28.12.2014 Views

TGQR 2010Q2 Report.pdf - Teragridforum.org

TGQR 2010Q2 Report.pdf - Teragridforum.org

TGQR 2010Q2 Report.pdf - Teragridforum.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Telescope<br />

Data<br />

Challenge 3b<br />

in the Chilean Andes and<br />

slated for first light in 2014<br />

and full operation by 2016,<br />

will produce over 15<br />

terabytes of raw astronomical<br />

data each night, resulting in a<br />

database catalog of 22<br />

Petabytes and an image<br />

archive of 100 Petabytes by<br />

the end of the 10-year<br />

survey. This TG allocated<br />

project addresses the goals of<br />

the second half of the third<br />

data challenge (DC3b),<br />

which focuses on the<br />

production of science data<br />

products from an archive's<br />

worth of data.<br />

discussions<br />

completed w/<br />

SDSC contacts<br />

Data<br />

Transposition<br />

Development<br />

for Exa-scale<br />

Data in<br />

Memory<br />

John Helly<br />

University of<br />

California,<br />

San Diego<br />

Cloud data is voluminous<br />

and this is a pilot study of the<br />

utility of Dash for use in<br />

CMMAP data analysis<br />

activities. Temporal<br />

snapshots of data need to be<br />

read into memory, merged,<br />

and resulting dataset is<br />

analyzed.<br />

Startup allocation<br />

was approved.<br />

Preliminary<br />

discussions<br />

completed. An<br />

OpenMP proof of<br />

concept code was<br />

developed and<br />

tested. Read 256<br />

temporal<br />

snapshots with an<br />

aggregated size<br />

of 128GB in<br />

memory<br />

11 Project Management<br />

11.1 Highlights<br />

A new section of the quarterly report Section 9 Evaluation, Monitoring, and Auditing was added<br />

now that the first XD awards have been made for the XD Technology Audit Service and the XD<br />

Technology Insertion Service.<br />

11.2 Project Management Working Group<br />

11.2.1 Tracking<br />

The IPP/WBS tracking process is continuing with project managers reviewing status with area<br />

directors. The area directors are finding the tracking process to be a useful exercise, providing<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!