development Advanced
- Page 115 and 116: Purdue RP has recruited two undergr
- Page 117 and 118: eak-out session to the regional STE
- Page 119 and 120: to coordinate press for all related
- Page 121 and 122: ER-RP Reports for Q210: NCSA TeraGr
- Page 123 and 124: The ORNL RP continues to collaborat
- Page 125 and 126: NCAR Type Title Location Date(s) Ho
- Page 127 and 128: Lab, TN Workshop Computational Thin
- Page 129: tion Industry Technology Incubator
- Page 133 and 134: Q2 ‘09 638 216 Q3 '09 504 403 Q4
- Page 135 and 136: Factory Berkeley, Berkeley Lab (LBL
- Page 137 and 138: performance analysis of parallel pr
- Page 139 and 140: them with a thorough overview of th
- Page 141 and 142: MIDAS Network software development
- Page 143 and 144: 12. Wang, S. 2010. "A Cyber-GIS Fra
- Page 145 and 146: 36. Xue, M., M. Tong, and G. Zhang,
- Page 147 and 148: press, 2010 (arXiv:0909.0011) TeraG
- Page 149 and 150: 121. Rast, M.P., Talk, “Precision
- Page 151 and 152: 171. Brown, B.P.,Talk, “Solar rot
- Page 153 and 154: 214. Cui, Y., Chourasia, A., Moore,
- Page 155 and 156: 253. Le, P.M., and D.V. Papavassili
- Page 157 and 158: 291. Liu, M.; Li, T.; Amegayibor, F
- Page 159 and 160: 338. Xu, J., M. A. Sharpe, L. Qin,
- Page 161 and 162: 387. Galan, J. F.; Brown, J.; Wildi
- Page 163 and 164: 2008 ACM/IEEE Conference on Superco
- Page 165 and 166: 461. Spinks, P.Q., Thomson, R.C., L
- Page 167 and 168: MCA06N063 498. "Emerging Photolumin
- Page 169 and 170: 543. Zhu, J., Zhu, J., Negri, A., P
- Page 171 and 172: Physics AST030030 583. N. F. Lourei
- Page 173 and 174: 634. M. S. Pindzola, J. A. Ludlow,
- Page 175 and 176: 683. C. Reisswig et al., Gravitatio
- Page 177 and 178: 726. E. Schnetter, P. Diener, N. Do
- Page 179 and 180: SI.Pkg 2.0.4.6.1 M Extension Quarte
- Page 181 and 182:
Work Package Dependencies Planned Q
- Page 183 and 184:
Work Package Dependencies Planned Q
- Page 185 and 186:
TeraGrid AUS Project Plan Work Pack
- Page 187 and 188:
TeraGrid AUS Project Plan Work Pack
- Page 189 and 190:
Work Package Dependencies Planned R
- Page 191 and 192:
Work Package Dependencies Planned R
- Page 193 and 194:
TeraGrid DV PY5 Project Plan (as of
- Page 195 and 196:
TeraGrid NOS Project Plan Work Pack
- Page 197 and 198:
Albert[85%], Bennett[45%], ongoing
- Page 199 and 200:
Project-ID WBS O P M Work Package D
- Page 201 and 202:
Project-ID WBS O P M Work Package D
- Page 203:
Project-ID WBS O P M Work Package D