TGQR 2010Q2 Report.pdf - Teragridforum.org
TGQR 2010Q2 Report.pdf - Teragridforum.org
TGQR 2010Q2 Report.pdf - Teragridforum.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Telescope<br />
Data<br />
Challenge 3b<br />
in the Chilean Andes and<br />
slated for first light in 2014<br />
and full operation by 2016,<br />
will produce over 15<br />
terabytes of raw astronomical<br />
data each night, resulting in a<br />
database catalog of 22<br />
Petabytes and an image<br />
archive of 100 Petabytes by<br />
the end of the 10-year<br />
survey. This TG allocated<br />
project addresses the goals of<br />
the second half of the third<br />
data challenge (DC3b),<br />
which focuses on the<br />
production of science data<br />
products from an archive's<br />
worth of data.<br />
discussions<br />
completed w/<br />
SDSC contacts<br />
Data<br />
Transposition<br />
Development<br />
for Exa-scale<br />
Data in<br />
Memory<br />
John Helly<br />
University of<br />
California,<br />
San Diego<br />
Cloud data is voluminous<br />
and this is a pilot study of the<br />
utility of Dash for use in<br />
CMMAP data analysis<br />
activities. Temporal<br />
snapshots of data need to be<br />
read into memory, merged,<br />
and resulting dataset is<br />
analyzed.<br />
Startup allocation<br />
was approved.<br />
Preliminary<br />
discussions<br />
completed. An<br />
OpenMP proof of<br />
concept code was<br />
developed and<br />
tested. Read 256<br />
temporal<br />
snapshots with an<br />
aggregated size<br />
of 128GB in<br />
memory<br />
11 Project Management<br />
11.1 Highlights<br />
A new section of the quarterly report Section 9 Evaluation, Monitoring, and Auditing was added<br />
now that the first XD awards have been made for the XD Technology Audit Service and the XD<br />
Technology Insertion Service.<br />
11.2 Project Management Working Group<br />
11.2.1 Tracking<br />
The IPP/WBS tracking process is continuing with project managers reviewing status with area<br />
directors. The area directors are finding the tracking process to be a useful exercise, providing<br />
138