Hotel & Offers Engadin St. Moritz - Pontresina
Hotel & Offers Engadin St. Moritz - Pontresina
Hotel & Offers Engadin St. Moritz - Pontresina
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 12 Sports<br />
Muottas Muragl<br />
access_mc kredit<br />
Help Line 24h: Tel. +41 (0)844 00 04 70<br />
ENGADINcard<br />
DIRECT TO LIFT<br />
Book your ski lift pass online<br />
… and get onto the pistes faster!<br />
www.engadin.stmoritz.ch/<br />
directtolift_en<br />
VIP ENGADINcard<br />
The credit card with extra functions<br />
for real <strong>Engadin</strong> fans!<br />
www.engadincard.ch<br />
SPORTS<br />
THE PANORAMIC MOUNTAINS<br />
AND SMALL SKI AREAS<br />
Muottas Muragl The breathtaking views from the top station of the Muot-<br />
tas Muragl funicular are a highlight of any visit to the region. The ride up on<br />
the nostalgic funicular, more than 100 years old, takes just ten minutes. After<br />
a winter walk along the magnificent Philosophers’ Trail or a snowshoe hike<br />
along the romantic snowshoe trail, you can relax at the Romantik <strong>Hotel</strong> Muottas<br />
Muragl. This is the first plus-energy hotel in the Alps (the hotel generates more<br />
energy than it consumes), and is the winner of the Milestone environmental<br />
award, the Swiss Solar Award 2011 and the PlusEnergie-Bau ® (PEB) Solar Award<br />
2011. You can also rest or even spend the night in the new igloo village. A thrilling<br />
ride down to the valley is offered by the legendary toboggan run (toboggans<br />
and snowshoes available for hire at the base station).<br />
Lifts operate: 22 Dec 2012 – 1 Apr 2013<br />
Day pass: CHF 44.– CHF 30.– CHF 14.–<br />
Half-day pass*: CHF 38.– CHF 26.– CHF 12.–<br />
Return ride: CHF 34.– CHF 23.– CHF 11.–<br />
(Legend see page 11)<br />
Maloja–Aela A ski lift brings you up to the compact, sun-blessed ski area of<br />
Maloja – an insider’s favourite and particularly popular with powderhounds.<br />
Lifts operate: 15 Dec 2012 – 7 Apr 2013