29.12.2014 Views

Download - BHEL Bhopal

Download - BHEL Bhopal

Download - BHEL Bhopal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DOCUMENT NO. KVE/CAD/0513/001<br />

tender shall be informed of the fact along with the offer. Otherwise, <strong>BHEL</strong> may, at its<br />

sole discretion, reject the tender or cancel the contract at any stage of the contract.<br />

2.9 Any attempt by Bidders to exert influence on <strong>BHEL</strong> during the process of bid<br />

evaluation or award of the contract, would make their bid liable for rejection.<br />

2.10 <strong>BHEL</strong> reserves the right to go for Reverse Auction (RA) instead of opening the<br />

submitted Sealed Price Bids. This will be decided after technical evaluation of offers.<br />

Bidders to confirm their acceptance for participation in reverse auction. In case of<br />

their non-acceptance, <strong>BHEL</strong> will have the option to ignore their offer, which will be<br />

decided later and informed to them before RA.<br />

2.11 Bidders to confirm, in case a project is already being executed at same <strong>BHEL</strong> unit, a<br />

separate team will be deployed including separate Project Manager for current project.<br />

Bidder to specify details of manpower deployed to other on-going projects elsewhere<br />

in <strong>BHEL</strong>. This will be compared with total manpower committed by the bidder during<br />

empanelment. If it is found that inadequate manpower is available with the bidder, for<br />

current project, bidder may not be considered for placement of order.<br />

2.12 The Bidder shall post an adequate number of qualified and experienced personnel to<br />

execute the contract. The list of personnel (With Their Qualifications and Experience<br />

in the related area) proposed to be deployed shall be submitted as part of the<br />

technical proposal, by name and title.<br />

Except as <strong>BHEL</strong> may otherwise agree, no changes shall be made in the key manpower.<br />

If, for any reason beyond the reasonable control of the Bidder, it becomes necessary<br />

to replace any of the key manpower, the Bidder shall provide as a replacement a<br />

person of equivalent or better qualifications and experience, subject to approval of<br />

<strong>BHEL</strong>.<br />

2.13 The complete development work will be carried out on <strong>BHEL</strong> premises at <strong>BHEL</strong>,<br />

….(Location). <strong>BHEL</strong> will only provide necessary work place and the basic infrastructure<br />

for installation of Bidder's computers.<br />

2.14 For development of 3-D Model, the vendor to quote for both variants i.e. with vendor<br />

hardware / with <strong>BHEL</strong> provided Hardware.<br />

2.15 Software (including licenses for development packages) required to carry out the<br />

work shall be arranged by the Bidders.<br />

2.16 All expenses towards logistics and incidentals, including lodging, boarding, travel,<br />

furniture etc., incurred in connection with the execution of this whole contract shall be<br />

borne by the Bidders.<br />

2.17 The entire work covered in this RFP shall be entrusted to a single Bidder.<br />

2.18 The successful Bidder shall pay Security Deposit (SD) at the time of acceptance of the<br />

award of contract based on the total contract price according to pre-decided rates.<br />

EMD of the successful Bidder shall be adjusted against SD.<br />

2.19 SD shall be released on the satisfactory completion of the contract. Any penalties or<br />

dues from the Bidder will be adjusted against the bill or from SD.SD shall be forfeited<br />

if the contract is abandoned by the Bidder during the contract period.SD shall not<br />

bear any interest in any manner whatsoever.<br />

Page 18 of 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!