03.01.2015 Views

Final Report - VHB.com

Final Report - VHB.com

Final Report - VHB.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Transportation Feasibility Study<br />

Redevelopment of the Naval Air Station Brunswick (NASB)<br />

Prepared for<br />

Prepared by<br />

Bedford, New Hampshire<br />

In partnership with<br />

Office of the Governor<br />

Maine Office of Redevelopment and Re-Employment<br />

Town of Brunswick<br />

Town of Topsham<br />

Midcoast Regional Redevelopment Authority<br />

In association with<br />

RKG Associates<br />

Gorrill-Palmer Consulting Engineers<br />

Morris Communications<br />

TechEdit Services<br />

December 2010


Transportation Feasibility Study<br />

Redevelopment of the<br />

Naval Air Station Brunswick (NASB)<br />

Prepared for<br />

The Maine Department of Transportation<br />

In partnership with<br />

Office of the Governor<br />

Maine Office of Redevelopment and Re-Employment<br />

Town of Brunswick<br />

Town of Topsham<br />

Midcoast Regional Redevelopment Authority<br />

Prepared by<br />

Vanasse Hangen Brustlin, Inc.<br />

Bedford, New Hampshire<br />

In association with<br />

RKG Associates<br />

Gorrill-Palmer Consulting Engineers<br />

Morris Communications<br />

TechEdit Services<br />

December 2010


Table of Contents<br />

Executive Summary ............................................................................................................... 1<br />

Introduction/Background ............................................................................................................ 1<br />

Study Needs .............................................................................................................................. 1<br />

Public Input ................................................................................................................................ 2<br />

Options ...................................................................................................................................... 3<br />

Transportation Demand Management ....................................................................... 3<br />

Roadway Options ....................................................................................................... 4<br />

Strategy 1 - Provide Direct Access to US Route 1 from the NASB ............ 4<br />

Strategy 2A - Improve Mobility along the Coastal Connector and<br />

Route 201 ................................................................................................... 5<br />

Strategy 2B - Improve Mobility along Pleasant Street ................................ 6<br />

Strategy 2C - Improve Mobility along Mill Street ........................................ 7<br />

Strategy 3 - Extend the Existing Rail Spur to the NASB ............................ 7<br />

Evaluation/Next Steps ............................................................................................................... 8<br />

1.0 Introduction ................................................................................................................... 11<br />

1.1 Project Background .......................................................................................................... 11<br />

1.2 Study Area, Defined Strategies, and Options ................................................................... 12<br />

1.3 Purpose and Need ............................................................................................................ 13<br />

1.4 Public Participation Process ............................................................................................. 14<br />

1.4.1 Public Informational Meetings ..................................................................... 15<br />

1.4.2 Public Workshops ....................................................................................... 15<br />

1.4.3 Study Advisory Committee ........................................................................... 16<br />

1.4.4 Project Website and Other Media ............................................................... 17<br />

2.0 Existing Conditions ....................................................................................................... 20<br />

2.1 Introduction ....................................................................................................................... 20<br />

2.2 Transportation ................................................................................................................... 20<br />

2.2.1 Existing Facilities ........................................................................................... 20<br />

2.2.2 Traffic Operations .......................................................................................... 27<br />

2.2.3 Crash Evaluation ............................................................................................ 35<br />

2.3 Environmental Resources ................................................................................................. 41<br />

2.3.1 Wetlands ........................................................................................................ 41<br />

2.3.2 Surface Waters .............................................................................................. 46<br />

2.3.3 Groundwater Resources ................................................................................ 48<br />

2.3.4 Floodplains ..................................................................................................... 48<br />

2.3.5 Farmland ........................................................................................................ 49<br />

2.3.6 Rare, Threatened, and Endangered Species ................................................ 50<br />

Table of Contents<br />

i


2.3.7 Wildlife Habitat ............................................................................................... 51<br />

2.3.8 Hazardous Materials ...................................................................................... 51<br />

2.4 Socioeconomic Resources ............................................................................................... 57<br />

2.4.1 Economy and Demographics ......................................................................... 61<br />

2.4.2 Cultural Resources ........................................................................................ 70<br />

2.4.3 Parklands and Recreation .............................................................................. 74<br />

3.0 Future Conditions ......................................................................................................... 74<br />

3.1 Introduction ....................................................................................................................... 74<br />

3.2 2035 DHV Forecasting ..................................................................................................... 74<br />

3.3 NASB and Topsham Annex Trip Estimates ...................................................................... 75<br />

3.3.1 NASB Reuse Future Traffic ........................................................................... 76<br />

3.3.2 Topsham Annex Reuse Trip Generation ....................................................... 81<br />

4.0 Summary of Options .................................................................................................... 82<br />

4.1 Introduction ....................................................................................................................... 82<br />

4.2 No Action Option ............................................................................................................... 83<br />

4.3 Transportation Demand Management .............................................................................. 83<br />

4.4 Bicyclist and Pedestrian Improvements ............................................................................ 84<br />

4.5 Passenger Rail and Bus Rapid Transit ............................................................................. 86<br />

4.6 Strategy 1 – Direct Access to US Route 1 ........................................................................ 86<br />

4.6.1 Option 1 ......................................................................................................... 87<br />

4.6.2 Option 2 ......................................................................................................... 88<br />

4.6.3 Option 3 ......................................................................................................... 89<br />

4.7 Strategy 2A – Improve Mobility along State Route 196 and US Route 201 ..................... 95<br />

4.7.1 Option 1 ......................................................................................................... 96<br />

4.7.2 Option 2 ......................................................................................................... 97<br />

4.7.3 Option 2A ....................................................................................................... 97<br />

4.7.4 Option 3 ......................................................................................................... 98<br />

4.7.5 Option 3A ..................................................................................................... 100<br />

4.7.6 Option 4 ....................................................................................................... 101<br />

4.7.7 Option 5 ....................................................................................................... 101<br />

4.8 Strategy 2B – Improve Mobility along Pleasant Street ................................................... 110<br />

4.8.1 Common Features ....................................................................................... 110<br />

4.8.2 Option 1 ....................................................................................................... 113<br />

4.8.3 Option 1A ..................................................................................................... 113<br />

4.8.4 Option 2 ....................................................................................................... 114<br />

4.8.5 Option 2A ..................................................................................................... 114<br />

4.8.6 Option 3 ....................................................................................................... 115<br />

4.9 Strategy 2C – Improve Mobility along Mill Street ............................................................ 123<br />

4.9.1 Option 1 ....................................................................................................... 123<br />

4.9.2 Option 2 ....................................................................................................... 124<br />

4.10 Strategy 3 – Rail Spur to the NASB .............................................................................. 127<br />

4.10.1 Options 1 and 1A ....................................................................................... 127<br />

4.10.2 Options 2 and 2A ....................................................................................... 128<br />

4.11 Other Roadway Modification Ideas ............................................................................... 133<br />

Table of Contents<br />

ii


4.11.1 Maine Street/US Route 1 Interchange ....................................................... 133<br />

4.11.2 New Interchange on I-295 at River Road ................................................... 133<br />

4.11.3 Depressed Mill Street ................................................................................. 134<br />

4.11.4 Convert Pleasant Street to Two-Way ......................................................... 134<br />

5.0 Evaluation of Options ................................................................................................ 137<br />

5.1 Evaluation Criteria .......................................................................................................... 137<br />

5.1.1 Addressing Purpose and Need .................................................................... 137<br />

5.1.2 Traffic Operations ........................................................................................ 138<br />

5.1.3 Transportation Demand Management ......................................................... 138<br />

5.1.4 Cost Estimates ............................................................................................. 139<br />

5.1.5 Environmental Evaluation – Resources and Methods ................................. 142<br />

5.2 Options Evaluation .......................................................................................................... 143<br />

5.2.1 No Action ..................................................................................................... 143<br />

5.2.2 Travel Demand Management ...................................................................... 144<br />

5.2.3 Build Options ................................................................................................ 147<br />

6.0 Conclusions .................................................................................................................. 161<br />

Appendix A.<br />

Resolutions Endorsing Certain Improvements<br />

Appendix B.<br />

Public Input<br />

Table of Contents<br />

iii


List of Tables<br />

Table No. Description Page No.<br />

1.4-1 Public Informational Meetings .................................................................................. 15<br />

1.4-2 Interactive Public Workshops .................................................................................. 16<br />

1.4-3 Study Advisory Committee Meetings ....................................................................... 16<br />

2.2-1 Existing Traffic-Volume Summary ............................................................................ 30<br />

2.2-2 Signalized Intersection Capacity Analysis Summary ............................................... 32<br />

2.2-3 Unsignalized Intersection Capacity Analysis Summary ........................................... 34<br />

2.2-4 2006–2008 Intersection Crash Data ........................................................................ 38<br />

2.2-5 2006–2008 Roadway Segment Crash Data ............................................................ 39<br />

2.4-1 Properties Listed in the National Register of Historic Places ................................... 64<br />

2.4-2 Previously Inventoried Historic Properties ............................................................... 65<br />

3.3-1 Trip-Generation Land-Use Summary ....................................................................... 77<br />

3.3-2 Trip-Generation Summary ....................................................................................... 77<br />

3.3-3 Trip-Distribution Summary ....................................................................................... 80<br />

5.1-1 Environmental Evaluation Metrics .......................................................................... 143<br />

5.1-2 Evaluation Matrix (Build Options Only) ................................................................. 146<br />

Table of Contents<br />

iv


List of Figures<br />

Figure No.<br />

Description<br />

1-1 Base Map<br />

2-1 Roadway Functional Classification<br />

2-2 Bicycle/Pedestrian Facilities<br />

2-3 2009 Design Hour Volumes<br />

2-4 Operationally Deficient Locations<br />

2-5 High Crash Locations<br />

2-6 Wetlands<br />

2-7 Groundwater Resources<br />

2-8 Floodplains<br />

2-9 Farmland Soils<br />

2-10 Rare, Threatened, and Endangered Species<br />

2-11 Wildlife Habitat<br />

2-12 Hazardous Materials<br />

2-13 Cultural Resources<br />

2-14 Parklands and Recreational Areas<br />

3-1 2035 Design Hour Volumes No Build<br />

3-2 2035 Design Hour Volumes with Direct Access to US Route 1<br />

4-1 Strategy 1, Option 1: Trumpet/Loop Interchange<br />

4-2 Strategy 1, Option 2: Flyover Interchange<br />

4-3 Strategy 1, Option 3: Frontage Road Interchange<br />

4-4 Strategy 2A, Option 1: I-295 Exit 31 Southbound On-Ramp Signal<br />

4-5 Strategy 2A, Option 2: Route 196/US Route 201 Roundabout with Widening of<br />

Coastal Connector<br />

4-6 Strategy 2A, Option 2A: Route 196/US Route 201 Roundabout<br />

4-7 Strategy 2A, Option 3: Route 196/US Route 201 Grade-Separation with Signals<br />

4-8 Strategy 2A, Option 3A:- Route 196/US Route 201 Grade Separation with<br />

Roundabouts<br />

4-9 Strategy 2A, Option 4: Coastal Connector Widened to Four Lanes<br />

4-10 Strategy 2A, Option 5: Topsham Annex Intersection<br />

Table of Contents<br />

v


Figure No. Description<br />

4-11 Strategy 2B, Option 1: Traffic-Calming Boulevard (2 Sheets)<br />

4-12 Strategy 2B, Option 1A/2A: Relocated River Road<br />

4-13 Strategy 2B, Option 2: Urban Boulevard (2 Sheets)<br />

4-14 Strategy 2B, Option 3: Five-Lane with TWLTL (2 Sheets)<br />

4-15 Strategy 2C, Option 1: Mill Street Three Lanes with Median<br />

4-16 Strategy 2C, Option 2: Mill Street Four Lanes with Median<br />

4-17 Strategy 3, Option 1: Western Connection Grade-Separated<br />

4-18 Strategy 3, Option 1A: Western Connection At-Grade<br />

4-19 Strategy 3, Option 2: Eastern Connection Grade-Separated<br />

4-20 Strategy 3, Option 2A: Eastern Connection At-Grade<br />

5-1 2035 Design Hour Volume Level of Service Summary<br />

Table of Contents<br />

vi


Executive Summary<br />

Introduction/Background<br />

This Transportation Feasibility Study for the Redevelopment of the Naval Air Station<br />

Brunswick (NASB) was prepared for the Maine Department of Transportation<br />

(MaineDOT) in partnership with the Office of the Governor, the Maine Office of<br />

Redevelopment and Re-Employment, the Towns of Brunswick and Topsham, and<br />

the Midcoast Regional Redevelopment Authority (MRRA). The purpose of this<br />

Feasibility Study is to determine the nature and extent of transportation<br />

enhancements aimed at improving mobility and access in support of the<br />

redevelopment of the NASB.<br />

The closure of the NASB - at one time Maine’s second largest employer - is expected<br />

to have a significant adverse impact on the economy of the Midcoast Region.<br />

However, the base closure also presents an opportunity for redevelopment that could<br />

substantially mitigate this economic loss if some of the issues identified in the 2007<br />

NASB Reuse Master Plan are addressed.<br />

A critical issue identified in the Reuse Master Plan is that access to the NASB must be<br />

improved for the redevelopment to reach full potential. Improving access to the<br />

NASB must consider a wide range of multimodal transportation factors, including<br />

the adequacy and safety of the existing roadway system, feasibility of additional<br />

public transportation options, freight and passenger rail access, and adequate<br />

ac<strong>com</strong>modations for pedestrians and bicyclists.<br />

Study Needs<br />

For this Feasibility Study, five specific needs or strategies were previously identified<br />

for evaluation. These needs were provided to the MaineDOT by the Governor’s<br />

Advisory Council and formulated through the previous NASB Reuse Master Plan<br />

study efforts conducted by the MRRA. The five needs are as follows:<br />

Provide direct access to US Route 1 from the NASB.<br />

Improve mobility along State Route 196 (Coastal Connector) from Interstate-295<br />

(I-295) (Exit 31) to US Route 1, including the State Route 196/US Route 201<br />

intersection and US Route 201 north to Old Augusta Road.<br />

Executive Summary 1


Improve mobility between I-295 (Exit 28) along Pleasant Street and Maine Street<br />

in Brunswick to State Route 123.<br />

Improve mobility along Mill Street in Brunswick from Pleasant Street to State<br />

Route 196.<br />

Extend the existing rail spur into the NASB.<br />

To be successful, the proposed transportation solutions also must dovetail with the<br />

near- and long-term goals of the <strong>com</strong>munities of Brunswick and Topsham, which<br />

include minimizing NASB-related trips through downtown Brunswick and<br />

residential districts and maintaining and enhancing livable <strong>com</strong>munities.<br />

Public Input<br />

To ensure that the Feasibility Study considered the needs and desires of both<br />

<strong>com</strong>munities, it was driven by an open and active public-participation process. The<br />

public was given several opportunities to share <strong>com</strong>ments and ideas at public<br />

informational meetings and informal workshops, as well as through a Study website,<br />

which provided a feature that allowed the public to ask questions and submit<br />

<strong>com</strong>ments online. Additionally, a Study Advisory Committee consisting of public<br />

officials, business leaders, and residents of Brunswick and Topsham met on a regular<br />

basis (approximately monthly) to review Study progress. The Committee provided<br />

invaluable insight about the needs and desires of the two <strong>com</strong>munities and also<br />

served as a sounding board in the development of alternative-transportation<br />

solutions.<br />

Throughout the Study, the public identified the need to address existing traffic<br />

congestion and safety deficiencies, and many people expressed a strong desire to<br />

look at multimodal transportation solutions rather than solely relying on new or<br />

wider roadways to ac<strong>com</strong>modate future growth. In particular, there was a strong<br />

desire to provide ac<strong>com</strong>modations for safe bicyclist and pedestrian mobility and to<br />

develop and encourage the use of public transportation.<br />

With regard to the roadway system, although there is recognition of the need to<br />

increase capacity on some roadways, the focus is on improving the safe and efficient<br />

movement of motor vehicles, pedestrians, and bicyclists through access management,<br />

introduction of traffic calming, preservation of the existing character of the<br />

downtown areas, and - most important - bringing the various elements together into<br />

a well-connected multimodal transportation system.<br />

Recognizing that the continued construction of new and wider roadways is neither<br />

desired nor without substantial cost, the <strong>com</strong>munities must <strong>com</strong>mit to the long-term<br />

implementation of Transportation Demand Management (TDM) actions. An<br />

aggressive TDM program can reduce, delay, and sometimes eliminate the need to<br />

increase roadway capacity. This <strong>com</strong>mitment to TDM needs to be real and long term,<br />

and it involves both the private and public sectors. Additionally, convincing<br />

<strong>com</strong>munities to establish or expand public-transportation systems, single-occupant<br />

Executive Summary 2


motorists to get out of their vehicle and use public transportation or carpools, and<br />

employers to implement flexible work hours requires a certain level of traffic<br />

congestion on the roadway system. The MaineDOT, the Towns of Brunswick and<br />

Topsham, and the users of the area’s transportation system must understand and<br />

accept this premise.<br />

Options<br />

After providing the five specific needs and engaging in an open public-participation<br />

process that enabled the Study Team to understand the needs and desires of the<br />

<strong>com</strong>munities of Brunswick and Topsham, the next step was to develop a series of<br />

options to be evaluated.<br />

The range of multimodal transportation options considered in this Feasibility Study<br />

includes highway, rail, bicycle, and pedestrian options in Brunswick and Topsham.<br />

In addition, the Study examines the potential effect of travel demand on Study Area<br />

roadways associated with the implementation of various levels of TDM measures.<br />

Given the expressed <strong>com</strong>mitment of the local <strong>com</strong>munities to a multimodal approach<br />

to addressing transportation needs in favor of solely relying on the continued<br />

construction of new and wider roadways, TDM actions are presented in this Study<br />

not as an either/or alternative but rather as actions that should be implemented as<br />

aggressively as possible – regardless of the implementation of other physical<br />

modifications to the roadway system.<br />

The No Action Option is essentially the continuation and perpetuation of the existing<br />

conditions and the short<strong>com</strong>ings inherent in the current Study Area roadways,<br />

interchanges, intersections, and transportation system. The No Action Option serves<br />

as a baseline condition for <strong>com</strong>parison to other options.<br />

Transportation Demand Management<br />

TDM en<strong>com</strong>passes a wide range of strategies that are designed to change personal<br />

travel behavior, resulting in the reduction of demand for automobile use and the<br />

need to construct additional roadway capacity. This is ac<strong>com</strong>plished through<br />

measures that (1) reduce the number or length of drive-alone trips, and (2) move<br />

trips out of peak times of roadway congestion. TDM measures provide incentives (or<br />

disincentives) to those who drive alone by encouraging them to change their travel<br />

behavior and use ride-share programs or other modes of travel.<br />

To be successful, TDM needs to be a collaborative partnership among the MaineDOT,<br />

the Towns of Brunswick and Topsham, and the local business <strong>com</strong>munity. The<br />

public sector can (1) provide supportive multimodal infrastructure such as bicycle<br />

lanes, sidewalks, pedestrian crosswalks and pedestrian-actuated traffic signals, bus<br />

Executive Summary 3


pullouts, and bus-stop shelters; (2) sponsor TDM programs such as GOMAINE,<br />

which provides carpool, vanpool, park ’n’ ride, and ridesharing services; and (3)<br />

continue to support local bus service and regional passenger rail. At the same time,<br />

the business <strong>com</strong>munity can promote tele<strong>com</strong>muting and implement<br />

staggered/flexible work hours and <strong>com</strong>pressed work weeks and support amenities<br />

such as bicycle storage and shower facilities.<br />

Roadway Options<br />

In response to the strong desire of the two <strong>com</strong>munities for multimodal<br />

transportation solutions, the various roadway options that were evaluated<br />

incorporated bicyclist and pedestrian ac<strong>com</strong>modations, introduced access<br />

management and traffic-calming elements, and - most important - were designed to<br />

provide only the minimal additional capacity needed to meet future projected travel<br />

demands. That is, the roadway options were designed to operate close to capacity<br />

during the future 2035 design hour in an effort to support the TDM actions. The<br />

roadway options that were developed and evaluated in each of the five previously<br />

described needs are discussed in the following sections.<br />

Strategy 1 - Provide Direct Access to US Route 1 from the<br />

NASB<br />

The successful redevelopment of the NASB property has the potential to<br />

substantially mitigate the expected economic loss to the region that will result from<br />

the closure of the NASB. Good access to US Route 1 will be needed if the<br />

redevelopment is to reach its full potential. For this reason, three direct-access-to-US<br />

Route 1 interchange options were considered. The options include a “trumpet”<br />

interchange, a “flyover” interchange, and a “split-diamond” interchange.<br />

The trumpet and flyover interchange options each provide a direct connection to US<br />

Route 1 with the construction of a connector roadway that passes beneath Bath Road<br />

and the Rockland Branch Railroad and then over US Route 1. The difference between<br />

the two options is that the trumpet option provides a loop-ramp configuration to<br />

ac<strong>com</strong>modate the US Route 1 southbound movements. The flyover interchange<br />

ac<strong>com</strong>modates the US Route 1 southbound movements with a multi-tier ramp<br />

system in which the southbound off-ramp passes over both US Route 1 and the<br />

southbound on-ramp. Both options enhance bicyclist and pedestrian mobility by<br />

providing a multiuse path that connects the NASB and the existing Androscoggin<br />

River Bicycle and Pedestrian Path.<br />

A third option, the split-diamond interchange, is configured such that the US Route 1<br />

northbound and southbound ramps are split and connect to the existing Cooks<br />

Corner cross roadway and a new NASB access roadway. The two cross roadways are<br />

linked by one-way frontage roadways that run parallel to US Route 1 and terminate<br />

opposite the new ramp intersections, creating two four-way signalized intersections<br />

Executive Summary 4


along each of the cross roadways. Unlike the alignment of the trumpet and flyover<br />

options, which are located west of Merrymeeting Plaza, the new connector roadway<br />

for the split-diamond option is located east of the shopping center. The connector<br />

roadway passes over US Route 1 but, unlike the other two options, the connector<br />

bridges over Bath Road and the rail line. Like the trumpet and the flyover<br />

interchanges, the split-diamond configuration enhances bicyclist and pedestrian<br />

mobility by providing a multiuse path that connects the NASB to the existing<br />

Androscoggin River Bicycle and Pedestrian Path.<br />

Strategy 2A - Improve Mobility along the Coastal Connector and Route 201<br />

The options to increase the throughput capacity of the Coastal Connector; address<br />

congestion problems at the State Route 196/US Route 201 intersection; and provide<br />

good pedestrian, bicyclist, and local vehicular connectivity ranged from:<br />

widening the Coastal Connector to four lanes<br />

installing a roundabout at the State Route 196/Route 201 intersection<br />

installing a traffic signal on State Route 196 at the Exit 31 southbound on-ramp<br />

and extending the left-turn storage length<br />

realigning Canam Drive and Old Augusta Road to form a single four-way<br />

signalized intersection on US Route 201 that serves as the primary access to the<br />

redeveloped Topsham Annex (the Topsham Annex intersection also provides<br />

access to properties with redevelopment potential located on the west side of<br />

State Route 201)<br />

In addition, to improve the efficient movement of vehicular traffic on the Coastal<br />

Connector while enhancing the local street function and “feel” of US Route 201, a<br />

grade-separated option was evaluated. This option consisted of grade-separating the<br />

Coastal Connector/Route 201 intersection with the Coastal Connector bridging over<br />

US Route 201. Whereas the Coastal Connector provides four lanes (i.e., two lanes in<br />

each direction) with a raised-center median, US Route 201 is limited to a single<br />

through lane in each direction as well as turn lanes with the potential for wider<br />

sidewalks, bicycle lanes, and landscaped medians, which present a more pedestrianfriendly<br />

character.<br />

Access through the local secondary connector roadways west of Route 201, such as<br />

Union Park and Monument Place, is maintained. However, the grade-separated<br />

option includes construction of additional connector roadways on the northeast and<br />

southeast quadrants of the intersection. The new connector roadways intersect the<br />

Coastal Connector east of Route 201 with traffic movements limited to right-turn<br />

in/right-turn out. The new roadway on the southeast quadrant intersects Route 201<br />

opposite Monument Place, whereas the new connector roadway on the northwest<br />

quadrant intersects Route 201 at a newly realigned Eagles Way. This grade-separated<br />

option provides two suboptions: single-lane roundabouts at the two newly formed<br />

Executive Summary 5


connector-roadway intersections with Route 201 or traffic-signal control at these<br />

intersections.<br />

Strategy 2B - Improve Mobility along Pleasant Street<br />

Based on public input, it is important to improve the safe and efficient movement of<br />

motor vehicles, pedestrians, and bicyclists and to address existing deficiencies while<br />

respecting the access needs of numerous businesses located along the Pleasant Street<br />

corridor. Additionally, there is a desire to decrease automobile dominance<br />

throughout the corridor. To ac<strong>com</strong>plish these goals, the options were developed with<br />

the application of access-management and traffic-calming techniques. The three basic<br />

options include a traffic-calming boulevard, an urban boulevard, and a five-lane<br />

cross section. All three options include secondary connector roadways (i.e., access<br />

management) that parallel Pleasant Street and provide connections between abutting<br />

roadside properties and the major intersections along the corridor, thereby allowing<br />

left-turn movements at these controlled locations. The locations of the secondary<br />

connector roadways are conceptual only, and it is envisioned that these connections<br />

would occur over time, if and when property owners consider redevelopment<br />

opportunities. The placement and implementation of these secondary connections<br />

will require the involvement and cooperation of the property owners.<br />

An important traffic-calming action is the proposed installation of a roundabout at<br />

the Exit 28 Connector/US Route 1 intersection. The primary purpose of this<br />

roundabout is to serve as a gateway that provides a transition from the high-speed I-<br />

295 Exit 28 to a more built-up, soon-to-be pedestrian-friendly Pleasant Street.<br />

The traffic-calming boulevard also includes two-lane roundabouts at the Church<br />

Road and River Road intersections with a raised-center median so that all driveways<br />

located away from these major intersections ac<strong>com</strong>modate right-turn-in/right-turnout<br />

movements. Left turns either use the parallel connectors or reverse direction at<br />

the roundabouts. This option does not provide for a roundabout at the Stanwood<br />

Street/Mill Street intersection because it was determined to have an unacceptable<br />

operation. The option at this location provides traffic-signal control at a realigned<br />

intersection where US Route 1 (i.e., Pleasant Street and Mill Street) is aligned as the<br />

through movement.<br />

The urban-boulevard option is similar to the traffic-calming option – the only<br />

difference being that the Church Road and River Road intersections would be trafficsignal<br />

controlled with exclusive left-turn lanes provided. The five-lane option is<br />

similar to the urban-boulevard option in that it provides the same traffic-signal<br />

control. The difference is that a two-way center left-turn lane is provided along the<br />

length of Pleasant Street as opposed to a raised-center median.<br />

An additional option considers relocating the River Road intersection to the west<br />

side of the Hyundai dealership to form a new four-way intersection with the fourth<br />

Executive Summary 6


leg of the intersection, which provides access to property on the south side of<br />

Pleasant Street that could present a redevelopment opportunity. This relocated<br />

intersection would be a roundabout or a signalized intersection.<br />

Strategy 2C - Improve Mobility along Mill Street<br />

Based on public input, there is little agreement about which actions should be taken<br />

to improve safety and mobility along Mill Street. Some people contend that as a<br />

principal arterial, Mill Street (i.e., US Route 1) should be widened to four lanes (i.e.,<br />

two lanes in each direction); others, stressing the proximity of the nearby residential<br />

neighborhood on the south side and the Androscoggin Brunswick-Topsham<br />

Riverwalk (with its recent restoration of the historic John A. Roebling Swinging<br />

Bridge) on the north side, believe that Mill Street should remain a two-lane roadway.<br />

In addition to the No Action Option, which maintains the existing two-lane cross<br />

section, three- and four-lane options were evaluated. The three-lane option consists<br />

of two northbound and one southbound travel lanes separated by a raised-center<br />

median. The basis for the three-lane section is that maintaining the single<br />

southbound lane (and the resulting delay) may encourage through traffic destined to<br />

I-295 to use the Coastal Connector. This perspective is consistent with the trafficcalming<br />

actions that are targeted for the Pleasant Street corridor. The four-lane<br />

option consists of two northbound and two southbound travel lanes separated by a<br />

raised-center median.<br />

To enhance pedestrian safety and provide the desired bicyclists and pedestrian<br />

connectivity, both the three- and four-lane options include sidewalks along Mill<br />

Street and construction of a pedestrian bridge in the vicinity of the existing railroad<br />

bridge. The pedestrian bridge essentially extends the Androscoggin Brunswick-<br />

Topsham Riverwalk to the residential neighborhood located on the opposite side of<br />

Mill Street.<br />

Strategy 3 - Extend the Existing Rail Spur to the NASB<br />

In keeping with the desire to consider opportunities for nonautomobile-oriented<br />

modes of access to the NASB, options were developed for extending the Rockland<br />

Branch Railroad spur - which currently runs along the north side of Bath Road - into<br />

the NASB. Two route options were developed for the spur, each of which provides<br />

rail access to the NASB near Hangar No. 6. The two route options consider crossing<br />

Bath Road either at grade or by way of grade separation where the rail spur crosses<br />

beneath Bath Road, resulting in four rail-spur options. The primary difference<br />

between the two route options is the origin of the spur on the Rockland Branch<br />

Railroad and the route to Hangar No. 6 on the NASB. The western alignment<br />

intersects Bath Road just east of Jordan Avenue; the eastern alignment intersects Bath<br />

Road just west of the Merrymeeting Plaza Shopping Center.<br />

Executive Summary 7


Evaluation/Next Steps<br />

Based on results of the evaluation and extensive public input, the following<br />

overarching plan elements were identified:<br />

Improve the safe and efficient movement of vehicular traffic through access<br />

management.<br />

Reduce the dominance of vehicular traffic by introducing traffic calming.<br />

Encourage multimodal mobility through enhanced pedestrian and bicyclist<br />

ac<strong>com</strong>modations and through the support of public transportation.<br />

Limit the need to continually increase roadway capacity by the implementation<br />

of aggressive TDM strategies and by the willingness to accept some level of<br />

traffic congestion on the roadway system.<br />

With regard to the interchange options that were evaluated to provide a direct<br />

connection between the NASB and US Route 1, the results - at a planning level -<br />

suggest that although each option does have impacts, the concept of constructing a<br />

new direct-connection interchange is feasible. However, the pursuit of this strategy<br />

would likely require the preparation of an Environmental Impact Statement or an<br />

Environmental Assessment as a provision of the National Environmental Policy Act<br />

(NEPA) of 1969. The NEPA study would examine the project options and impacts in<br />

greater detail and also entail additional in-depth public involvement. Given that this<br />

improved access is critical to the redevelopment of the NASB reaching its full<br />

potential, the general public support of this strategy voiced during the Feasibility<br />

Study, and the time needed to conduct such an in-depth study, the MaineDOT<br />

should consider pursuing this strategy as an early-action item. Project funding<br />

should be programmed prior to the initiation of the NEPA study.<br />

With regard to the strategies to improve mobility along the Coastal Connector,<br />

Pleasant Street, and Mill Street, consensus still must be reached on a fundamental<br />

question: whether the functional characteristics of these three principal arterials<br />

should be changed so as to encourage through traffic to use the Coastal Connector.<br />

This sentiment was voiced by many throughout the Feasibility Study’s publicparticipation<br />

process. If the decision is to encourage regional through traffic to use<br />

the Coastal Connector and as a result reclassify (i.e., downgrade) Pleasant Street and<br />

Mill Street, then options such as the widening of the Coastal Connector to a uniform<br />

four lanes and grade-separating the Route 196/Route 201 intersection should be<br />

pursued early, followed by the traffic-calming options considered for Pleasant Street.<br />

These options also may require NEPA action.<br />

.<br />

Because the secondary connector roadways, which <strong>com</strong>prise an important<br />

<strong>com</strong>ponent of the Pleasant Street access-management plan, are likely to be<br />

implemented over time as properties along the corridor redevelop, the full<br />

implementation of the Pleasant Street modifications may be phased and take many<br />

years. However, installation of the gateway roundabout at the Exit 28 Connector/US<br />

Executive Summary 8


Route 1 intersection could be considered. This action would serve to begin the<br />

transition of the Pleasant Street corridor from its current automobile-dominant<br />

character to a corridor that ac<strong>com</strong>modates multiple modes of travel, including the<br />

movement of pedestrians.<br />

Other physical roadway modifications that could be considered for early<br />

implementation include the following:<br />

installation of the traffic signal and the lengthening of the left-turn lane at the<br />

intersection of Route 196 and the I-295 Exit 31 southbound on-ramp<br />

construction of the pedestrian overpass of Mill Street<br />

depending on timing of the redevelopment of the Topsham Annex, realignment<br />

of Canam Drive and Old Augusta Road to form a single four-way signalized<br />

intersection on State Route 201<br />

Ultimately the decision as to which of the alternatives will be advanced for<br />

additional study or for implementation will involve further discussion between the<br />

MaineDOT and the Towns of Brunswick and Topsham.<br />

Executive Summary 9


Executive Summary 10


1<br />

Introduction<br />

1.1 Project Background<br />

The Maine Department of Transportation (MaineDOT), in partnership with the<br />

Office of the Governor, the Maine Office of Redevelopment and Re-Employment, the<br />

Towns of Brunswick and Topsham, and the Midcoast Regional Redevelopment<br />

Authority (MRRA), initiated this Transportation Feasibility Study to promote<br />

development of immediate and long-range transportation improvement strategies<br />

that support the phased redevelopment of the Naval Air Station Brunswick (NASB).<br />

The 2005 Base Realignment and Closure Commission decided to close the Naval Air<br />

Station Brunswick, Maine, including the Topsham Annex (NASB), 1 and to relocate its<br />

aircraft with dedicated personnel, equipment, and support to Naval Air Station<br />

Jacksonville (Florida). As Maine's second largest employer, the NASB once employed<br />

more than 4,800 military and civilian personnel. In 2007, it provided more than $187<br />

million to the local economy, including $115 million in salaries, $38 million in<br />

contracts and material purchases, and $34 million in medical purchases. 2 The loss of<br />

this economic driver could have a substantial impact on the economy of the Midcoast<br />

Region.<br />

However, redevelopment of the Air Station and Annex represents an opportunity for<br />

economic growth if several issues identified in the December 2007 NASB Reuse Master<br />

Plan are properly addressed. The Reuse Master Plan envisions the development of<br />

1,690 acres of the Air Station and Annex, or roughly half of their <strong>com</strong>bined area (i.e.,<br />

3,274 acres); the other half would be reserved for open space. The developed area<br />

would en<strong>com</strong>pass a mix of land uses, including a civilian airport, professional office<br />

space, residential space, <strong>com</strong>mercial and retail space, recreational and park, and<br />

educational uses. The Reuse Master Plan predicts that the redevelopment has the<br />

<br />

1 For the purposes of this document and unless stated otherwise, all references to NASB include both the Cooks<br />

Corner and Topsham Annex facilities.<br />

2 Brunswick Naval Air Station Reuse Master Plan, December 2007, prepared for the Brunswick Local Redevelopment<br />

Authority by Matrix Design Group.<br />

Introduction 11


potential to eventually replace the lost jobs and economic activity associated with the<br />

NASB.<br />

A critical issue identified in the Reuse Master Plan is that access to the NASB must be<br />

improved for the redevelopment to reach its full potential. A strategy to improve<br />

access should consider a wide range of transportation factors, including the<br />

adequacy and safety of the existing roadway network, feasibility of additional public<br />

transportation options, freight and passenger rail access, and adequate<br />

ac<strong>com</strong>modations for pedestrians and bicyclists.<br />

It is estimated that ultimately under a maximum build-out scenario, the traffic<br />

generated by the redeveloped NASB facility could increase to at least twice the<br />

preclosure levels. This scenario has the potential to exacerbate congestion delays and<br />

safety issues along the roadways (e.g., Pleasant Street) and at intersections (e.g.,<br />

Cooks Corner) that are currently experiencing lower levels of service (LOSs).<br />

Although some of the impacts may be mitigated through the creation of additional<br />

points of access to the adjacent street system at the NASB, the 2007 Reuse Master Plan<br />

identified certain off-site improvements as necessary to ac<strong>com</strong>modate the increased<br />

traffic volumes.<br />

This Transportation Feasibility Study is based on recent and concurrent planning<br />

efforts associated with the NASB and the Midcoast Region, including the Brunswick<br />

Naval Air Station and Topsham Annex Reuse Master Plans, December 2007; the US Route<br />

1 Corridor Study, Brunswick, 2007; the Gateway 1 Corridor Action Plan, June 2009; and<br />

the ongoing US Navy Base Closure Environmental Impact Statement. These studies<br />

clearly indicate that current access to the redeveloped NASB is inadequate and<br />

would seriously constrain the successful implementation of the Reuse Master Plan and<br />

the economic vitality that is so important to the Midcoast Region.<br />

This Feasibility Study considers and <strong>com</strong>pares, at the macro level, the transportation<br />

efficiency, cost, right-of-way (ROW), constructability, environmental, and<br />

<strong>com</strong>munity impacts of specific strategies and options, which range from relatively<br />

low cost easy to implement improvements to major reconstruction or expansion of<br />

the existing infrastructure. The Study considers multimodal options including the<br />

existing and future movement of people and goods by rail, transit, truck, and<br />

automobile, as well as the needs of pedestrians and bicyclists.<br />

1.2 Study Area, Defined Strategies, and<br />

Options<br />

The Study Area for this Feasibility Study is generally bounded by Interstate 295 (I-<br />

295) to the west between Exits 28 and 31, by State Route 196 to the north, and by US<br />

Route 1 and Bath Road to the east and south. However, as discussed herein, specific<br />

areas within this more general area were defined further in order to focus the Study.<br />

Introduction 12


Throughout this Feasibility Study, the terms strategy and option are used to describe<br />

different alternatives for achieving the improved access to the redeveloped NASB.<br />

The term strategy refers to larger transportation and land-use needs used<br />

individually or in <strong>com</strong>bination to achieve better access to the NASB. Different ways<br />

of achieving those strategies are considered options. Potential options for a defined<br />

strategy may include actions such as the widening of an existing roadway, addition<br />

of turn lanes, improved traffic-signal timing, and implementation of Transportation<br />

Demand Management (TDM) actions.<br />

For this Study, five specific strategies were identified for evaluation. These five<br />

strategies were provided to the MaineDOT by the Governor’s Advisory Council and<br />

formulated through the previous NASB Reuse Master Plan study efforts conducted by<br />

the MRRA. Focusing the evaluation effort on these five strategies ensures that the<br />

evaluation is conducted at a sufficient level of detail in order for decision makers to<br />

advance some of the preferred options to the permitting, design, and implementation<br />

phases. The five strategies or needs are as follows:<br />

Provide direct access to US Route 1 from the NASB.<br />

Improve mobility along State Route 196 (Coastal Connector) from I-295 (Exit 31)<br />

to US Route 1, including the State Route 196/US Route 201 intersection and US<br />

Route 201 north to Old Augusta Road.<br />

Improve mobility between I-295 (Exit 28) along Pleasant Street and Maine Street<br />

in Brunswick to State Route 123.<br />

Improve mobility along Mill Street from Pleasant Street in Brunswick to State<br />

Route 196.<br />

Extend the existing rail spur to the NASB.<br />

Whereas many transportation studies speak in terms of a single “Preferred Option,”<br />

this Feasibility Study seeks to identify a Preferred Option - perhaps more than one -<br />

for each strategy. It is important to understand that one strategy may be forwarded<br />

to construction independently of the others. The Preferred Options are prioritized for<br />

advancement based on the need to ac<strong>com</strong>modate base redevelopment.<br />

Each of the five strategies has a defined Study Area, which are shown in Figure 1-1.<br />

1.3 Purpose and Need<br />

The intent of the purpose and need outlined in this section is to describe and support<br />

the Feasibility Study. The purpose and need of a project establish a basis for the<br />

development of a range of reasonable options and assist with the identification,<br />

analysis, and eventual selection of a Preferred Option(s). The Purpose and Need<br />

Statement is used for <strong>com</strong>paring the effectiveness and impacts of the various Study<br />

options to the No Action Option.<br />

Introduction 13


The Purpose and Need Statement is fundamental to the analysis of a Feasibility<br />

Study under the National Environmental Policy Act (NEPA), the Clean Water Act<br />

(Section 404), and other environmental regulations.<br />

Project Purpose and Need<br />

The purpose of this Feasibility Study is to guide future infrastructure investments to<br />

enhance mobility and access for redevelopment of the NASB, including the Topsham<br />

Annex, by:<br />

identifying measures to improve safety at problem locations in the Study Area<br />

ac<strong>com</strong>modating future traffic demands related to <strong>com</strong>muter trips and the<br />

shipment of goods and services to and from the redeveloped NASB<br />

considering multimodal options (e.g., public transit and vehicular, rail, bicycle,<br />

and pedestrian modes) that improve access efficiency at the redeveloped NASB<br />

from I-295, US Route 1, and State Route 196<br />

evaluating the engineering and environmental feasibility of creating a rail<br />

connection to the NASB<br />

As described in the previous section, five needs were identified for evaluation. In<br />

meeting these needs, the proposed transportation solutions must dovetail with the<br />

goals of the <strong>com</strong>munities of Topsham and Brunswick, which include minimizing<br />

NASB-related trips through downtown Brunswick and residential districts and<br />

maintaining and enhancing livable <strong>com</strong>munities.<br />

Options to be considered include the No Action Option; TDM strategies to reduce<br />

vehicle trips (e.g., ride sharing/carpooling and public transit); enhanced rail service;<br />

and adding capacity to existing roadways by widening and improving intersections<br />

and interchanges.<br />

1.4 Public Participation Process<br />

An open and consensus-driven public participation process that engages all<br />

stakeholders is key to the development and refinement of thoughtful transportation<br />

solutions. Good planning practice involves a mutual learning process among<br />

practitioners, elected officials, residents, business groups, citizen groups, and other<br />

affected parties. The thoughts, concerns, and ideas of the general public on Study<br />

Area transportation needs, problems, and solutions are critical to crafting and<br />

refining solutions that are practical, permittable, affordable, and context-sensitive in<br />

meeting the transportation needs.<br />

Various methods were provided to simplify the process as much as possible for the<br />

public to learn about and provide input on the Feasibility Study.<br />

Introduction 14


1.4.1 Public Informational Meetings<br />

Public informational meetings were held at three key points during the Feasibility<br />

Study so that the MaineDOT and the Study Team could provide important<br />

information to the public and solicit its input. Attendee sign-in sheets and <strong>com</strong>ment<br />

forms were provided at all public meetings. Meeting reports, as well as presentations<br />

and handouts, were posted on the website following each meeting so that those not<br />

in attendance could follow the progress of the Study. The topics and timing for the<br />

public informational meetings are listed in Table 1.4-1. All meetings were held at the<br />

Brunswick Junior High School except the final meeting on August 12, 2010, which<br />

was held at the Mount Ararat Middle School in Topsham.<br />

Table 1.4-1. Public Informational Meetings<br />

Meeting Date Topics<br />

1 August 6, 2009 Review of the Feasibility Study objectives; definition of the five strategies; Study schedule;<br />

environmental process; and public involvement plan<br />

2 March 30, 2010 Review of Feasibility Study purpose and need; remainder of the Study schedule; future<br />

conditions; summary of public input received at workshops conducted in September 2009 and<br />

January 2010; and description of options to be evaluated<br />

3 June 2, 2010 Review of Feasibility Study purpose and need; discussion of public feedback including bicycle<br />

and pedestrian access; public transportation opportunities; functional characteristics of<br />

roadways; and detailed plans of options for each of the five strategies<br />

4 August 12, 2010 Presentation and discussion of study findings<br />

1.4.2 Public Workshops<br />

Two interactive public workshops were conducted at key points in the Feasibility<br />

Study (Table 1.4-2). These meetings differed from the public informational meetings<br />

in that there were no formal presentations by the MaineDOT, the Study Team, or<br />

other stakeholders. Rather, these meetings focused on review of the Study base maps<br />

and conceptual designs. The public was invited to view these plans with the staff<br />

responsible for developing them. Various stations were set up in the meeting room,<br />

with each station focused on one of the five strategies or issues (e.g., Strategy 1,<br />

environmental resources, socioeconomic issues, and multimodal connections). In this<br />

way, the public was able to interact one-on-one with the technical experts working<br />

on the project to ensure that public feedback was clearly understood.<br />

Introduction 15


Table 1.4-2. Interactive Public Workshops<br />

Meeting Date Topics<br />

1 September 2, 2009 Review of Feasibility Study base plan, including environmental constraints and roadway<br />

layouts; electronic polling of attendees regarding several areas of interest; feedback sought on<br />

options within each strategy (except Strategy 1); environmental-resource maps presented<br />

2 January 13, 2010 Review of Feasibility Study schedule; natural- and cultural-resource mapping; traffic volumes,<br />

high crash locations (HCLs), and operationally deficient locations; review of Strategy 1 with<br />

information station; review of expanded Strategy 2A<br />

1.4.3 Study Advisory Committee<br />

A Study Advisory Committee <strong>com</strong>posed of public officials, business leaders, and<br />

residents of Brunswick and Topsham met on a regular basis (approximately<br />

monthly) to review Feasibility Study progress. The Committee provided invaluable<br />

insight to the needs and desires of the <strong>com</strong>munities and also served as a “sounding<br />

board” in the development of the transportation solutions. The Study Advisory<br />

Committee members are as follows:<br />

Anna Breinich Lee Karker Benet Pols Rich Roedner<br />

Dave Markovchick Ted Crooker James Howard Victor Langelo<br />

Leighton Cooney Jeff Jordon John Gerard Louise Rosen<br />

Bill Torrey Tony Armstrong John Shattuck Denise Clavette<br />

Ten Study Advisory Committee meetings were held, as summarized in Table 1.4-3.<br />

Table 1.4-3. Study Advisory Committee Meetings<br />

Meeting Date Topics<br />

1 July 29, 2009 Study area and study purpose, study schedule, and study process.<br />

2 September 15, 2009 Purpose and need; review public input from September 2, 2009, workshop; discussion on expanding<br />

study area along Route 201 to Old Augusta Road in Topsham<br />

3 November 18, 2009 Confirmation of expanded study area; clarification of the five defined strategies to be studied;<br />

discussion of the NASB reuse build-out projections; discussion of possible additional study efforts,<br />

including rail intermodal study and Route 196 west of I-295 traffic study<br />

4 January 6, 2010 Discussion on the NASB reuse build-out projections and need to retain independent review of<br />

economic projections, discussion of draft Purpose and Need Statement<br />

5 February 17, 2010 Presentation of findings of independent review of the NASB build-out projections, discussion of<br />

modifications to draft Purpose and Need Statement, review of public input from January 13, 2010,<br />

workshop<br />

Introduction 16


Table 1.4-3. Study Advisory Committee Meetings (continued)<br />

6 March 17, 2010 Presentation of results of the future-year traffic projections and operational analyses; discussion of<br />

the preliminary screening of options to be evaluated under each strategy<br />

7 April 19, 2010 Presentation and discussion of the ongoing options evaluation<br />

8 May 19, 2010 Presentation and discussion of the option conceptual plans to be presented at the June 2, 2010,<br />

public meeting<br />

9 June 9, 2010 Review of public input received from June 2, 2010, public meeting, discussion of TDM actions, and<br />

review of updated evaluation matrix<br />

10 July 1, 2010 Review of additional public input received via the study website, discussion of potential project<br />

phasing and priorities, discussion of schedule to <strong>com</strong>plete the study<br />

11 August 19, 2010 Review of public input received from August 12, 2010 public meeting, discussion of project priorities,<br />

and distribution of draft report to Committee members<br />

1.4.4 Project Website and Other Media<br />

Website<br />

To broadcast information about the project, a project-specific Internet website was<br />

created. At www.nasb-transportation-study.<strong>com</strong>, the public can view the documents<br />

involved in the Feasibility Study, find out when meetings are scheduled, review<br />

meeting reports, and read regular updates on the progress of the Study. The website<br />

also contains a feature that allows the public to ask questions or submit <strong>com</strong>ments<br />

online.<br />

Email Updates<br />

Members of the public who want to hear Feasibility Study news regularly can elect to<br />

be on the email list for automatic updates. An email listing of Study Advisory<br />

Committee members and other interested citizens was provided for updates of all<br />

public meetings and workshops, with a request to forward the meeting notice to<br />

other interested individuals.<br />

Media<br />

The news media received regular press releases on meeting dates and on the<br />

progress of the Feasibility Study. A concerted effort was made to generate coverage<br />

at public meetings and workshops. Several news articles about the Study and<br />

meeting notices were published in the Times Record (Brunswick) and The Forecaster<br />

(Falmouth). An eight-page newspaper insert, which described the options being<br />

considered, was published in the July 30, 2010, Times Record. The June 2, 2010, public<br />

Introduction 17


informational meeting was covered by television station WCSH (Portland), which<br />

aired a report during its evening newscast.<br />

Introduction 18


F<br />

CATHANCE RIVER<br />

MEADOW RD<br />

W HITEHOUSE CROOSING RD<br />

JESSE RD<br />

AUGUSTA RD<br />

CATHANCE RD<br />

MUDDY RIVER<br />

§¨¦295<br />

Exit 28<br />

DURHAM RD<br />

HILLSIDE DR<br />

PLEASANT HILL RD<br />

CASCO RD<br />

RI VER RD<br />

EXIT-28<br />

CONNECTOR<br />

RIVER RD<br />

OLD PORTLAND RD<br />

GREENWOOD RD<br />

RAYMON D R D<br />

BIBBER P K W Y<br />

RIVER RD<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

§¨¦295<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI C<br />

IA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

ROCKY AV<br />

PLEASANT HILL R D<br />

LEW ISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCH ARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

W INTE R ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

STANWOOD ST<br />

MILL ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FOR E S T DR<br />

PATRICIA DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

MAQUOIT RD<br />

§¨¦295<br />

A ST<br />

BODWELL ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

PRO SPECT ST<br />

WOOD AV<br />

BICKFORD DR<br />

CAROLYN ST<br />

WALNUT ST<br />

BARBARA ST<br />

HIGH ST<br />

BARROW S DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

MILL RD<br />

BELMONT ST<br />

THOMPSON ST<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

LINCOLN ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

BANK ST<br />

NOBLE ST<br />

MAINE ST<br />

POTTER ST<br />

MAIN ST<br />

MAINE ST<br />

CENTER<br />

ST<br />

WH ITTIER ST<br />

BOWD OIN ST<br />

HEMLOCK RD<br />

PLEASANT ST<br />

GREEN ST<br />

PERKI N S ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

CO LLEG E ST<br />

SOUTH ST<br />

LON GFELLOW AVE<br />

LAUR E L R D<br />

JUNIPER R D<br />

MELDEN DR<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

JORDAN AV<br />

BEEC H DR<br />

ELM ST<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

BAXTER LN<br />

AU DO B O N WAY<br />

£¤ 1 ") 196<br />

OLD AUGUSTA RD<br />

£¤ 1 £¤ 1<br />

Strategy 1<br />

LOWER ROAD RAILLINE<br />

£¤ 1 BOWDOIN<br />

COLLEGE<br />

") 196<br />

MOUNTA<br />

IN RD<br />

D AVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

HARPSWELL RD<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

KING RD<br />

TOPSHAM CRSG<br />

O LD<br />

PI N E W O O D D R<br />

LORI<br />

DR<br />

TEDFORD DR<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

BATH RD<br />

ORIO N ST<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

MIDDLESEX RD<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MU RDER R D<br />

BATH RD<br />

PURINTON RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PER RYMAN DR<br />

GUADALCANAL ST<br />

THOMA S POINT R D<br />

INDEPENDENCE DR<br />

COOM BS RD<br />

WILD WOOD DR<br />

GROVER LN<br />

BATH RD<br />

MERRICONEAG RD<br />

ORDINANCE RD NO. 5<br />

COOMBS RD<br />

") 196 £¤ 201 £¤ 201 ") 123<br />

SIMPSON<br />

MOODY RD<br />

RIVER RD<br />

BROOK<br />

BUNGANUC<br />

TOWN OF TOPSHAM, SAGADAHOC CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

AND RO S C O G G<br />

IN R<br />

IVER<br />

IVAN H OE DR<br />

BLUEBERRY LN<br />

Strategy 2B<br />

MAINE VOCATIONAL<br />

REG ION 10<br />

BRUNSWICK<br />

HIGH SCHOOL<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

MERE POINT RD<br />

ELEM SCHOOL<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

HOSPITAL<br />

MT ARARAT<br />

HIGH SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

Strategy 2A<br />

Strategy 2C<br />

BLUEBERRY LN<br />

GR OVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

COW ISLAND<br />

Strategy 3<br />

BAY PARK DR<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

OLD TAVERN R D<br />

DRISCOLL<br />

ISLAND<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

") 123 ") 24 ") 24<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Major Roads<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Existing Conservation Land<br />

Town Boundary<br />

l<br />

0 3,000 6,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 1-1<br />

STREAM<br />

MIDDLE BAY RD<br />

MARE BROOK<br />

Base Map<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

ROSSMORE RD<br />

HIGHLAND RD<br />

WOODSIDE RD<br />

MARE BROOK<br />

PINEFIELDS LN<br />

BUNGANUC<br />

PENNEYVILLE R D<br />

GURNET RD<br />

STREAM<br />

B UNGANUC RD<br />

ERE POINT RD


2<br />

Existing Conditions<br />

2.1 Introduction<br />

This chapter describes the existing or baseline conditions in the Study Area. Current<br />

transportation infrastructure and traffic-operating conditions, as well as<br />

environmental and socioeconomic resources, are described. Information on the<br />

natural and cultural resources contained in the transportation strategies were<br />

obtained from file reviews, agency consultations, geographic information system<br />

(GIS) database retrieval, and a windshield-level field-reconnaissance effort. It is this<br />

affected environment that the impacts of the various Feasibility Study options are<br />

evaluated against in Chapter 5.<br />

2.2 Transportation<br />

This section summarizes the existing transportation infrastructure and trafficoperating<br />

conditions in the Study Area, which is generally bound by I-295 on the<br />

west between Exits 28 and 31, by State Route 196 to the north, and by US Route 1 and<br />

Bath Road to the east and south. Figure 2-1 shows the primary Feasibility Study<br />

roadways and associated functional classification. Subsection 2.2.1 describes the<br />

existing transportation facilities including roadways, public transportation, rail, and<br />

bicyclist and pedestrian facilities. Subsection 2.2.2 summarizes existing 2009 traffic<br />

volumes, the development of appropriate existing design hour volumes (DHVs), and<br />

results of the existing traffic-operations evaluation. Subsection 2.2.3 summarizes the<br />

existing roadway and intersection deficiencies identified through crash research and<br />

crash analysis, physical inventories of the geometric conditions, and operational and<br />

capacity analyses.<br />

2.2.1 Existing Facilities<br />

Roadways<br />

State Route 196 is the major transportation link between the Lewiston–Auburn area<br />

and Midcoast Maine. The segment of State Route 196 in the Study Area is classified<br />

Existing Conditions 20


as a principal arterial and extends from the I-295 interchange at Exit 31<br />

approximately 2.5 miles east and south to its interchange with US Route 1. The<br />

segment of State Route 196 east of US Route 201 (known as the Coastal Connector) is<br />

primarily a two-lane undivided roadway with additional turn lanes provided at<br />

major intersections. State Route 196 serves as a gateway to Topsham’s <strong>com</strong>mercial<br />

and industrial businesses located on or adjacent to State Route 196 between I-295 and<br />

US Route 201. This portion of State Route 196 has experienced increased<br />

development and associated growth in traffic volumes, resulting in a deteriorating<br />

quality of travel since the Coastal Connector opened in November 1997. Five<br />

signalized intersections providing access to businesses and local roadways are<br />

closely situated (i.e., within 0.6 mile) between the I-295 interchange and US Route<br />

201.<br />

US Route 1 in Brunswick between the Exit 28 connector and Mill Street is known as<br />

Pleasant Street and it provides two travel lanes in each direction. Extending northerly<br />

from the Pleasant Street/Stanwood Street intersection, US Route 1 transitions from<br />

the four-lane urban principal arterial along Pleasant Street to a two-lane principal<br />

arterial known as Mill Street. Mill Street extends northerly through a gradeseparated<br />

intersection with US Route 201 (Maine Street) before transitioning to a<br />

four-lane divided highway. Access to Maine Street from Mill Street is limited; left<br />

turns from Mill Street/US Route 1 northbound and southbound to Maine Street<br />

westbound and eastbound, respectively, are prohibited, creating driver confusion,<br />

delays, and undesirable reverse-direction maneuvers.<br />

State Route 24 serves primarily as a minor arterial roadway between State Route 196<br />

and Cooks Corner and also provides connectivity to I-295, State Route 196, and US<br />

Route 1 for Brunswick and Topsham. State Route 24 also serves a number of<br />

destinations including Bowdoin College, the NASB (primary access), and a number<br />

of <strong>com</strong>mercial/retail developments. The Maine Street segment of State Route 24<br />

between State Route 123 and US Route 1/Mill Street in the downtown Brunswick<br />

area varies from a two-lane roadway (one lane in each direction) to a four-lane<br />

roadway (two lanes in each direction) and is often congested during peak travel<br />

periods. The Bath Road segment of State Route 24 extends from Maine Street easterly<br />

to Cooks Corner as a two-lane minor arterial. At the Cooks Corner intersection, State<br />

Route 24 be<strong>com</strong>es Gurnet Road and turns sharply to the south to Harpswell; Bath<br />

Road continues easterly toward Bath as a major collector roadway.<br />

Public Transportation<br />

Public transit is currently provided in the Study Area by Coastal Trans, Inc. (CTI);<br />

Concord Coach Lines; Greyhound Bus Lines; and Maine Eastern Railroad. The<br />

following discussion describes each of the services currently provided.<br />

CTI is a nonprofit subsidiary of Methodist Conference Home, Inc., and is a State of<br />

Maine designated Regional Transportation Provider. CTI operates a fleet of<br />

Americans with Disabilities Act accessible buses, sedans, and vans that provides<br />

nonemergency medical transportation for residents of Knox, Lincoln, and Sagadahoc<br />

Existing Conditions 21


Counties and the Towns of Brunswick and Harpswell. CTI operates demandresponsive<br />

services, as well as a Midcoast Shuttle that provides roundtrip morning<br />

and afternoon services from Brunswick to Edge<strong>com</strong>b.<br />

Until September 2010, CTI did not have a fixed-route service. The Brunswick<br />

Explorer program provides bus service throughout Brunswick with buses running<br />

on an hourly Monday through Friday schedule from 7:30 AM to 5:30 PM. Fares for<br />

the Brunswick Explorer are set at $1 for a one-way trip, $2 for a day pass (unlimited<br />

rides), $10 for a 12-ride ticket, and $25 for a monthly pass. Scheduled route stops<br />

include Thornton Oaks Retirement Community, Parkview Adventist Medical Center,<br />

Bowdoin College, Maine Street Station, Hannaford Supermarket, Gilman Avenue,<br />

Woodlawn Tower, Pejescot Terrace, Merrymeeting Plaza, Wal-Mart, Mid Coast<br />

Hospital, and Sweetser.<br />

Concord Coach Lines currently provides service to and from Brunswick and points<br />

south including Portland, Maine, and South Station and Logan Airport in Boston,<br />

Massachusetts. Stops in Brunswick include the Mobil Mart/Puffin Stop (101 Bath<br />

Road) and Bowdoin College (Druckenmiller Hall on Stills Drive). Daily southbound<br />

routes depart the Brunswick area at approximately 10:20 AM and 2:20 PM, arriving<br />

at the Boston destinations at approximately 1:25 PM and 5:25 PM, respectively.<br />

Additional southbound routes include a Friday run that leaves Brunswick at<br />

approximately 1:35 PM and arrives in Boston at approximately 4:30 PM and a<br />

Sunday run that departs at approximately 5:05 PM and arrives in Boston at<br />

approximately 8:00 PM. Northbound daily routes depart the Boston stops at<br />

approximately 11:20 AM and 4:25 PM, arriving in the Brunswick area at<br />

approximately 2:40 PM and 7:50 PM, respectively.<br />

Greyhound Bus Lines provides transportation throughout the United States, as well<br />

as parts of Canada and Mexico. Greyhound operates a stop in Brunswick at the new<br />

Maine Street Station.<br />

Maine Eastern Railroad currently provides seasonal scenic passenger excursions<br />

between Brunswick and Rockland with stops in Bath and Wiscasset. Additionally,<br />

the MaineDOT and the Northern New England Passenger Rail Authority (NNEPRA)<br />

are currently upgrading the rail line from Portland to Brunswick, which will provide<br />

for the extension of the Amtrak Downeaster passenger rail services to Brunswick.<br />

Railroad facilities are discussed in more detail in the next subsection.<br />

In addition to these public-transportation services, Bowdoin College provides several<br />

transportation options for their students and employees, including the following:<br />

ZipCars. This program offers the use of two energy-efficient vehicles to students,<br />

faculty, staff, and members of the <strong>com</strong>munity who be<strong>com</strong>e ZipCar members.<br />

Membership requires an acceptable driving record, an application fee of $25<br />

(which is waived for Bowdoin students and employees), and an annual<br />

Existing Conditions 22


membership fee of $35. ZipCar members can reserve a vehicle for a fee of $7 per<br />

hour or $60 per day with gasoline, maintenance, and insurance included.<br />

The Bowdoin Shuttle. This shuttle service provides transportation to students<br />

when classes are in session. The shuttle operates within an approximate 1-mile<br />

radius of the campus center including downtown Brunswick, the Concord Coach<br />

Lines bus stop on Bath Road, and many off-campus apartments. The Bowdoin<br />

Shuttle also offers services on Friday and Saturday during the academic year for<br />

trips to Freeport and Portland at a cost of $3.<br />

Purpool. This pilot carpooling-network program is available only to Bowdoin<br />

students, faculty, and staff. The program provides carpool-matching services and<br />

assists with scheduling and <strong>com</strong>munication within the carpool. The program also<br />

calculates and tracks the amount of gasoline saved and miles not driven as a<br />

result of the carpool.<br />

Bowdoin Yellow Bike Club. This club grants its members access to any of the<br />

Yellow Bikes provided throughout the campus for nonmotorized transportation.<br />

Railroad Facilities<br />

In recent years, the State of Maine has made investment in passenger and freight rail<br />

a priority. To this end, the MaineDOT has made substantial investments along the<br />

existing rail corridors in the area.<br />

.<br />

The Amtrak Downeaster corridor is a 114-mile rail corridor between Boston,<br />

Massachusetts, and Portland, Maine. In 2000, the portion of the line from Portland to<br />

Boston was rehabilitated to Federal Railroad Administration (FRA) Class 3 and 4<br />

standards to support passenger service. In 2010, the MaineDOT and the NNEPRA<br />

received funding to extend passenger rail service north of Portland to Brunswick as a<br />

continuation of the passenger rail service between Boston and Portland. The<br />

extension includes track work, drainage engineering, surveying, and station design.<br />

This $35 million project will rehabilitate 30 miles of existing rail to FRA Class 3<br />

standards to extend the Amtrak Downeaster passenger rail service from Portland<br />

north to Brunswick, with a station in Freeport.<br />

Additionally, the State of Maine is investing in the upgrade of the 56-mile Rockland<br />

Branch Railroad, which runs along Maine’s scenic coast, linking Brunswick and<br />

Rockland. Freight service is provided along the Rockland Branch Railroad by the<br />

Maine Eastern Railroad. The proposed upgrades are expected to improve freight-rail<br />

operations as well as provide opportunities for the expansion of passenger rail<br />

service beyond the current seasonal tourist service.<br />

Bicyclist and Pedestrian Facilities<br />

The Towns of Brunswick and Topsham currently have off-road bicyclist and<br />

pedestrian paths and trails. Both towns also have plans to continue to expand the<br />

Existing Conditions 23


OUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

LEWISTON LOWER BRANCH RAILINE<br />

RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

DAHOC CO<br />

ERLAND CO<br />

8<br />

OR<br />

RIVER RD<br />

RTLAND RD<br />

NWOOD RD<br />

AND RO S C O G G<br />

BIBBER P K W Y<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

IVER<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RICIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

") £¤ 196 201 MT ARARAT<br />

MIDDLE SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

§¨¦295<br />

MT ARARAT<br />

HIGH SCHOOL<br />

Exit 31<br />

") 196<br />

KING RD<br />

£¤ 201 HILLCREST<br />

LN<br />

DRISCOLL<br />

ISLAND<br />

BOWDOIN<br />

") 24 COLLEGE<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

PARKVIEW<br />

MEMORIAL<br />

") ") 123 24<br />

HOSPITAL<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

ROCKY AV<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FOR EST DR<br />

PATRICIA DR<br />

BICKFORD DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

PROSPECT ST<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

MILL RD<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKI NS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

JORDAN AV<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BLUEBERRY LN<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

PIN E W O O D D R<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

£¤ 1 £¤ 1<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT R D<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Functioncal Classification<br />

Principal Arterial<br />

Principal Arterial - Other<br />

Principal Arterial - Other Freeways or Expressways<br />

Minor Arterial<br />

Major/Urban Collector<br />

Minor Collector<br />

Local<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Existing Conservation Land<br />

Town Boundary<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-1<br />

Roadway Functional Classification<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


network, with the goal of providing good bicyclist and pedestrian connectivity<br />

throughout the area. In addition to the off-road trails, some of the existing primary<br />

roadways throughout the area provide designated bicycle lanes, as well as sidewalks<br />

and crosswalks.<br />

The Androscoggin River Bicycle and<br />

Pedestrian Path is a 2.6-mile paved<br />

multiuse path along the Androscoggin<br />

River. The path, which serves walkers,<br />

joggers, bicyclists, and rollerbladers, offers<br />

scenic views of the river and provides a<br />

connection between downtown Brunswick<br />

and the Cooks Corner area. The path also<br />

can be accessed from Topsham by way of<br />

the pedestrian/bicycle lane over the Coastal Connector bridge. Access points to the<br />

path and parking are provided at Water Street and Grover Lane.<br />

The Androscoggin Brunswick-<br />

Topsham Riverwalk is 1.25-mile<br />

pedestrian/bicyclist in-town loop<br />

trail that allows users of the trail to<br />

enjoy the natural beauty of the river<br />

and to be well connected to the<br />

downtown and nearby residential<br />

neighborhoods. The Riverwalk<br />

connects the John A. Roebling<br />

Swinging Bridge Park to the<br />

Topsham Heights neighborhood and<br />

then runs along the riverbank to the Summer Street sidewalk to and over the Frank J.<br />

Wood Bridge to Fort Andross in Brunswick.<br />

The Town of Topsham has developed a shared-use trails master plan that builds on<br />

the paths and on-road bicyclist facilities that already exist in the town. The plan<br />

considers origins and destinations such as Mount Ararat High School, Municipal<br />

Offices, Topsham Fairgrounds, and residential neighborhoods. It also considers<br />

future developments and connections to other trails such as the Androscoggin River<br />

Bicycle and Pedestrian Path and the future Merrymeeting Trail. The phased<br />

implementation plan one day will result in an extensive alternative transportation<br />

and recreation network that will provide important nonmotorized connections<br />

throughout the municipality.<br />

The Maine Council of Governments, working with the Towns of Topsham,<br />

Bowdoinham, Richmond, and Gardiner, <strong>com</strong>missioned a study to assess the<br />

feasibility of constructing a 26-mile multiuse rail-with-trail facility along the Maine<br />

Eastern Railroad corridor. The trail would connect to the Kennebec River Trail in<br />

Gardiner and the Topsham trails, thereby including the Androscoggin River Bicycle<br />

Existing Conditions 25


and Pedestrian Path in Brunswick. The trail<br />

would provide local nonmotorized<br />

transportation alternatives as well as regional<br />

recreational opportunities.<br />

Figure 2-2 shows the existing established<br />

bicyclist and pedestrian facilities located in the<br />

Study Area. The following subsections<br />

describe existing on-road bicyclist and<br />

pedestrian ac<strong>com</strong>modations.<br />

Pleasant Street<br />

Bituminous sidewalks exist along both sides of Pleasant Street in Brunswick;<br />

however, they are not continuous for the entire length from US Route 1 to Mill Street.<br />

Sidewalk continuity is broken frequently by <strong>com</strong>mercial drives or uncurbed paved<br />

parking lots that can create long gaps in the sidewalks. There are more sidewalks<br />

along the south side of Pleasant Street than along the north side. The south side also<br />

has a number of utility poles located in the sidewalk area. The only pedestrian<br />

crosswalk across Pleasant Street within the section from US Route 1 to Mill Street is<br />

located at the signalized intersection with Old Lewiston Road.<br />

Pleasant Street does not provide designated bicycle lanes or off-road bicycle paths.<br />

Paved shoulders are narrow or nonexistent, and traffic volumes are relatively high.<br />

The <strong>com</strong>mercial character of the corridor includes frequent driveway openings that<br />

increase the potential for vehicle/bicycle conflicts. All of these factors suggest that<br />

Pleasant Street is currently not conducive to bicycle mobility.<br />

Mill Street<br />

Mill Street in Brunswick has curbed sidewalks on both sides heading northeast from<br />

Pleasant Street. The westside sidewalk ends at Cumberland Street and begins again<br />

at the waterfront park where the Swinging Bridge crosses the river into Topsham.<br />

The sidewalk then extends to Bow Street and the Maine Street interchange. The<br />

eastside sidewalk is continuous from Pleasant Street to Maine Street. Painted<br />

crosswalks exist at major intersections. Similar to Pleasant Street, Mill Street is not<br />

conducive to pedestrian and bicycle mobility due to high traffic volumes and<br />

minimal roadway shoulders.<br />

State Route 196<br />

In Topsham, State Route 196 (Lewiston Road/Coastal Connector) provides a<br />

sidewalk only on the south side, beginning at Topsham Fair Mall Road and<br />

extending to its terminus at US Route 201 (Main Street).<br />

State Route 196 bicycle lanes begin at the I-295 interchange on both sides of the road<br />

and extend past US Route 201, where they blend into the wide State Route 196<br />

shoulders. The southbound side retains a bicycle lane/shoulder to and over the<br />

Androscoggin River Bridge to where it diverges off the road to connect with the<br />

Existing Conditions 26


Androscoggin River Bicycle and Pedestrian Path. On the northbound side of the<br />

Androscoggin River Bridge, there is a shared-use path that connects the<br />

Androscoggin River Bicycle and Pedestrian Path in Brunswick to State Route 24 in<br />

Topsham. The bridge also has a northbound shoulder that allows on-road cyclists to<br />

continue on State Route 196 to the bicycle lanes in Topsham.<br />

US Route 201<br />

US Route 201 (Main Street in Topsham) has a paved sidewalk on the east side that<br />

begins at State Route 24 and extends northward, through the State Route 196<br />

intersection, to where it terminates by turning onto Canam Drive and Mount Ararat<br />

Middle School.<br />

US Route 201 provides designated striped bicycle lanes only in the vicinity of the<br />

State Route 196 intersection. North and south of the intersection, the roadway<br />

provides paved shoulders on both sides of the road that can ac<strong>com</strong>modate bicycle<br />

travel.<br />

Bath Road<br />

Bath Road (State Route 24 in Brunswick) in the vicinity of the NASB entrance has no<br />

sidewalks or shared-use paths. The roadway does provide paved shoulders of<br />

varying widths.<br />

2.2.2 Traffic Operations<br />

Existing Traffic Volumes<br />

To determine the existing traffic-volume demands and flow patterns in the Study<br />

Area, a traffic-volume-count program was conducted between the months of June<br />

and November in 2009. The 2009 count data were supplemented by 2004–2008<br />

available count data from the MaineDOT and other sources. Weekday-evening peakperiod<br />

manual-turning movement counts were conducted at the major Study Area<br />

intersections and multiday automatic traffic-recorder counts were conducted along<br />

key Study Area roadways.<br />

Review of the hourly traffic-volume variations for a typical weekday at three<br />

locations in the Study Area (i.e., Pleasant Street west of Church Road, State Route 196<br />

east of I-295, and US Route 201 north of Eagles Way), as depicted in Exhibits 2.2-1,<br />

2.2-2, and 2.2-3, exhibits typical <strong>com</strong>muter-route characteristics. The graphs show<br />

distinct weekday morning and evening peak-<strong>com</strong>muter-hour activity, and show that<br />

the highest recorded traffic volumes occur during the evening peak period.<br />

Existing Conditions 27


Existing Conditions 28


2009 Design Hour Volume<br />

The unit of measure used to evaluate and design roadway facilities is an hourly<br />

traffic volume measured in vehicles per hour (vph). However, because hourly traffic<br />

volumes can vary during the course of a day and throughout the year, it is necessary<br />

to select an appropriate design hour volume (DHV) condition. The hourly traffic<br />

volume used for the purpose of design should not be exceeded very often or by very<br />

much. However, it should not be so high that the traffic volume would rarely be high<br />

enough to make full use of the facility. It is wasteful to design a facility based on the<br />

maximum peak-hour traffic of the design year, yet the use of the average hourly<br />

traffic may result in an inadequate design. Therefore, the procedure typically used to<br />

evaluate traffic-volume demands on a roadway system, as described in A Policy on<br />

Geometric Design of Highways and Streets, 3 is to establish a 30th-highest hour volume,<br />

or DHV, as the future design condition. Given the economic considerations involved<br />

in the planning and design of roadway facilities, this DHV design criterion is selected<br />

because the 30th-highest hour volume generally reflects a “point of diminishing<br />

return” in that a substantial increase in capacity would only ac<strong>com</strong>modate few<br />

periods of higher traffic volumes.<br />

The MaineDOT generally applies seasonal-adjustment factors to the raw traffic data<br />

to establish the DHV utilizing highway classifications of Groups I, II, and III for state<br />

and local roadways. Group I roadways are defined as urban roadways that<br />

experience little seasonal variation throughout the year because they primarily serve<br />

<strong>com</strong>muter traffic. Group II roadways are defined as arterial roadways that<br />

<br />

3 American Association of State Highway and Transportation Officials, A Policy on Geometric Design of Highways and<br />

Streets, Washington, DC, 2001.<br />

Existing Conditions 29


experience moderate seasonal variation because they serve a <strong>com</strong>bination of<br />

<strong>com</strong>muter and recreational traffic. Group III roadways are defined as recreational<br />

roadways and experience significant seasonal variation. Most of the Study Area<br />

roadways (i.e., State Route 196, US Route 201, State Route 24, and Gurnet Road) are<br />

considered Group I roadways. Pleasant Street (i.e., US Route 1) is considered a<br />

Group II roadway and Harpswell Road (i.e., State Route 123) is considered a<br />

<strong>com</strong>bination of Group I and Group II roadways.<br />

Weekday-evening peak-hour traffic volumes collected for this Feasibility Study were<br />

adjusted to reflect the DHV (i.e., 30th-highest hour volume) using “Weekly Group<br />

Mean Factors” provided by the MaineDOT. The 30th-highest hour approximates the<br />

6th-highest week identified in the MaineDOT’s “Weekly Group Mean Factors,”<br />

which generally corresponds to a summer condition. Some of the raw-count data<br />

<strong>com</strong>piled for this Feasibility Study were collected during Summer 2010 conditions<br />

and therefore did not require an adjustment to represent a DHV condition. Data<br />

collected in other months were adjusted by as little as 2 percent and as much as 25<br />

percent to represent the DHV condition.<br />

Table 2.2-1 summarizes the automatic traffic-recorder-count data <strong>com</strong>piled for the<br />

Study as well as the established 2009 DHV. Figure 2-3 shows the 2009 existing DHV<br />

intersection traffic volumes.<br />

Table 2.2-1. Existing Traffic-Volume Summary<br />

Topsham Year AADT* 2009 DHV+<br />

State Route 196 west of I-295 2007 17,700 1,600<br />

State Route 196 east of I-295 2008 20,100 2,500<br />

State Route 196 east of Topsham Fair Mall Road 2007 29,100 2,200<br />

State Route 196 east of Main Street (US Route 201) 2008 18,200 1,900<br />

Main Street (US Route 201) north of Eagles Way 2008 9,900 1,100<br />

Main Street (US Route 201) south of State Route 196 2008 10,000 1,100<br />

Main Street (US Route 201) north of Elm Street 2007 13,200 1,200<br />

Brunswick Year AADT 2009 DHV<br />

Main Street (State Route 24/US Route 201) at Topsham Town Line 2007 20,000 2,100<br />

Pleasant Street (US Route 1) west of Church Street 2006 25,500 2,500<br />

US Route 1 Eastbound east of I-295 2009 11,500 NA<br />

US Route 1 Westbound east of I-295 2009 10,800 NA<br />

Pleasant Street west of Maine Street (State Route 24) 2009 6,500 900<br />

US Route 1 Eastbound east of State Route 196 2007 22,900 2,020<br />

US Route 1 Westbound east of State Route 196 2007 21,700 2,715<br />

Bath Road (State Route 24) east of Maine Street 2009 16,600 1,300<br />

Existing Conditions 30


Table 2.2-1. Existing Traffic-Volume Summary (continued)<br />

Mill Street (US Route 1) east of Cushing Street 2006 25,500 NA<br />

Gurnet Road (State Route 24) north of Forrestal Drive 2007 11,000 1,200<br />

Stills Drive (State Route 123) south of Bath Road (State Route 24) 2007 10,900 1,100<br />

*AADT: average annual daily traffic<br />

+DHV: design hour volume<br />

Existing Traffic Operations<br />

Measuring the volume of traffic in the Study Area indicates the importance of these<br />

roadways and intersections to the regional transportation system but does not<br />

necessarily indicate the quality of traffic flow. To assess the quality of traffic flow<br />

along the corridor, capacity analyses were conducted to determine how well the<br />

roadway facilities serve the traffic demands placed on them. The traffic-performance<br />

measures and the evaluation criteria used in the operational analyses are based on<br />

the methodology presented in the 2000 Highway Capacity Manual. 4<br />

A primary result of capacity analysis is the assignment of LOS, which is a qualitative<br />

measure describing operational conditions. LOS generally describes these conditions<br />

in terms of such factors as speed and travel time, density or freedom to maneuver,<br />

traffic interruptions, <strong>com</strong>fort, and convenience, thereby providing an index to quality<br />

of traffic flow. Six LOSs are defined that range in letter designation from LOS A to<br />

LOS F, with LOS A representing the best operating condition and LOS F representing<br />

the worst. LOS C describes a stable flow condition and is considered desirable for<br />

design hour traffic flow. LOS D is generally considered acceptable when the cost and<br />

impacts of making improvements to provide LOS C are deemed unjustifiable. LOS E<br />

reflects a capacity condition.<br />

Results of the 2009 DHV existing-conditions operational analyses, which were<br />

conducted for the key signalized and unsignalized intersections that control traffic<br />

operations in the Study Area, are summarized in Tables 2.2-2 and 2.2-3. Figure 2-4<br />

depicts the operationally deficient locations.<br />

As shown in Table 2.2-2, results of the 2009 DHV existing-conditions operational<br />

analyses at the signalized intersections show that the intersection of Pleasant Street at<br />

Mill Street and Stanwood Street in Brunswick currently operates over capacity at a<br />

LOS F with long delays. The intersection of Pleasant Street at Church Street in<br />

Brunswick currently operates at LOS D. However, the intersection is operating near<br />

capacity with a volume-to-capacity ratio (v/c) of 0.96 (96 percent of capacity). The<br />

intersections of State Route 196 at US Route 201, Bath Road at Federal Street and<br />

<br />

4 2000 Highway Capacity Manual, Special <strong>Report</strong> 209, Transportation Research Board, Washington, DC.<br />

Existing Conditions 31


Stills Drive, and Bath Road at the US Route 1 ramps and Gurnet Road all operate at a<br />

LOS D. The other signalized Study Area intersections operate at LOS C or better.<br />

Table 2.2-2. Signalized Intersection Capacity Analysis Summary<br />

(Results reflect overall intersection operations)<br />

2009 Existing DHV<br />

Location v/c* Delay+ LOS^<br />

State Route 196 & I-295 Northbound Ramps 0.48 16 B<br />

State Route 196 & Topsham Fair Mall Road 0.56 25 C<br />

State Route 196 & Mallet Drive 0.51 7 A<br />

State Route 196 & Hamilton Court 0.50 11 B<br />

State Route 196 & US Route 201 0.82 52 D<br />

State Route 196 & Village Drive/Community Way 1.02 30 C<br />

State Route 196 & State Route 24 Connection 0.66 19 B<br />

US Route 201 & Elm Street 0.89 22 C<br />

Maine Street & Pleasant Street 0.58 16 B<br />

Pleasant Street & Church Street 0.96 35 D<br />

Pleasant Street & River Road/Webster Street 0.85 24 C<br />

Pleasant Street & Mill Street/Stanwood Street 1.07 > 100 F<br />

Bath Road & Federal Street/Sills Drive 0.87 46 D<br />

Bath Road & Merrymeeting Plaza 0.52 10 B<br />

Bath Road & Fitch Avenue 0.49 12 B<br />

Bath Road & US Route 1 Ramps/Gurnet Road 0.65 49 D<br />

*Volume-to-capacity ratio<br />

+Delay expressed in seconds per vehicle<br />

^Level of service<br />

Results of the 2009 DHV existing-conditions analyses at the unsignalized<br />

intersections (Table 2.2-3) reveal that many side-street movements along the primary<br />

Feasibility Study corridors operate at poor levels of service (i.e., LOSs E and F). Most<br />

notably, vehicles exiting from side streets onto US Route 201 and Maine Street<br />

experience excessive delays during peak-hour conditions.<br />

Existing Conditions 32


USE CROOSING RD<br />

JESSE RD<br />

D<br />

AUGUST<br />

CATHANCE RD<br />

MUDDY RIVER<br />

LEWISTON LOWER BRANCH RAILINE<br />

IVER RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

AGADAHOC CO<br />

UMBERLAND CO<br />

IT-28<br />

ECTOR<br />

RIVER RD<br />

PORTLAND RD<br />

GREENWOOD RD<br />

AND ROS C O GG<br />

BIBBER PK W Y<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

IVER<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

") £¤ 196 201 MT ARARAT<br />

MIDDLE SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

§¨¦295<br />

MT ARARAT<br />

HIGH SCHOOL<br />

Exit 31<br />

Topsham Master Plan<br />

Proposed Trail Network<br />

") 196<br />

KING RD<br />

£¤ 201<br />

Androscoggin<br />

Brunswick-Topsham<br />

HILLCREST<br />

Riverwalk<br />

LN<br />

Androscoggin River<br />

Bicycle & Pedestrian Path<br />

DRISCOLL<br />

ISLAND<br />

BOWDOIN<br />

") 24 COLLEGE<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

PARKVIEW<br />

MEMORIAL<br />

") ") 123 24<br />

HOSPITAL<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

ROCKY AV<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

PROSPECT ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FOREST DR<br />

PATRICIA DR<br />

BICKFORD DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

MILL RD<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

R D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

JORDAN AV<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO BON WAY<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BLUEBERRY LN<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

P IN E W O OD DR<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

£¤ 1 £¤ 1<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT R D<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Major Roads<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Existing Conservation Land<br />

Town Boundary<br />

Existing Multi-Use Path/Trail<br />

Potential/Future Trail<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-2<br />

Bicycle/Pedestrian Facilities<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


Table 2.2-3. Unsignalized Intersection Capacity Analysis Summary<br />

(Results reflect specified movement operations)<br />

2009 Existing DHV<br />

Location/Movement Demand* Delay+ LOS^<br />

State Route 196 & I-295 Southbound On-Ramp<br />

Northbound left turns from State Route 196 295 12 B<br />

State Route 196 & I-295 Southbound Off-Ramps<br />

Eastbound right turns from I-295 Off-Ramp 220 13 B<br />

Westbound right turns from I-295 Off-Ramp 45 11 B<br />

US Route 201 & Old Augusta Road<br />

Westbound movements from Old Augusta Road 25 18 C<br />

Southbound movements from US Route 201 275 1 A<br />

US Route 201 & Canam Drive<br />

Westbound movements from Canam Drive 205 41 E<br />

Southbound left turns from US Route 201 10 9 A<br />

US Route 201 & Eagles Way<br />

Westbound movements from Eagles Way 110 > 100 F<br />

Southbound movements from US Route 201 430 2 A<br />

Maine Street & US Route 1 Southbound Off-Ramp<br />

Westbound movements from Off-Ramp 150 67 F<br />

Maine Street & US Route 1 Southbound On-Ramp<br />

Northbound left turns from Maine Street 210 12 B<br />

Maine Street & US Route 1 Northbound Off-Ramp<br />

Eastbound right turns from Off-Ramp 100 11 B<br />

Maine Street & Mason Street<br />

Westbound left turns from Mason Street 15 > 100 F<br />

Westbound right turns from Mason Street 285 41 E<br />

Southbound left turns from Maine Street 320 22 C<br />

Maine Street & Bath Road<br />

Southbound left turns from Maine Street 565 14 B<br />

Gurnet Road & Forrestal Drive/Lee's Tire<br />

Eastbound movements from Forrestal Drive 40 65 F<br />

Westbound movements from Lee's Tire 40 23 C<br />

Northbound left turns from Gurnet Road 5 9 A<br />

Southbound left turns from Gurnet Road 25 9 A<br />

Existing Conditions 34


Table 2.2-3. Unsignalized Intersection Capacity Analysis Summary (continued)<br />

2009 Existing DHV<br />

Location/Movement Demand* Delay+ LOS^<br />

Gurnet Road & Coombs Road (north)/Board Road<br />

Eastbound movements from Coombs Road 10 21 C<br />

Westbound movements from Board Road 0 0 A<br />

Northbound movements from Gurnet Road 390 1 A<br />

Gurnet Road & Coombs Road (south)<br />

Eastbound movements from Coombs Road 10 15 B<br />

Northbound movements from Gurnet Road 390 1 A<br />

Harpswell Road & Baxter Lane/Jonathan Street<br />

Eastbound movements from Baxter Lane 5 14 B<br />

Westbound movements from Jonathan Street 10 12 B<br />

Northbound movements from Harpswell Road 200 1 A<br />

Southbound movements from Harpswell Road 275 1 A<br />

Harpswell Road & Middle Bay Road<br />

Eastbound movements from Middle Bay Road 120 13 B<br />

Westbound movements from Golf Course 65 16 C<br />

Northbound movements from Harpswell Road 205 2 A<br />

Southbound movements from Harpswell Road 250 1 A<br />

* Demand in vehicles per hour<br />

+ Delay expressed in seconds per vehicle<br />

^ Level of service<br />

2.2.3 Crash Evaluation<br />

A review of high crash locations (HCLs) in the Study Area was <strong>com</strong>pleted for the<br />

most recent three-year period of crash data available (i.e., 2006–2008). To evaluate<br />

whether a location is problematic, the MaineDOT utilizes two criteria to define what<br />

is called an HCL. Both of the following criteria must be met to be classified as an<br />

HCL:<br />

A Critical Rate Factor (CRF) of 1.00 or more for a three-year period. A CRF<br />

<strong>com</strong>pares the actual crash rate at a specific location to the rate for similar<br />

intersections in the state. A CRF of less than 1.00 indicates a below-average crash<br />

rate.<br />

A minimum of eight crashes during the latest three-year period.<br />

Based on a review of the 2006–2008 crash records, the locations that met both criteria<br />

were identified. In addition, the locations that met one of the two criteria and were<br />

close to meeting the other were included in a more detailed review. For example, if an<br />

intersection had eight crashes and a CRF of 0.95 or seven crashes and a CRF of 1.00,<br />

that location also was included for further examination. When the locations of interest<br />

Existing Conditions 35


USE CROOSING RD<br />

JESSE RD<br />

D<br />

AUGUST<br />

CATHANCE RD<br />

MUDDY RIVER<br />

RIVER RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

RIVER RD<br />

EMILY ST<br />

RIVERVIEW DR<br />

RIVER RD<br />

ROCKY AV<br />

LEWISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

TOPSHAM FAIR MALL RD<br />

") 196 £¤ 201 £¤ 201 ") 123 ") 24 ") 24<br />

IVER RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

SAGADAHOC CO<br />

UMBERLAND CO<br />

AND ROS C O G G<br />

IN R<br />

IVER<br />

BLUEBERRY LN<br />

!H<br />

PARK DR<br />

§¨¦295<br />

!H !H!H<br />

LEWISTON RD<br />

MALLETT DR<br />

MALLETT DR<br />

ANTHON Y AV<br />

FORE ST DR<br />

PATRICIA DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

WOOD AV<br />

CAROLYN ST<br />

OLD AUGUSTA RD<br />

!H<br />

BARBARA ST<br />

BARROWS DR<br />

MAIN ST<br />

WILLIAMS DR<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

CANAM DR<br />

!H<br />

!H<br />

HANSON DR<br />

WESTERN AV<br />

MAIN ST<br />

REPUBLIC AV<br />

MT ARARAT<br />

HIGH SCHOOL<br />

") 196<br />

PLEASANT ST<br />

TOPSHAM<br />

ANNEX<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

!H<br />

COASTAL CONNECTOR<br />

AUDO B ON WAY<br />

KING RD<br />

TOPSHAM CRSG<br />

TEDFORD DR<br />

LOWER ROAD RAILLINE<br />

XIT-28<br />

ECTOR<br />

D PORTLAND RD<br />

GREENWOOD RD<br />

BIBBER P K W Y<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

PLEASANT ST<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

FRONT ST<br />

SOKOKIS<br />

CIR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

OAK ST<br />

PROSPECT ST<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

BICKFORD DR<br />

WALNUT ST<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

MILL RD<br />

HIGH ST<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

WINTER ST<br />

GARDEN DR<br />

CEDAR ST<br />

GILMAN AV<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

R D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

JORDAN AV<br />

ELM ST<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

DAVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

P IN E W O O D D R<br />

LORI<br />

DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

MERRYMEETING DR<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

LOVERS LN<br />

MURDER RD<br />

Legend<br />

Major Roads<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Existing Conservation Land<br />

Town Boundary<br />

!H Operationally Deficient Intersections<br />

") 196<br />

!H £¤<br />

!H<br />

1 DRISCOLL<br />

ISLAND<br />

£¤ !H<br />

£¤ 1<br />

1<br />

MAINE VOCATIONAL<br />

REGION 10<br />

!H !H<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

HOSPITAL<br />

BOWDOIN<br />

COLLEGE<br />

!H<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

BATH RD<br />

SEAHAWK AV<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

BATH RD<br />

!H<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

!H<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT RD<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-4<br />

Operationally Deficient Locations<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


were identified, individual police reports for those locations were requested from the<br />

MaineDOT and collision diagrams were prepared. The collision diagrams were then<br />

examined to identify whether there are patterns that can be corrected.<br />

Figure 2-5 and Tables 2.2-4 and 2.2-5 summarize the HCLs for the Study Area<br />

intersections and roadway segments as established using the MaineDOT criteria.<br />

When a node is identified with the prefix “P”, it means that it was in proximity to an<br />

adjacent node and, for the purposes of crash reporting, the MaineDOT considers the<br />

two nodes as a single node. The tables also identify how many police reports were<br />

actually provided by the MaineDOT for that location. Occasionally, there are<br />

discrepancies between what is originally reported in the summary sheets and the<br />

actual number of police reports. This occurs because as the police reports are pulled,<br />

miscodings made on the originals are identified and adjusted as needed. The most<br />

substantial change for this Study Area is Node 13637, which is identified in the<br />

summary sheets as having eight crashes and a CRF of 1.06, thus making it a HCL.<br />

According to the MaineDOT, there were numerous miscodings for this node and the<br />

actual number of police reports is three. Because there were only three reports, Node<br />

13637 was not listed in the summary tables.<br />

Table 2.2-4. 2006–2008 Intersection Crash Data<br />

Node<br />

Intersection<br />

Number of<br />

Collisions<br />

Crash<br />

Rate CRF* HCL+<br />

Police<br />

<strong>Report</strong>s<br />

44511 (T) State Route 196/Route 24 Connector 11 0.41 1.27 Yes 11<br />

60685 (T)<br />

State Route 196/Village Drive/<br />

0.45<br />

10<br />

Community Way<br />

1.32 Yes 10<br />

P44020 (T) State Route 196/US Route 201 36 0.95 0.96 No 36<br />

44585 (T) State Route 196/Hamilton Court 12 0.42 1.31 Yes 12<br />

44588 (T)<br />

State Route 196/I-295 Southbound Off-<br />

1.60<br />

15<br />

Ramp<br />

4.22 Yes 16<br />

44593 (T)<br />

State Route 196/I-295 Northbound Off-<br />

0.79<br />

11<br />

Ramp<br />

2.31 Yes 10<br />

17218 (B)<br />

Maine Street/US Route 1 Southbound<br />

1.52<br />

15<br />

Off-Ramp<br />

4.30 Yes 15<br />

17212 (B)<br />

Bath Road/US Route 1 On-Off-<br />

0.96<br />

42<br />

Ramps/Gurnet Road<br />

1.00 Yes 42<br />

15865 (B) Bath Road/Merrymeeting Plaza 10 0.47 1.31 Yes 10<br />

15879 (B) Maine Street/Elm Street 9 0.37 1.07 Yes 9<br />

15874 (B) Maine Street/Noble Street 12 0.76 1.96 Yes 14<br />

15873 (B) Maine Street/Bath Road 8 0.59 1.47 Yes 6<br />

13700 (B)<br />

Maine Street/Columbia Avenue/<br />

0.50<br />

7<br />

Longfellow Avenue<br />

1.39 No 7<br />

13839 (B) Pleasant Street/Cushing Street 8 1.03 2.45 Yes 7<br />

14928 (B) Pleasant Street/Union Street 19 1.50 1.24 Yes 18<br />

18641 (B) US Route 1/Old Portland Road 7 0.54 1.87 No 7<br />

17190 (B) Pleasant Street/Church Road 30 0.99 0.97 No 29<br />

Existing Conditions 38


Table 2.2-4. 2006–2008 Intersection Crash Data (continued)<br />

Number of<br />

Node Intersection<br />

Collisions<br />

Crash<br />

Rate CRF* HCL+ Police <strong>Report</strong>s<br />

17200 (B) Mill Street/Cushing Street 15 0.42 1.40 Yes 15<br />

61022 (B) Mill Street (Westbound)/Ramp “A” 7 0.39 1.29 No 7<br />

18539 (B) US Route 1 Off-Ramp/Cooks Corner 15 1.07 2.81 Yes 17<br />

10343 (B) Bath Road/Tibbetts Drive 19 0.84 2.61 Yes 22<br />

(T) = Topsham<br />

(B) = Brunswick<br />

*Critical Rate Factor<br />

+High crash location<br />

Table 2.2-5. 2006–2008 Roadway Segment Crash Data<br />

Segment Roadway From To<br />

Number of<br />

Collisions<br />

Crash<br />

Rate CRF* HCL+<br />

61017-44168 (B) Maine Street Ramp “C” Town Line 14 669.44 1.70 Yes 14<br />

17212-19591 (B) Gurnet Road Cooks Corner Mall Cooks Corner 12 1,171.72 2.79 Yes 12<br />

10087-17212 (B) Bath Road Mall Entrance Gurnet Road 11 378.77 1.03 Yes 10<br />

15878-15879 (B) Maine Street Elm Street Fitch Place 8 432.35 1.35 Yes 8<br />

15879-15880 (B) Maine Street Everett Street Elm Street 9 428.69 1.48 Yes 9<br />

15882-15884 (B) Maine Street Center Street Town Hall Place 17 1,754.25 3.71 Yes 17<br />

15887-15888 (B) Maine Street Gilman Avenue Dunlap Street 7 1,043.38 2.01 No 7<br />

13766-17196 (B) Pleasant Street Stanwood Street Spring Street 8 594.99 1.52 Yes 8<br />

13839-14928 (B) Pleasant Street Cushing Street Union Street 7 479.87 1.25 No 7<br />

13840-14928 (B) Pleasant Street Union Street Middle Street 8 995.14 2.23 Yes 9<br />

17189-17190 (B) Pleasant Street Robinson Avenue Church Road 20 572.63 1.62 Yes 19<br />

17190-17191 (B) Pleasant Street Church Road LaVallee Avenue 31 1,426.19 3.62 Yes 34<br />

17191-17192 (B) Pleasant Street LaVallee Avenue Westminster Avenue 21 968.00 2.46 Yes 21<br />

17192-17193 (B) Pleasant Street Westminster Avenue River Road 21 431.06 1.31 Yes 20<br />

13822-17194 (B) Pleasant Street Webster Street Lombard Street 20 1,157.78 2.78 Yes 20<br />

17194-17195 (B) Pleasant Street Lombard Street Summer Street 36 1,695.86 4.28 Yes 36<br />

17195-61001 (B) Pleasant Street Summer Street Stanwood Street 10 652.22 1.52 Yes 10<br />

61000-17197 (B) Mill Street Pleasant Street Sage Hill 7 682.65 1.44 No 7<br />

9615-17220 (B) US Route 1 Maine Street Ramp State Route 196 7 227.93 1.24 No 7<br />

10343-13637 (B) Bath Road Thomas Point Road Tibbetts Drive 21 397.65 1.41 Yes 22<br />

(T) = Topsham<br />

(B) = Brunswick<br />

*Critical Rate Factor<br />

Police<br />

<strong>Report</strong>s<br />

+ High Crash Location<br />

In general, the crash evaluation revealed that 16 roadway segments were identified<br />

as HCLs with an additional four segments approaching the HCL criteria. Similarly,<br />

16 intersections in the Study Area were reported as HCLs with an additional five<br />

intersections approaching the HCL criteria. Although no segments of State Route 196<br />

were determined to be HCLs, five intersections (i.e., Bypass Drive, Village Drive,<br />

Hamilton Court, I-295 southbound off-ramp, and I-295 northbound off-ramp) were<br />

Existing Conditions 39


determined to be HCLs. A sixth intersection at US Route 201 almost qualified as a<br />

HCL with 36 crashes but had a CRF of 0.96. Of the 96 reported crashes at these six<br />

intersections along State Route 196, 78 (or just over 80 percent) were reported as rearend<br />

collisions. Approximately 74 percent of those reported crashes (i.e., 71 of 96)<br />

were caused by driver inattention or distraction. No fatalities were reported along<br />

State Route 196 at these six intersections during the latest three-year period (i.e.,<br />

2006–2008).<br />

Along Pleasant Street, nine roadway segments were determined to be HCL segments<br />

(with a tenth approaching). Additionally, two intersections along Pleasant Street (i.e.,<br />

Cushing Street and Union Street) were determined to be HCLs with two other<br />

intersections (i.e., Old Portland Road and Church Street) approaching the HCL<br />

criterion. In total, 245 crashes were reported at these ten segments and four<br />

intersections. More crashes were reported as rear-end collisions (i.e., 91 crashes, or<br />

approximately 37 percent) than any other type of crash. A substantial number of<br />

crashes were associated with turning movements and lane changes. Specifically, of<br />

the 245 crashes, 83 (i.e., 34 percent) were reported as turning movements, 41 (i.e., 17<br />

percent) were reported as lane changes, and 15 (i.e., 6 percent) were reported as<br />

angular collisions. The most <strong>com</strong>mon contributing human factors for crashes along<br />

Pleasant Street were driver inattention or distraction, improper or unsafe lane<br />

changes, improper turns, and failure to yield the ROW. No fatalities were reported<br />

along Pleasant Street at these ten segments and four intersections during the latest<br />

three-year period (i.e., 2006–2008).<br />

Although no segments of Mill Street were determined to be HCLs, the intersection of<br />

Cushing Street was determined to be a HCL, with the intersection of the westbound<br />

ramp from Maine Street approaching the HCL criterion along Mill Street. Four<br />

roadway segments along Maine Street were identified as HCLs, with another two<br />

approaching the criterion. Additionally, four intersections (i.e., US Route 1<br />

southbound off-ramp, Elm Street, Noble Street, and Bath Road) were determined to<br />

be HCLs, with a fifth intersection (i.e., Columbia Avenue) approaching the HCL<br />

criterion along Maine Street. Between Mill Street and Maine Street, 135 crashes were<br />

reported during the latest three-year period (i.e., 2006–2008). Rear-end collisions<br />

were predominant at the ramp locations of Mill Street and Maine Street, whereas<br />

angular, turning, and lane-changing crashes were more <strong>com</strong>mon at all other<br />

intersections and segments along Mill Street and Maine Street. No fatalities were<br />

reported along Mill Street or Maine Street at these six segments and seven<br />

intersections during the latest three-year period (i.e., 2006–2008).<br />

Along State Route 24 (i.e., Bath Road and Gurnet Road), three roadway segments<br />

were determined to be HCL segments. Additionally, three intersections along State<br />

Route 24 (i.e., Merrymeeting Plaza, US Route 1 on- and off-ramps, and Tibbetts<br />

Drive) were determined to be HCLs. In total, 135 crashes were reported at these three<br />

segments and three intersections. The predominant contributing human factor was<br />

driver inattention or distraction (i.e., 74 of the 135 crashes, or approximately 55<br />

percent). No fatalities were reported along State Route 24 (i.e., Bath Road and Gurnet<br />

Existing Conditions 40


Road) at these three segments and three intersections during the latest three-year<br />

period (i.e., 2006–2008).<br />

Of the locations identified in Tables 2.2-4 and 2.2-5, two are currently under review<br />

by the MaineDOT, as follows:<br />

Cleaveland Street/Maine Street/Noble Street (Node 15874): This general area is<br />

currently being reviewed by the MaineDOT. A new design is expected to change<br />

the traffic patterns in a manner that addresses the issues related to the crash rate.<br />

Bath Road East/Maine Street/Upper Park Row (Node 15873): Similar to Node<br />

15874, this general area is currently being reviewed by the MaineDOT. A new<br />

design is expected to change the traffic patterns that address issues related to the<br />

crash rate.<br />

In addition, there is an ongoing town-initiated corridor redesign for Bath Road from<br />

approximately Cooks Corner to Old Bath Road/Lowe’s driveway. This redesign also<br />

includes a review and potential retiming of the traffic signals at Tibbetts Drive (i.e.,<br />

Wal-Mart) and at Old Bath Road/Lowe’s driveway. The redesign includes the<br />

following HCLs:<br />

Node 10343: Bath Road at Tibbetts Drive (i.e., Wal-Mart)<br />

Segment 10343–13637: Bath Road from Tibbetts Drive to Thomas Point Road<br />

2.3 Environmental Resources<br />

This section describes the environmental resources in the Study Area. The existingconditions<br />

inventory was <strong>com</strong>piled using various sources, as discussed herein.<br />

Environmental resources inventoried include wetlands; surface water; groundwater;<br />

floodplains; farmlands; rare, threatened, and endangered species; wildlife habitat;<br />

and potential soil and groundwater contaminated sites.<br />

2.3.1 Wetlands<br />

The National Wetlands Inventory (NWI) mapping, National Resources Conservation<br />

Service (NRCS) hydric-soils mapping, and aerial-photography–interpreted wetlands<br />

provided by the Towns of Brunswick and Topsham were reviewed to determine the<br />

potential location of wetlands in each transportation-strategy Study Area.<br />

Environmental scientists verified potential wetlands by <strong>com</strong>pleting a windshieldlevel<br />

field-reconnaissance effort on September 2 and 3, 2009. Due to minor changes in<br />

the Study Area footprint, additional fieldwork was <strong>com</strong>pleted on May 21 and 22,<br />

Existing Conditions 41


HOUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA R<br />

CATHANCE RD<br />

MUDDY RIVER<br />

LEWISTON LOWER BRANCH RAILINE<br />

IVER RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

SAGADAHOC CO<br />

UMBERLAND CO<br />

XIT-28<br />

ECTOR<br />

RIVER RD<br />

D PORTLAND RD<br />

GREENWOOD RD<br />

AND ROS C O G G<br />

BIBBER P K W Y<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

IVER<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

") £¤ 196 201 MT ARARAT<br />

MIDDLE SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

§¨¦295<br />

!.<br />

MT ARARAT<br />

HIGH SCHOOL<br />

!.<br />

Exit 31<br />

!. ") 196<br />

!.<br />

KING RD<br />

£¤ 201 !.<br />

HILLCREST<br />

LN<br />

!. £¤ 1<br />

!.<br />

DRISCOLL<br />

ISLAND<br />

!. !.<br />

!.<br />

£¤ 1<br />

!.!.<br />

BOWDOIN<br />

!.<br />

COLLEGE ") !.<br />

24<br />

!. !.<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

PARKVIEW<br />

MEMORIAL<br />

123<br />

") 24<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MARRINER RD<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BLUEBERRY LN<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

ROCKY AV<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

OAK ST<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

COFFIN<br />

SCHOOL<br />

WOODSIDE<br />

ELEM SCHOOL<br />

FORE ST DR<br />

PATRICIA DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

MALLETT DR<br />

PROSPECT ST<br />

BRIDGE ST<br />

BICKFORD DR<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

MILL RD<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

LINCOLN ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

JORDAN AV<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

JORDAN<br />

ACRES SCHOOL<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

£¤ 1 ") 196<br />

MACMILLAN DR<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

BLUEBERRY LN<br />

GROVE ST<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

P IN E W O O D D R<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

ANDROSCOGGIN RIVER<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

COW ISLAND<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

INDEPENDENCE DR<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

THOMAS POINT RD<br />

PERRYMAN DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

Legend<br />

Major Roads<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Existing Conservation Land<br />

Town Boundary<br />

!. High Crash Location (HCL) Intersection<br />

High Crash Location (HCL) Segment<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-5<br />

High Crash Locations<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


2010. Trimble ProXT Global Positioning System (GPS) units with an accuracy of<br />

submeter or better were used to verify and update existing wetland mapping and to<br />

collect previously unidentified wetland boundaries. GPS points were collected at the<br />

corners of wetlands to map their general extent in the Study Area. Formal<br />

delineations were not performed. Figure 2-6 shows the extent of wetlands in the<br />

Study Area.<br />

Strategy 1<br />

According to NRCS digital GIS soil data, patches of hydric-soil units consisting of<br />

Scarboro sandy loam, Au Gres loamy sand, and Limerick-Saco silt loams are found in<br />

the Strategy 1 Study Area.<br />

Together, the photo–interpreted wetlands data provided by the Town of Brunswick<br />

and NWI mapping indicated 10 wetlands systems located in the Study Area. The<br />

windshield-level survey did not add any other wetland systems, but the previously<br />

mapped boundaries were adjusted to reflect current conditions. On the north side of<br />

US Route 1, west of Cooks Corner, two palustrine forested wetland systems (wetland<br />

1-1 and 1-2) with perennial stream flow are located. The streams are culverted by 18-<br />

to 24-inch pipes located under US Route 1 and drain to the Androscoggin River.<br />

A large palustrine emergent wetland (wetland 1-3) is located in the center of the<br />

Study Area. The wetland receives flow from a perennial stream via a culvert that<br />

channelizes the stream from the south side of US Route 1. Historically, this wetland<br />

was part of a larger system that extended south to Bath Road, but it apparently was<br />

filled to allow for the construction of US Route 1. In the Study Area, a utility-line<br />

corridor divides the wetland where a dam has been constructed, impounding a small<br />

amount of surface water. The wetland can be viewed from the Merrymeeting Park<br />

wayside historical area located along the Androscoggin River Bicycle and Pedestrian<br />

Path.<br />

An additional forested wetland (wetland 1-4) is partially located on the eastern side<br />

of the Androscoggin River Scenic Area and extends east to an existing private<br />

driveway on the north side of US Route 1. This relatively small wetland along the<br />

Androscoggin River provides floodplain storage and protection for US Route 1.<br />

Three wetlands are located on the south side of US Route 1 The first, a scrub-shrub<br />

wetland (wetland 1-5), is located immediately west of Cooks Corner in an existing<br />

utility corridor. The western edge of the wetland extends into a mobile home park;<br />

the eastern edge extends into a privately owned, unoccupied parcel. The wetland<br />

outlets at a culvert that drains to a larger forested wetland on the north side of US<br />

Route 1.<br />

A recently constructed bioretention pond (wetland 1-6) associated with Shaw’s<br />

Supermarket is located on the rear of the property between US Route 1 and the<br />

Existing Conditions 43


grocery store. The size of the pond is approximately 0.3 acre and outlets to a large<br />

scrub-shrub/forested wetlands.<br />

A large scrub-shrub/forested wetland (wetland 1-7) is located in a valley between<br />

two large <strong>com</strong>mercially developed parcels. Beaver flowage is found in central areas<br />

of the wetland, which receives flow from a perennial stream that originates on the<br />

NASB. The perennial stream meanders through the wetland, which outlets to a<br />

culvert under US Route 1. Prior to construction of US Route 1, this wetland was part<br />

of a larger wetland system located on the north side of US Route 1.<br />

Located on the western end of the Study Area is a large floodplain forest (wetland 1-<br />

8) that receives flow from multiple perennial streams. Most of the area consists of<br />

forested wetland habitat, with a strip of emergent wetland extending west along US<br />

Route 1. The wetland outlets via a culvert into a small emergent wetland on the north<br />

side of US Route 1.<br />

Two additional wetlands (wetland 1-9 and 1-10), located on the NASB, were not<br />

visited in the field due to their location on the base, but they are clearly visible in<br />

aerial photographs. Both wetlands are relatively small systems (i.e., less than 2 acres)<br />

and consist primarily of open-water habitat. The wetlands are connected by a<br />

perennial stream that originates on the southernmost wetlands and outlets under<br />

Bath Road via a culvert. The stream provides flow to previously described wetlands<br />

located on both the southern and northern sides of US Route 1.<br />

Strategy 2A<br />

NWI mapping indicated four small wetlands systems (wetland 2A-1and 2A-6) in the<br />

Strategy 2A Study Area. The windshield-level survey located six small wetlands on<br />

Lewiston Road, west of Exit 31. These wetlands consist of emergent, forested, and<br />

open-water wetlands. The largest wetland (i.e., wetland 2A-4) occurs in an island of<br />

forested wetlands area between the I-295 southbound on- and off-ramps. Two<br />

perennial streams also are located in this area, both along the I-295 on- and off-ramps<br />

at Exit 31.<br />

The portion of the Study Area east of Exit 31 and Main Street (US Route 201) in<br />

Topsham has experienced substantial development and contains relatively few<br />

wetland resources. NWI mapping did not identify any wetland systems in this area;<br />

however, the windshield-level survey identified two small emergent wetland<br />

systems: (1) along the I-295 northbound on-ramp (wetland 2A-7); and (2) on the<br />

south side of Lewiston Road at the outlet of a culverted perennial stream (wetland<br />

2A-8).<br />

On US Route 201 (Main Street) north of State Route 196, several wetlands (wetland<br />

2A-9) were located in a utility-line corridor adjacent to the entrance of Mount Ararat<br />

High School. These scrub-shrub/emergent wetland systems consist of areas of<br />

goldenrod, raspberry, jewel weed, and various sedges, with patchy areas of alder<br />

Existing Conditions 44


scrub-shrub habitat. The largest of the wetlands (wetland 2A-10) is located on the<br />

east side of US Route 201, behind Pine State Safety Lines, Inc. A perennial stream<br />

associated with this wetland originates on the Mount Ararat High School property<br />

and flows south through the wetland.<br />

Farther to the north on US Route 201, two small wetlands are located in the vicinity<br />

of Old Augusta Road. The first (wetland 2A-11) consists of an emergent roadside<br />

ditch adjacent to US Route 201. The second (wetland 2A-12) is located behind a<br />

mobile-home retailer, adjacent to a large open field. Habitat associated with this<br />

wetland is dominated by forested habitat with a small area of open-water habitat.<br />

The northern edge of the wetland consists of a small area of emergent habitat<br />

adjacent to the field.<br />

The eastern portion of this Study Area (i.e., east of the US Route 201/State Route 196<br />

intersection) contains several perennial-stream crossings bordered by narrow bands<br />

of emergent and forested wetland habitat. The largest wetland (2A-13) in this area is<br />

located west of Village Drive and is divided by State Route 196. A perennial-stream<br />

channel, originating on the south side of State Route 196, connects the two wetlands.<br />

The stream flows from southwest to northeast and is a tributary to the Cathance<br />

River.<br />

In addition to the wetlands previously described, several roadside ditches are located<br />

along this corridor, especially between US Route 201 and Village Drive – where a<br />

ditch runs on the north side of the road.<br />

Strategy 2B<br />

Wetland resources in the Strategy 2B Study Area are limited by residential and<br />

<strong>com</strong>mercial development. US Route 1 (Pleasant Street) in Brunswick is almost<br />

entirely built-out on both sides of the road. However, several wetlands systems were<br />

identified in the aerial-photography–interpreted mapping provided by the Town of<br />

Brunswick. The largest system is a forested wetland (wetland 2B-1) located on the<br />

south side of the Exit 28 connector road. The wetland originates along the southern<br />

slope of the Connector Road and extends south to Old Portland Road, where it<br />

outlets to a perennial stream that eventually crosses Pleasant Street and flows into an<br />

emergent wetland.<br />

On the north side of the Connector Road are several small wetlands consisting of<br />

emergent and forested-wetlands habitat that eventually drain to a perennial-stream<br />

channel (wetland 2B-2) . The stream originates as a ditch in the vicinity of a utilityline<br />

corridor that crosses the Exit 28 Connector Road, just west of Pleasant Street. An<br />

emergent wetland (wetland 2B-3) surrounds the stream channel between Pleasant<br />

Street and Range Road. The emergent wetland be<strong>com</strong>es widespread and parallels the<br />

north side of Pleasant Street. The wetland extends out of the Study Area, where it is<br />

associated with the floodplain of the Androscoggin River.<br />

Existing Conditions 45


The Strategy 2B Study Area east of River Road is primarily developed, with one<br />

wetland system (wetland 2B-4) located east of Riverside Cemetery. The forested<br />

wetland borders the Androscoggin River and receives flow from a perennial stream<br />

that crosses Pleasant Street from the south. East of Mill Street is an isolated wetland<br />

(wetland 2B-5) located in the vicinity of the old railroad depot.<br />

Strategy 2C<br />

The north side of Mill Street, from Pleasant Street to the Brunswick Mill area, is<br />

bordered by the Androscoggin River. The south side of the road is predominantly<br />

residential development with no wetlands. East of Maine Street, several small<br />

wetlands (wetland 2C-1 through 2C-7) were identified by the photo–interpreted<br />

wetlands data and confirmed in the field. Most of these wetlands occur on either side<br />

of the railroad bed in the vicinity of the Androscoggin River Bicycle and Pedestrian<br />

Path.<br />

Strategy 3<br />

No wetland resources were located on the existing Rockland Branch Railroad<br />

between Jordan Avenue in Brunswick and the proposed connection across State<br />

Route 24 (Bath Road).<br />

However, two wetlands were identified on the NASB, which overlap with Strategy 1.<br />

These wetlands are described in the Strategy 1 discussion.<br />

2.3.2 Surface Waters<br />

The Androscoggin River is a main feature of the Study Area. The river is 178 miles<br />

long and its watershed <strong>com</strong>prises portions of Maine and New Hampshire. The<br />

Androscoggin River begins at the outlet of Umbagog Lake in Errol, New Hampshire.<br />

The river flows south through Berlin, New Hampshire, before crossing over the state<br />

line in Gilead, Maine. Beyond Gilead, the river turns east, flowing through the towns<br />

of Bethel, Newry, Hanover, Rumford, and Canton. In Livermore Falls, the river takes<br />

a more southerly course, traveling into Auburn and Lewiston. In Lewiston, the river<br />

flows southeasterly through Durham, Lisbon Falls, Topsham, and Brunswick. In<br />

Brunswick, the river transitions to tidal water at Merrymeeting Bay, which is an<br />

approximately 10-mile-long tidal estuary located at the confluence of the<br />

Androscoggin and Kennebec Rivers. From the confluence, it is approximately 20<br />

miles to the Atlantic Ocean, where the Kennebec River empties into the Gulf of<br />

Maine.<br />

The watershed for the Androscoggin River at Merrymeeting Bay is approximately<br />

350 square miles. The Androscoggin River is defined as a “Great River” and is<br />

therefore protected by the Mandatory Shoreland Protection Act (Title 38, MRSA<br />

Existing Conditions 46


OUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

RIVER RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

RIVER RD<br />

EMILY ST<br />

RIVERVIEW DR<br />

RIVER RD<br />

ROCKY AV<br />

LEWISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

TOPSHAM FAIR MALL RD<br />

") 196 £¤ 201 £¤ 201 ") 123 ") 24 ") 24<br />

IVER RD<br />

IVAN H OE DR<br />

MIDDLESEX RD<br />

AGADAHOC CO<br />

UMBERLAND CO<br />

AND ROS C O GG<br />

IN R<br />

IVER<br />

BLUEBERRY LN<br />

2A-1<br />

2A-2<br />

2A-3<br />

2A-4<br />

2A-6<br />

2A-5<br />

PARK DR<br />

§¨¦295<br />

LEWISTON RD<br />

2A-8<br />

2A-7<br />

MALLETT DR<br />

MALLETT DR<br />

ANTHON Y AV<br />

FOREST DR<br />

PATRICIA DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

2A-11<br />

WOOD AV<br />

CAROLYN ST<br />

OLD AUGUSTA RD<br />

2A-12<br />

BARBARA ST<br />

BARROWS DR<br />

MAIN ST<br />

WILLIAMS DR<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

CANAM DR<br />

2A-9 2A-10<br />

HANSON DR<br />

WESTERN AV<br />

MAIN ST<br />

REPUBLIC AV<br />

MT ARARAT<br />

HIGH SCHOOL<br />

PLEASANT ST<br />

TOPSHAM<br />

ANNEX<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

COASTAL CONNECTOR<br />

AUDO B ON WAY<br />

STRATEGY 2A<br />

2A-13<br />

KING RD<br />

TOPSHAM CRSG<br />

TEDFORD DR<br />

LOWER ROAD RAILLINE<br />

XIT-28<br />

ECTOR<br />

PORTLAND RD<br />

GREENWOOD RD<br />

BIBBER PK W Y<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

PLEASANT ST<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

FRONT ST<br />

SOKOKIS<br />

CIR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

OAK ST<br />

PROSPECT ST<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

BICKFORD DR<br />

WALNUT ST<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

MILL RD<br />

HIGH ST<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

WINTER ST<br />

GARDEN DR<br />

CEDAR ST<br />

GILMAN AV<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

JORDAN AV<br />

MAPLE ST<br />

ELM ST<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

DAVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

P IN E W O OD DR<br />

LORI<br />

DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

MERRYMEETING DR<br />

BAY PARK DR<br />

OLD TAVERN R D<br />

LOVERS LN<br />

MURDER RD<br />

Legend<br />

Transportation Strategy Corridor<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Major Roads<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Study Area Wetlands (Labeled with ID #)<br />

Hydric Soils (NRCS)<br />

Study Area Streams<br />

2B-2<br />

2B-1<br />

£¤<br />

£¤ 1<br />

2B-4<br />

Scenic Area<br />

Former Site of<br />

Merrymeeting Park<br />

2B-3<br />

2B-5<br />

") 196<br />

2C-3<br />

2C-2<br />

2C-1<br />

2C-5<br />

£¤ 1 2C-7<br />

2C-4<br />

2C-6<br />

DRISCOLL<br />

ISLAND<br />

Androscoggin River<br />

MAINE VOCATIONAL<br />

REGION 10<br />

STRATEGY 2B<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

HOSPITAL<br />

STRATEGY 2C<br />

BOWDOIN<br />

COLLEGE<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

1-8<br />

STRATEGY 3<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

BATH RD<br />

1-4<br />

SEAHAWK AV<br />

1-7<br />

1-9<br />

1-10<br />

PEGASUS ST<br />

1-3<br />

1-6<br />

1-2<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

1-5<br />

BATH RD<br />

1-1<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

STRATEGY 1<br />

CORAL<br />

SEA ST<br />

THOMAS POINT RD<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-6<br />

Wetlands<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS


Sections 435-449). However, the river is not classified as a “Significant River” or<br />

“Wild & Scenic River” under additional state and federal regulations.<br />

2.3.3 Groundwater Resources<br />

Information on groundwater resources in the form of substantial aquifers mapped by<br />

the Maine Department of Conservation, Maine Geological Survey, was retrieved<br />

from the MEGIS database. Substantial aquifers are defined as bodies of coarsegrained<br />

glacial material with the potential to yield 10 or more gallons per minute<br />

(gpm) to a properly constructed well. This analysis indicates that the Study Area is<br />

underlain by substantial aquifers yielding 10 to 50 gpm (see Figure 2-7). Specifically,<br />

substantial aquifers are located on both ends of transportation Strategy 1; the<br />

southern portion of Strategy 2A from Village Drive to the Androscoggin River; the<br />

portions of Strategy 2B from Church Road to Turner Street and Pleasant Street east of<br />

Mill Street; the eastern end of Strategy 2C; and almost the entire rail Strategy 3.<br />

GIS data from the Maine Department of Human Services, Drinking Water Program,<br />

were reviewed to determine whether the Study Area is located within a designated<br />

Well Head Protection Area or Source Water Protection Area, or if there are any<br />

mapped public or private wells in the vicinity. The review identified a single<br />

nontransient public water-supply system well and its associated Well Head<br />

Protection Area. The well is located approximately 0.25 mile west of I-295 in<br />

Topsham, within the northwest tip of Strategy 2A. A second well (i.e., <strong>com</strong>munity<br />

public water-supply system), is located on Jordan Avenue in Brunswick,<br />

approximately 500 feet southwest of Strategy 1. A Source Water Protection Area<br />

associated with this well extends into the eastern portion of Strategy 2B and the<br />

western portions of Strategies 1 and 3.<br />

2.3.4 Floodplains<br />

Information on floodplains and floodways for the transportation strategies was<br />

obtained by reviewing Federal Emergency Management Agency (FEMA) Q3 Flood<br />

Data files for Cumberland County 1996, Sagadahoc County 1997, which were<br />

derived from FEMA Flood Insurance Rate Maps (FIRM) (i.e., Community Panels<br />

2300420010B, 2300420015B, 2301220012B, 2301220016B, and 2301220017B). The Q3<br />

flood dataset provides users with automated flood-risk data that can be used to<br />

locate Special Flood Hazard Areas (SFHA); the risk zones are depicted on hardcopy<br />

FIRM. According to the Q3 mapping, portions of the Study Area are partially located<br />

in a SFHA zone (Figure 2-8).<br />

SFHA Zone A<br />

Zone A is the 1-percent-annual-chance floodplains that are determined in the Flood<br />

Insurance Study by approximate methodologies. No hydraulic analyses or Base<br />

Flood Elevations have been determined for this zone. A small area of Zone A<br />

Existing Conditions 48


floodplains is located in the northeast segment of Strategy 2A. Both the I-295<br />

northbound on-ramp and southbound off-ramp at Exit 31, as well as land currently<br />

being used as a pavement plant, are located in this zone.<br />

SFHA Zone AE<br />

Zone AE is the 1-percent-annual-chance floodplains that are determined in the Flood<br />

Insurance Study by detailed methods of hydraulic analysis. The Zone AE floodplains<br />

associated with several tributaries to the Androscoggin River are located in the Study<br />

Area. The northeast portion of transportation Strategy 1 is impacted by the<br />

floodplains of three perennial streams. On the western portion of Strategy 1, both<br />

sides of US Route 1 are located in a floodplain. A floodplain forest associated with a<br />

perennial stream is located on the southern side and on the north is the<br />

Androscoggin River. Strategy 2A is limited to a perennial stream running along State<br />

Route 196 and Hillcrest Lane. Strategy 2B is associated with two perennial streams,<br />

both of which are located on the north side of Pleasant Street. In several places along<br />

Mill Street, the bank of the Androscoggin River abuts the north side of the road in<br />

Strategy 2C.<br />

2.3.5 Farmland<br />

Information on Important Farmland Soils as defined by the Farmland Protection<br />

Policy Act (FFPA) was retrieved from the NRCS Soil Data Mart for Cumberland and<br />

Sagadahoc Counties. The Soil Data Mart contains current digital mapping and soilunit<br />

attribute information on Prime Farmland and Statewide Important Farmland<br />

soils for the Towns of Brunswick and Topsham. In addition to the data provided by<br />

the NRCS, aerial photography was used to determine the presence or absence of<br />

active farmlands in the Study Area (Figure 2-9).<br />

Prime Farmlands<br />

The NRCS database identifies several areas of prime farmland within the<br />

transportation Strategy 2A Study Area. The largest area occurs in an undeveloped<br />

area northeast of the Topsham Fairgrounds adjacent to State Route 196. Smaller<br />

pockets of prime farmland are located in Topsham along sections of Main Street<br />

north of Mount Ararat High School and along Lewiston Road east and west of I-295.<br />

Farmland of Statewide Importance<br />

Farmland of Statewide Importance is <strong>com</strong>mon among all of the transportationstrategy<br />

study areas. According to the NRCS, all strategy study areas except for the<br />

rail corridor (i.e., Strategy 3) have more than 50 percent of total area in Farmland of<br />

Statewide Importance.<br />

Existing Conditions 49


Areas mapped by the NRCS as Prime Farmland or Farmland of Statewide<br />

Importance in the Study Area consist primarily of industrial, retail, residential<br />

development, forested upland, and wetland habitats. Some areas designated by the<br />

NRCS as farmland based on soil type include waterway and vegetated wetlands and<br />

do not necessarily reflect those areas conducive to agricultural production. However,<br />

a Farmland Conversion Impact Rating may need to be prepared for review by the<br />

NRCS for <strong>com</strong>pliance with the FFPA. This is not expected to be a substantial issue for<br />

the advancement of transportation solutions in the future.<br />

2.3.6 Rare, Threatened, and Endangered Species<br />

A request was sent to the Maine Natural Areas Program (MNAP) to document<br />

whether there are any records of rare species, plants, and/or rare or exemplary<br />

natural <strong>com</strong>munities or ecosystems in the Study Area. A response from the MNAP<br />

and a GIS dataset were received on May 14, 2009. The MNAP concluded that there<br />

were 13 known occurrences (i.e., 3 animals and 10 plants and exemplary<br />

<strong>com</strong>munities) listed in its database, which are categorized in this section and shown<br />

in Figure 2-10.<br />

S1 Rank (Two Hits in the Study Area): Critically imperiled in Maine because of<br />

extreme rarity (i.e., five or fewer occurrences or very few remaining individuals or<br />

acres) or because some aspect of its biology makes it especially vulnerable to<br />

extirpation from the State of Maine. The following rare plants and exemplary natural<br />

<strong>com</strong>munities are known to occur in the Study Area:<br />

sandplain grassland (Little Bluestem)<br />

clothed sedge (Carex vestita)<br />

S2 Rank (Five Hits in the Study Area): Imperiled in Maine because of rarity (i.e., 6 to<br />

20 occurrences or few remaining individuals or acres) or because of other factors<br />

making them vulnerable to further decline. The following rare plants are known to<br />

occur in the Study Area:<br />

Easton’s bur-marigold (Bidens eatonii)<br />

estuary monkey flower (Mimulus ringens var. colpophilus)<br />

dry land sedge (Care siccata) (occurs in two locations)<br />

narrow-leaf arrowhead (Sagittaria filiformis)<br />

S3 Rank (Five Hits in the Study Area): Rare in Maine (i.e., 20 to 100 occurrences).<br />

The following rare plants are known to occur in the Study Area:<br />

spongy arrowhead (Sagittaria calycina var. spongiosa)<br />

Parker’s pipewort (Eriocaulon parkeri)<br />

estuary bur-marigold (Bidens hyperborean)<br />

upland sandpiper (Bartramia longicauda)<br />

Existing Conditions 50


grasshopper sparrow (Ammodramus savannarum)<br />

S4 Rank (One Hit in the Study Area): Apparently secure in Maine:<br />

bald eagle (Haliaeetus leucocephalus)<br />

2.3.7 Wildlife Habitat<br />

Requests were made to Beginning with Habitat (BwH) and the Gulf of Maine Coastal<br />

Program to document areas of significant habitat in the Study Area. A response with<br />

a series of GIS data was received on April 28, 2009. The BwH program maintains<br />

sufficient habitat information to support all native plant and animal species currently<br />

breeding in Maine. The request resulted in the identification of several important<br />

habitat systems: Essential Fish Habitat (i.e., Atlantic salmon), Inland Waterfowl &<br />

Wading Bird Habitat, Upland Sandpiper and Grasshopper Sparrow Habitat, and a<br />

Focus Area of Ecological Significance (i.e., Kennebec Estuary). Transportation<br />

Strategies 1, 2A, and 2C and Rail Strategy 3 occur in these habitat areas, which are<br />

shown in Figure 2-11.<br />

2.3.8 Hazardous Materials<br />

Available databases of known environmental-hazard sites supplied by the Maine<br />

Department of Environmental Protection were reviewed. The review identified<br />

several known locations of remediation sites, hazardous-oil spill sites, registered<br />

petroleum tanks, threats to groundwater and environmental monitoring, and<br />

wastewater outfalls in the Study Area. Threats to groundwater and environmental<br />

monitoring locations include the following:<br />

industrial <strong>com</strong>plexes<br />

Resource Conservation and Recovery Act (RCRA) small- and medium-quantity<br />

generators<br />

underground injection sites<br />

registered petroleum tanks including underground storage tanks for No. 2 fuel<br />

oil, gasoline, and diesel<br />

hazardous-oil spill sites including gasoline, waste oil, motor oil, and diesel<br />

This review revealed numerous potential hazardous-material sites, reflecting the<br />

long history of <strong>com</strong>mercial and industrial sites in the area. In total, the Study Area<br />

was found to contain the following (Figure 2-12):<br />

9 remediation sites<br />

38 hazardous-oil spill sites<br />

30 registered petroleum tanks<br />

37 threats to groundwater and environmental monitoring<br />

Existing Conditions 51


OUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

&/<br />

IVAN HOE DR<br />

IVER RD<br />

&/<br />

MIDDLESEX RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

SAGADAHOC CO<br />

CUMBERLAND CO<br />

XIT-28<br />

NECTOR<br />

RIVER RD<br />

D PORTLAND RD<br />

GREENWOOD RD<br />

&/<br />

AND RO S C O G G<br />

BIBBER PK W Y<br />

&/<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

IVER<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

EMILY ST<br />

") 196 £¤ 201 £¤ 201 ") 123 ") 24 ") 24<br />

RIVER RD<br />

RIVER RD<br />

MARRINER RD<br />

BLUEBERRY LN<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

&/<br />

ROCKY AV<br />

LEWISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

STRATEGY 2B<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

§¨¦295<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

PROSPECT ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FORE ST DR<br />

PATRICIA DR<br />

BICKFORD DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

MILL RD<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

JORDAN AV<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

&/<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

CANAM DR<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

HOSPITAL<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

REPUBLIC AV<br />

MT ARARAT<br />

HIGH SCHOOL<br />

") 196<br />

TOPSHAM<br />

ANNEX<br />

STRATEGY 2A<br />

DAVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

KING RD<br />

TOPSHAM CRSG<br />

P IN E W O O D D R<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

£¤ 1 DRISCOLL<br />

ISLAND<br />

&/<br />

£¤ 1<br />

STRATEGY 2C<br />

BOWDOIN<br />

COLLEGE<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

&/<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BAY PARK DR<br />

STRATEGY 3<br />

OLD TAVERN RD<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

STRATEGY 1<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT R D<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Transportation Strategy Corridor<br />

Study Area<br />

Major Roads<br />

&/<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Public Water Supply Well<br />

Source Water Protection Areas<br />

Community Public Water System<br />

Non-transient Public Water System<br />

Modeled Source Water Protection Area by Type<br />

Sand and Gravel Aquifer Area with 200 Day Travel<br />

Time To Selected Community Water Supply Well<br />

Sand and Gravel Aquifer Area with 2500 Day Travel<br />

Time To Selected Community Water Supply Well<br />

Sand & Gravel Aquifers<br />

Expected yield 10-50 gallons/minute<br />

Expected yield > 50 gallons/minute<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-7<br />

Groundwater Resources<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS, Maine Department of Environmental Protection


HOUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA R<br />

Zone AE<br />

CATHANCE RD<br />

MUDDY RIVER<br />

RIVER RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

RIVER RD<br />

EMILY ST<br />

RIVERVIEW DR<br />

RIVER RD<br />

ROCKY AV<br />

LEWISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

TOPSHAM FAIR MALL RD<br />

") 196 £¤ 201 £¤ 201 123<br />

RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

DAHOC CO<br />

ERLAND CO<br />

Zone AE<br />

AND RO S C O GG<br />

IN R<br />

Zone AE<br />

IVER<br />

BLUEBERRY LN<br />

PARK DR<br />

§¨¦295<br />

Zone A<br />

LEWISTON RD<br />

MALLETT DR<br />

MALLETT DR<br />

ANTHON Y AV<br />

FOR ES T DR<br />

PATRICIA DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

WOOD AV<br />

CAROLYN ST<br />

OLD AUGUSTA RD<br />

BARBARA ST<br />

BARROWS DR<br />

MAIN ST<br />

WILLIAMS DR<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

CANAM DR<br />

HANSON DR<br />

WESTERN AV<br />

MAIN ST<br />

REPUBLIC AV<br />

MT ARARAT<br />

HIGH SCHOOL<br />

") 196<br />

PLEASANT ST<br />

TOPSHAM<br />

ANNEX<br />

MOUNTAIN RD<br />

STRATEGY 2A<br />

VILLAGE DR<br />

COASTAL CONNECTOR<br />

AUDO BO N WAY<br />

KING RD<br />

TOPSHAM CRSG<br />

TEDFORD DR<br />

LOWER ROAD RAILLINE<br />

8<br />

OR<br />

RTLAND RD<br />

NWOOD RD<br />

BIBBER P KW Y<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

Zone AE<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RICIA RD<br />

NANCY DR<br />

PLEASANT ST<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

FRONT ST<br />

SOKOKIS<br />

CIR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

OAK ST<br />

PROSPECT ST<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

BICKFORD DR<br />

WALNUT ST<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

MILL RD<br />

HIGH ST<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

WINTER ST<br />

GARDEN DR<br />

CEDAR ST<br />

GILMAN AV<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

JORDAN AV<br />

MAPLE ST<br />

ELM ST<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

DAVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

P IN E W O OD DR<br />

LORI<br />

DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

MERRYMEETING DR<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

LOVERS LN<br />

MURDER RD<br />

Zone A<br />

Legend<br />

Transportation Strategy Corridor<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Major Roads<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

FEMA Q3 Flood Data<br />

Floodway<br />

100-Year Floodplain<br />

") 196<br />

Zone AE<br />

£¤ 1<br />

MAINE VOCATIONAL<br />

REGION 10<br />

STRATEGY 2B<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

BOWDOIN<br />

COLLEGE<br />

£¤ 1 Zone AE<br />

Zone AE<br />

Zone AE<br />

DRISCOLL<br />

ISLAND<br />

£¤ 1<br />

STRATEGY 2C<br />

BLUEBERRY LN<br />

GROVE ST<br />

Zone A<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

Zone AE<br />

Zone AE<br />

BATH RD<br />

SEAHAWK AV<br />

PEGASUS ST<br />

FORESIDE RD<br />

") 24 BRUNSWICK NAVAL<br />

AIR STATION<br />

") 24<br />

STRATEGY 3<br />

STRATEGY 1<br />

A ST<br />

FITCH ST<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT R D<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

Zone AE<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-8<br />

Floodplains<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS


OUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

RIVER RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

RIVER RD<br />

EMILY ST<br />

RIVERVIEW DR<br />

RIVER RD<br />

ROCKY AV<br />

LEWISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

TOPSHAM FAIR MALL RD<br />

") 196 £¤ 201 £¤ 201 ") 123 ") 24 ") 24<br />

RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

ADAHOC CO<br />

BERLAND CO<br />

AND ROS C O G G<br />

IN R<br />

IVER<br />

BLUEBERRY LN<br />

PARK DR<br />

§¨¦295<br />

LEWISTON RD<br />

MALLETT DR<br />

MALLETT DR<br />

ANTHON Y AV<br />

FOREST DR<br />

PATRICIA DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

WOOD AV<br />

CAROLYN ST<br />

OLD AUGUSTA RD<br />

BARBARA ST<br />

BARROWS DR<br />

MAIN ST<br />

WILLIAMS DR<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

CANAM DR<br />

HANSON DR<br />

WESTERN AV<br />

MAIN ST<br />

REPUBLIC AV<br />

MT ARARAT<br />

HIGH SCHOOL<br />

") 196<br />

PLEASANT ST<br />

TOPSHAM<br />

ANNEX<br />

MOUNTAIN RD<br />

STRATEGY 2A<br />

VILLAGE DR<br />

COASTAL CONNECTOR<br />

AUDO B ON WAY<br />

KING RD<br />

TOPSHAM CRSG<br />

TEDFORD DR<br />

LOWER ROAD RAILLINE<br />

28<br />

TOR<br />

RTLAND RD<br />

ENWOOD RD<br />

BIBBER PK W Y<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PATR I CIA RD<br />

NANCY DR<br />

PLEASANT ST<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

FRONT ST<br />

SOKOKIS<br />

CIR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

OAK ST<br />

PROSPECT ST<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

BICKFORD DR<br />

WALNUT ST<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

MILL RD<br />

HIGH ST<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

WINTER ST<br />

GARDEN DR<br />

CEDAR ST<br />

GILMAN AV<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

GREEN ST<br />

PERKIN S ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

JORDAN AV<br />

ELM ST<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

DAVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

P IN E W O O D D R<br />

LORI<br />

DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

MERRYMEETING DR<br />

BAY PARK DR<br />

OLD TAVERN R D<br />

LOVERS LN<br />

MURDER RD<br />

Legend<br />

Transportation Strategy Corridor<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Major Roads<br />

Insterstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

NRCS Farmland Soils<br />

All areas are prime farmland<br />

Farmland of statewide importance<br />

STRATEGY 2B<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

HOSPITAL<br />

BOWDOIN<br />

COLLEGE<br />

£¤ 1 DRISCOLL<br />

ISLAND<br />

£¤ 1<br />

STRATEGY 2C<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

STRATEGY 3<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

BATH RD<br />

SEAHAWK AV<br />

PEGASUS ST<br />

FORESIDE RD<br />

STRATEGY 1<br />

A ST<br />

FITCH ST<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT RD<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-9<br />

Farmland Soils<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS


OUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

LEWISTON LOWER BRANCH RAILINE<br />

IVER RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

SAGADAHOC CO<br />

CUMBERLAND CO<br />

XIT-28<br />

NECTOR<br />

RIVER RD<br />

D PORTLAND RD<br />

GREENWOOD RD<br />

AND ROS C O G G<br />

BIBBER PK W Y<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

IVER<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

") £¤ 196 201 MT ARARAT<br />

MIDDLE SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

§¨¦295<br />

MT ARARAT<br />

HIGH SCHOOL<br />

Exit 31<br />

STRATEGY 2A<br />

") 196<br />

KING RD<br />

£¤ 201 HILLCREST<br />

LN<br />

DRISCOLL<br />

ISLAND<br />

BOWDOIN<br />

") 24 COLLEGE<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

PARKVIEW<br />

MEMORIAL<br />

") ") 123 24<br />

HOSPITAL<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MCINTOSH<br />

ST<br />

ROCKY AV<br />

BAILEY LN<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

STRATEGY 2B<br />

MARRINER RD<br />

CHURCH RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FORE ST DR<br />

PATRICIA DR<br />

BICKFORD DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

PROSPECT ST<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

MILL RD<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

JORDAN AV<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BLUEBERRY LN<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

P IN E W O O D D R<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

£¤ 1 £¤ 1<br />

STRATEGY 2C<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BAY PARK DR<br />

STRATEGY 3<br />

OLD TAVERN RD<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

STRATEGY 1<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT RD<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Major Roads<br />

Transportation Strategy Corridor<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Rare, Threatened, and Endangered Species<br />

Grasshopper Sparrow & Upland Sandpiper<br />

Bald Eagle Nest Sites<br />

Rare Plants/Exemplary Natural Communities<br />

Clothed Sedge<br />

Dry Land Sedge<br />

Narrow-leaf Arrowhead<br />

Sandplain Grassland<br />

Silver Maple Floodplain Forest<br />

Tidal Spikerush<br />

Eaton's Bur-marigold, Estuary Bur-marigold, Estuary<br />

Monkeyflower, Parker's Pipewort, Spongy Arrow-head<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-10<br />

Rare, Threatened and Endangered<br />

Species<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS, Maine Natural Areas Program


OUSE CROOSING RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

LEWISTON LOWER BRANCH RAILINE<br />

IVER RD<br />

IVAN H OE DR<br />

MIDDLESEX RD<br />

AGADAHOC CO<br />

UMBERLAND CO<br />

XIT-28<br />

ECTOR<br />

RIVER RD<br />

PORTLAND RD<br />

GREENWOOD RD<br />

AND ROS C O GG<br />

BIBBER PK W Y<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

IVER<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

") £¤ 196 201 MT ARARAT<br />

MIDDLE SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

§¨¦295<br />

MT ARARAT<br />

HIGH SCHOOL<br />

Exit 31<br />

STRATEGY 2A<br />

") 196<br />

KING RD<br />

£¤ 201 HILLCREST<br />

LN<br />

DRISCOLL<br />

ISLAND<br />

BOWDOIN<br />

") 24 COLLEGE<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

PARKVIEW<br />

MEMORIAL<br />

") ") 123 24<br />

HOSPITAL<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MCINTOSH<br />

ST<br />

ROCKY AV<br />

BAILEY LN<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

STRATEGY 2B<br />

MARRINER RD<br />

CHURCH RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FOREST DR<br />

PATRICIA DR<br />

BICKFORD DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

PROSPECT ST<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

MILL RD<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

JORDAN AV<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BLUEBERRY LN<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

P IN E W O OD DR<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

£¤ 1 £¤ 1<br />

STRATEGY 2C<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BAY PARK DR<br />

STRATEGY 3<br />

OLD TAVERN R D<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

STRATEGY 1<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

THOMAS POINT RD<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Transportation Strategy Corridor<br />

Study Area<br />

Major Roads<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Wildlife Habitat<br />

Deer Wintering Areas<br />

Shorebird Feeding/Roosting Habitat<br />

Inland Wading Bird/Waterfowl Habitat<br />

Tidal Wading Bird/Waterfowl Habitat<br />

Significant Vernal Pool<br />

Essential Fish Habitat (Atlantic Salmon)<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-11<br />

Wildlife Habitat<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS, Maine Natural Areas Program


The known remediation sites include the following:<br />

Crooker and Sons, Inc., on State Route 196<br />

Maine Recycling, an uncontrolled site on State Route 196<br />

Topsham Municipal Offices at 100 Main Street<br />

Pine State Safety Lines, Inc., at 115 Main Street<br />

BDP Range at Water Street (Androscoggin River Bicycle and Pedestrian Path)<br />

People Plus at 6 Noble Street (Brown Fields Program)<br />

Christy’s #332 at 152 Maine Street<br />

Cressey Motors at 148 Pleasant Street<br />

Former Irving Service Station at 156 Pleasant Street<br />

Most of these sites are likely contained or were previously remediated and do not<br />

pose a threat to the BNAS redevelopment project. However, it is expected that issues<br />

related to hazardous sites will be considered in more detail when acquiring ROW for<br />

any option advanced to the design and construction phases.<br />

2.4 Socioeconomic Resources<br />

This section describes the existing conditions of the socioeconomic resources in the<br />

Study Area. The socioeconomic resources inventoried for this Feasibility Study<br />

include economy and demographics; cultural resources; parklands and recreation;<br />

conservation land; properties that have been acquired or improved under Section 6(f)<br />

of the Land and Water Conservation Fund (LWCF) Act; and properties that may<br />

qualify as a public park or recreation area under Section 4(f) of the National<br />

Department of Transportation Act of 1966.<br />

2.4.1 Economy and Demographics<br />

This subsection discusses employment and demographic data for the Towns of<br />

Topsham and Brunswick and the Brunswick Labor Market Area (LMA). The sources<br />

of data used in preparing this report are as follows, and the information obtained<br />

from these sources is considered reliable:<br />

Understanding the Impact, Closing Naval Air Station Brunswick, prepared in January<br />

2007 by the Maine State Planning Office, includes a Regional Economic Models,<br />

Inc., economic model that forecasts population and employment changes in the<br />

Brunswick LMA as a result of the base closing between 2006 and 2015. 5<br />

Brunswick Naval Air Station, Housing Disposition and Redevelopment Plan, prepared<br />

in August 2009 by Development Synergies LLC and other associated firms for<br />

<br />

5 Regional Economic Models, Inc., produces a dynamic model of the Maine economy at the county level and is used to<br />

forecast the impact of different economic and market changes.<br />

Existing Conditions 57


the MRRA. This report presents information regarding demographic and<br />

housing conditions and trends, including population and household forecasts to<br />

2015 and 2020 as they relate to the disposition of the vacated military housing as<br />

a result of the base closing and the ensuing redevelopment strategy.<br />

New England Economic Partnership prepares a semiannual forecast for<br />

economic conditions for the State of Maine and New England.<br />

Brunswick Naval Air Station Reuse Master Plan, prepared for the Brunswick Local<br />

Redevelopment Authority by the Matrix Design Group in December 2007. The<br />

preliminary business plan and corresponding economic model that forecasted<br />

the redevelopment of the NASB and corresponding employment growth also<br />

were used, which was part of an Economic Development Conveyance<br />

application.<br />

Labor force and employment statistics were obtained from the Maine<br />

Department of Labor. Demographics NOW, a private vendor of demographic<br />

data, provided 2009 population and household estimates and characteristics that<br />

were used in conjunction with decennial census data. Building-permit data and<br />

2006–2008 estimates from the American Community Survey (ACS) were<br />

obtained from the U.S. Census website.<br />

Real-estate sales data were obtained from the assessor’s offices in Brunswick and<br />

Topsham. Listing information was obtained from various Internet sites including<br />

loopnet.<strong>com</strong> and realtor.<strong>com</strong>.<br />

Anecdotal information was obtained from discussions with municipal and<br />

economic-development personnel, as well as real estate brokers and other<br />

professionals.<br />

2.4.1.1 Population Size and Trends<br />

The Town of Brunswick had an estimated population of 21,930 in 2009, representing<br />

a 3.6 percent increase since 2000, which was greater than the 1.3 percent gain<br />

experienced during the 1990s. The Town of Topsham had an estimated population of<br />

9,599 in 2009, which was a 5.5 percent increase since 2000 and also a lower<br />

percentage gain than during the 1990s (i.e., 5.7 percent). The population in the<br />

Brunswick LMA was 69,830 in 2009, which was 3.3 percent greater than in 2000. The<br />

2009 population estimates appear consistent with prior three-year estimates prepared<br />

by the ACS for 2006–2008 and the potential margin of error associated with those<br />

estimates, which are also shown in the table. ACS data for Topsham were not<br />

available.<br />

Existing Conditions 58


2.4.1.2 Household Size and In<strong>com</strong>e<br />

The Town of Brunswick had 8,212 households in 2009 with an average size of 2.4<br />

persons per household. Topsham had 3,825 households in 2009 with an average<br />

household size of 2.46 persons. The region had 28,647 households in 2009 with an<br />

average household size of 2.34 persons per household.<br />

The increase in households since 2000 was nominal (i.e., 0.8 percent) in the Town of<br />

Brunswick, <strong>com</strong>pared to an 11.7 percent increase in Topsham and a 6 percent<br />

increase in the Midcoast Region. However, the average household size in Brunswick<br />

increased by 2.6 percent, whereas a 2.9 percent decline was evident in the region and<br />

a 6.1 percent decline in Topsham. The ACS estimates indicate a smaller average<br />

household size (i.e., 2.19 persons) for Brunswick and a higher number of households<br />

than Demographic NOW’s 2009 estimates; however, the population in households<br />

from both sources is almost identical. 6 Households in the Town of Brunswick<br />

accounted for 28.7 percent of the Brunswick LMA base in 2009, and households in<br />

Topsham accounted for 13.4 percent of the regional base in 2009.<br />

The median household in<strong>com</strong>e in the Town of Brunswick was $50,799 in 2009, an<br />

increase of 26 percent since 2000. In the Midcoast Region, the median household<br />

in<strong>com</strong>e was $51,250 in 2009, approximately 2.7 percent higher than indicated for the<br />

Town of Brunswick. The ACS estimate for 2006–2008 was approximately $3,500 less<br />

than the 2009 median household in<strong>com</strong>e for the Town of Brunswick; the ACS<br />

estimate for the Brunswick LMA was slightly higher. In Topsham, the median<br />

household in<strong>com</strong>e in 2009 was $58,756, reflecting a 22.9 percent increase since 2000.<br />

The distribution of households in 2009 by in<strong>com</strong>e levels in the Town of Brunswick<br />

was fairly similar to that in the Midcoast Region in all in<strong>com</strong>e groups. However,<br />

Brunswick experienced a higher percentage loss in those households in the three<br />

groups earning less than $50,000 and a lower percentage increase in those<br />

households in the two in<strong>com</strong>e groups earning $75,000 or more.<br />

2.4.1.3 Real Estate Market Characteristics<br />

This subsection reviews trends and pricing indicators of residential and <strong>com</strong>mercial<br />

properties (i.e., land and buildings) in the Towns of Brunswick and Topsham. The<br />

analysis is based on available sales data from each town assessors’ office, as well as<br />

available listings of residential and <strong>com</strong>mercial properties for sale and lease.<br />

Annual sales activity of land in the Town of Brunswick ranged between 33 sales in<br />

2008 and 104 sales in 2004. Annual sales activity of land in the Town of Topsham<br />

<br />

6 Increasing the ACS population in households by the margin-of-error figure (i.e., 20,523) and decreasing the<br />

household count by its margin of error (i.e., 8,660 households) results in a larger average household size of 2.7, and<br />

the difference between the two estimates would not be as great. Therefore, the Demographics Now estimates for<br />

2009 appear reasonable.<br />

Existing Conditions 59


anged between 14 sales in 2008 and 41 sales in 2003; transfers of <strong>com</strong>mercial land<br />

ranged between zero sales in 2007 and seven sales in 2005.<br />

Residential Land Activity and<br />

Pricing<br />

Brunswick – Residential Lot Sales<br />

A select sample of residential sales was categorized in 10 different zoning districts in<br />

the Town of Brunswick. Lot pricing from this sample ranged from $25,000 to<br />

$565,000, with the high end influenced by a waterfront setting. The range in median<br />

sale price between the different zoning districts was from $50,000 to $166,000; the<br />

overall median was $85,000. The average value per acre ranged from less than<br />

$20,000 to $138,420, depending on the zoning district; the overall average value per<br />

acre was $58,540.<br />

Topsham – Residential Lot Sales<br />

The selected sample of residential land sales was categorized in four different zoning<br />

districts in the Town of Topsham. Residential lot pricing ranged from $20,000 to<br />

$110,000. The range in median sale prices was from $46,750 to $58,500; the overall<br />

median was $51,750. The average value per acre ranged from $26,450 to $175,890; the<br />

overall average value per acre was $35,730.<br />

Commercial Land Activity and<br />

Pricing<br />

Brunswick – Commercial Land Sales<br />

According to the town’s data, the number of <strong>com</strong>mercial lot sales ranged between<br />

three (2005 and 2009) and eight sales (2004 and 2008). Most of the <strong>com</strong>mercial land<br />

sales were located in the Cooks Corner Commercial District (CCCD), the Portland<br />

Road Area (MU 5), the Church Road Industrial Park (I-2), or the Exit 22 district (I-4);<br />

only a few were in the Outer Pleasant Street (HC1) district.<br />

Fifteen of thirty-four <strong>com</strong>mercial land transactions were between 1 and 2.9 acres, six<br />

were less than 1 acre, and four were between 3 and 4.9 acres. The other nine sales<br />

were in two size categories with 5 acres or more and <strong>com</strong>prised more than 154 acres.<br />

The average sale value was $35,820 per acre; the highest average value was $597,825<br />

per acre. The latter was a representative sale of a 0.46-acre site on Pleasant Street in<br />

2007. The average value of small lots (i.e., less than 1 acre) was $322,570 per acre, and<br />

lots in the CCCD averaged $233,445 per acre, with a high value of $360,000 per acre.<br />

Topsham – Commercial Land Sales<br />

The number of per-year <strong>com</strong>mercial-lot sales in the Town of Topsham ranged<br />

between 12 sales in 2009 and 41 sales in 2003 and 2008, according to the town’s data.<br />

Most of the <strong>com</strong>mercial land sales were located in the Commercial Corridor (CC),<br />

Existing Conditions 60


Lower Village (LV), Mixed Use Commercial (MUC), and Rural Commercial Use<br />

(RCU) zoning districts.<br />

The average lot price of the <strong>com</strong>mercial sales ranged from $5,500 (R3) to $2.3 million<br />

(MUC); the overall average was $666,800. The average price for lots with less than 1<br />

acre ranged from $5,500 to $125,830; the average lot price was $80,070. For lots in the<br />

1- to 2.9-acre group, the average lot price was $451,820 and ranged from $229,000 to<br />

$780,330.<br />

In terms of average value per acre, lot sales in the LV district had the highest overall<br />

average value and highest value per acre of <strong>com</strong>mercial land sales in Topsham (i.e.,<br />

$357,580 per acre and $1.58 million per acre, respectively). The average sale price per<br />

acre of land sales in the Industrial district (i.e., $8,750 per acre), the R-3 district (i.e.,<br />

$12,910 per acre), and the Mixed Use Limited (MUL) district (i.e., $22,300 per acre)<br />

was the lowest price per acre of <strong>com</strong>mercial land sales in Topsham.<br />

2.4.2 Cultural Resources<br />

Cultural resources include both archeological resources and historic aboveground<br />

(i.e., standing structures) resources. Both types of resources are discussed in this<br />

subsection.<br />

Historic properties and archeological resources that are listed in or are eligible for<br />

listing in the NRHP are afforded protection by Section 106 of the National Historic<br />

Preservation Act (NHPA) and Section 4(f) of the National Department of<br />

Transportation Act of 1966.<br />

2.4.2.1 Historic Structures<br />

Study Team members visited the Maine Historic Preservation Commission (MHPC)<br />

office to identify and obtain forms for previously inventoried or NRHP-listed<br />

properties in the Study Area. 7 The Towns of Brunswick and Topsham have not been<br />

<strong>com</strong>prehensively or systematically inventoried, which results in coverage that is<br />

dispersed and in<strong>com</strong>plete. Limited inventory has been conducted in Brunswick; the<br />

most recent survey forms are related to specific review and <strong>com</strong>pliance projects. The<br />

most <strong>com</strong>prehensive inventory was undertaken in the 1980s. The information,<br />

however, was not recorded on the official MHPC inventory forms and is almost<br />

30 years old; therefore, it is not considered officially inventoried by the MHPC. 8 The<br />

most <strong>com</strong>prehensive survey of Topsham was conducted in 1991 but does not appear<br />

<br />

7<br />

Inventory information is arranged by town at the MHPC but is not mapped in a <strong>com</strong>prehensive GIS layer or series of<br />

maps. Thus, although every effort was made to identify every previously inventoried property in the Study Area, some<br />

gaps in the information may exist.<br />

8<br />

Christi Mitchell, MHPC, personal <strong>com</strong>munication, December 7, 2009. These forms were excluded due to their age and<br />

documentation level because buildings have been altered or demolished since that date and because the requirements<br />

for information have been expanded since the 1980s.<br />

Existing Conditions 61


to have covered the entire town. No project-specific inventory was conducted for the<br />

State Route 196 connector. 9<br />

Buildings and structures in the NASB and its satellite facilities in Brunswick and<br />

Topsham were surveyed in 1995–1996 by Louis Berger Associates. 10 A Phase IA<br />

archeological-resource study also was conducted, which is discussed in Subsection<br />

2.4.2.2. The report concluded that only three pre-1946 resources (i.e., three earthcovered<br />

steel magazines from 1943) met the NRHC Criterion C for eligibility. The<br />

remaining pre-1946 resources were not re<strong>com</strong>mended as eligible due to a<br />

demonstrable lack of significance and integrity. A series of buildings and structures<br />

that were not yet 50 years old was re<strong>com</strong>mended as potentially eligible once they<br />

reached the age of 50 years. The facility was subjected to additional historic<br />

architectural and archaeological investigations in the past year. The historic<br />

architectural investigation, which was <strong>com</strong>pleted in May 2010, concluded that only a<br />

series of ammunition magazines were additionally determined eligible for the<br />

National Register of Historic Places. 11 The Phase I archaeological investigations were<br />

<strong>com</strong>pleted in 2009 and 2010; MHPC does not have a final report on that work yet, but<br />

another 15 sites or so were found. The total for both 2009 and 2010 Phase I<br />

investigations was 35 sites, about evenly split between prehistoric and historic. The<br />

earliest prehistoric site is Paleoindian. Most of the historic sites are mid-19 th century.<br />

Of those 35 sites, 27 are potentially NR eligible, and will need Phase II archaeological<br />

work, an NR determination, and maybe other work in advance of construction. All of<br />

the site protection and future work will be incorporated into a Programmatic<br />

Agreement, and a “covenant” that will bind future owners and run with the<br />

property. 12<br />

Mapping of previously inventoried and listed properties was <strong>com</strong>pleted in GIS and<br />

is shown in Figure 2-13. The boundaries of existing NRHP historic districts and<br />

individual properties shown in the figure were based on maps provided in the<br />

respective NRHP nominations. The dates of NRHP listings came from the National<br />

Register Information System of the National Park Service. The location of<br />

individually inventoried properties shown in the same figure was based on U.S.<br />

Geological Survey quadrangles included with the inventory form or through<br />

identification of an approximate location using the address provided on the form.<br />

Table 2.4-1 identifies properties in both Brunswick and Topsham that are listed in the<br />

NRHP. Table 2.4-2 identifies properties that were previously inventoried but not<br />

necessarily evaluated for their NRHP eligibility.<br />

<br />

9<br />

Christi Mitchell, MHPC, personal <strong>com</strong>munication, December 7, 2009.<br />

10 The satellite facilities are the East Brunswick Remote Transmitter Site and the McKeen Housing Complex, Brunswick;<br />

the Topsham Annex, Topsham; and the Survival, Evasion, Resistance, and Escape School in Redington.<br />

11 Kirk Mohney, Deputy State Historic Preservation Officer, MHPC/<strong>com</strong>munication to Rita Walsh, <strong>VHB</strong>, 9-23-2010.<br />

12 Dr. Arthur Spiess, Senior Archaeologist, MHPC/<strong>com</strong>munication to Rita Walsh, <strong>VHB</strong>, 9-23-2010.<br />

Existing Conditions 62


IVER RD<br />

AGADAHOC CO<br />

UMBERLAND CO<br />

XIT-28<br />

ECTOR<br />

RIVER RD<br />

!<br />

PORTLAND RD<br />

GREENWOOD RD<br />

!<br />

") £¤ 196 201 !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

MT ARARAT<br />

MIDDLE SCHOOL !<br />

!<br />

TOPSHAM<br />

!<br />

ANNEX<br />

!<br />

!<br />

§¨¦295<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

MT ARARAT !<br />

HIGH SCHOOL<br />

!<br />

Exit 31<br />

!<br />

!<br />

!<br />

!<br />

!<br />

STRATEGY 2A<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

") 196<br />

!<br />

! !<br />

KING RD<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!!<br />

!<br />

! !<br />

!<br />

! !<br />

!<br />

£¤ 201<br />

§¨¦295<br />

") 196<br />

!<br />

!<br />

!<br />

!<br />

! !<br />

!<br />

DRISCOLL<br />

!<br />

!<br />

!<br />

!<br />

!<br />

ISLAND<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! ! !<br />

!<br />

! ! !<br />

! !<br />

!<br />

! !!!<br />

!<br />

!! !<br />

!<br />

£¤<br />

£¤ 1<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

BOWDOIN<br />

!<br />

!<br />

!<br />

") 24 COLLEGE<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

HILLCREST<br />

!<br />

! LN<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! !! !<br />

! !<br />

!<br />

!<br />

!<br />

£¤ 1<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

BRUNSWICK NAVAL<br />

!<br />

!<br />

AIR STATION<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

! !<br />

! !<br />

!<br />

!<br />

! !<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

!<br />

PARKVIEW !<br />

!<br />

MEMORIAL<br />

!<br />

!<br />

!!<br />

!<br />

!<br />

") 123 HOSPITAL<br />

") 24<br />

AND ROS C O GG<br />

BIBBER PK W Y<br />

RIVER RD<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

OUSE CROOSING RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

IN R<br />

IVER<br />

WOODSIDE RD<br />

IVAN H OE DR<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RI CIA RD<br />

NANCY DR<br />

RIVERVIEW DR<br />

PLEASANT ST<br />

EMILY ST<br />

RIVER RD<br />

RIVER RD<br />

MCINTOSH<br />

ST<br />

ROCKY AV<br />

BAILEY LN<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

STRATEGY 2B<br />

MARRINER RD<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BLUEBERRY LN<br />

CHURCH RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FOREST DR<br />

PATRICIA DR<br />

BICKFORD DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

HENNESSEY AVE<br />

BARIBEAU DR<br />

JESSE RD<br />

A ST<br />

BODWELL ST<br />

COLUMBIA AVE<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

PEARY DR<br />

PROSPECT ST<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

RD<br />

WOODSIDE<br />

ELEM SCHOOL<br />

WOOD AV<br />

CAROLYN ST<br />

WALNUT ST<br />

MILL RD<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

AUGUSTA<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

MAINE ST<br />

CANAM DR<br />

BOODY ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

REPUBLIC AV<br />

MAINE ST<br />

MEADOWBROOK RD<br />

PLEASANT ST<br />

GREEN ST<br />

PERKINS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

JORDAN AV<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

STRATEGY 2C<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

P IN E W O OD DR<br />

LORI<br />

DR<br />

TEDFORD DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

ANDROSCOGGIN RIVER<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

BAY PARK DR<br />

STRATEGY 3<br />

OLD TAVERN R D<br />

BATH RD<br />

CATHANCE RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

!<br />

MIDDLESEX RD<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER RD<br />

STRATEGY 1<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

THOMAS POINT RD<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

MUDDY RIVER<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

!<br />

!<br />

Transportation Strategy Corridor<br />

Study Area<br />

Major Roads<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Hazardous Materials<br />

!<br />

!<br />

! Hazardous Oil Spill Sites<br />

! Waste Water Outfall<br />

!<br />

!<br />

!<br />

Threats to Groundwater and<br />

Environmental Monitoring<br />

! Registered Petroleum Tanks<br />

! Remediation Sites<br />

!<br />

!<br />

!<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-12<br />

Hazardous Materials<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS, Maine Department of Environmental Protection


Table 2.4-1. Properties Listed in the National Register of Historic Places<br />

Town/Address /Location Name Brief Description Designation (Date)<br />

Topsham and Brunswick,<br />

spanning the Androscoggin<br />

River<br />

Androscoggin Swinging<br />

Bridge<br />

1892 wood and steel<br />

pedestrian bridge on<br />

concrete abutments;<br />

partially rebuilt at various<br />

dates in the 20th century<br />

Individually listed in the<br />

NRHP (2004)<br />

Author/Date of<br />

Documentation<br />

Christi Mitchell, MHPC<br />

(2003)<br />

Topsham, roughly bounded by<br />

Main Street, Elm Street, and<br />

Lower Road Rail Line<br />

Topsham Historic District<br />

Mainly early 19th-century<br />

residential area<br />

Historic District listed in the<br />

NRHP (1978)<br />

Steven R. Kaplan and<br />

Frank Beard, MHPC<br />

(1977)<br />

Topsham, Brunswick Falls on<br />

the Androscoggin River<br />

Pejepscot Paper<br />

Company/Topsham Paper<br />

Company<br />

Industrial <strong>com</strong>plex built in<br />

1868<br />

Individually listed in the<br />

NRHP (1974)<br />

Earle G. Shettleworth, Jr.,<br />

MHPC (1973)<br />

Topsham, Topsham County<br />

Fairgrounds, north side of Elm<br />

Street<br />

Topsham Fairgrounds<br />

Grandstand<br />

Ca. 1863 wood<br />

grandstand that has been<br />

enlarged twice<br />

Individually listed in the<br />

NRHP (1992)<br />

Kirk Mohney, MHPC<br />

(1991)<br />

Topsham, 65 Elm Street Purinton Family Farm Four buildings in the early<br />

19th-century farm<br />

<strong>com</strong>plex, which consists<br />

of a house, carriage<br />

house and shop, barn,<br />

and a crib<br />

Brunswick, 4 Oak Street John Dunlap House 1798–1800 Federal-style<br />

house owned by a<br />

prominent Brunswick<br />

citizen<br />

Individually listed in the<br />

NRHP (1989)<br />

Individually listed in the<br />

NRHP (1979)<br />

Sally W. Rand/Kirk<br />

Mohney, MHPC (1989)<br />

with amendments by Dr.<br />

Arthur Spiess,<br />

Archeologist, and Kirk<br />

Mohney, MHPC (1990)<br />

Frank Beard and Robert<br />

Bradley, MHPC (1979)<br />

Brunswick, both sides of Lincoln<br />

Street between Maine and<br />

Union Streets<br />

Lincoln Street Historic<br />

District<br />

Mid-19th-century<br />

residential area<br />

Historic District listed in the<br />

NRHP (1976)<br />

Frank Beard and Steven<br />

Kaplan, MHPC (1975)<br />

Brunswick, 11 Lincoln Street Richardson House 1857 transitional Greek<br />

Revival/Italianate house<br />

built for a successful<br />

master mariner<br />

Individually listed in the<br />

NRHP (1974), also part of<br />

the Lincoln Street Historic<br />

District<br />

William D. Shipman,<br />

Pejepscot Historical<br />

Society (1974)<br />

Brunswick, 27 Pleasant Street<br />

St. Paul’s Episcopal<br />

Church<br />

1845 Gothic Revival<br />

church building designed<br />

by Richard Upjohn<br />

Individually listed in the<br />

NRHP (1978)<br />

Frank Beard and Robert<br />

Bradley, MHPC (1977)<br />

Brunswick, 207 Maine Street First Parish Church 1845 Gothic Revival<br />

church building designed<br />

by Richard Upjohn<br />

Individually listed in the<br />

NRHP (1969)<br />

John Briggs, State Park<br />

and Recreation<br />

Commission (1969)<br />

Brunswick, mainly along<br />

Federal Street and the side<br />

streets between Mason Street<br />

and Bath Road and the<br />

Bowdoin College campus<br />

Federal Street Historic<br />

District<br />

Largely residential area,<br />

except for campus area<br />

on south, with buildings<br />

dating to the late-18th<br />

and 19th and 20th<br />

centuries<br />

Historic District listed in the<br />

NRHP (1976)<br />

Earle G. Shettleworth, Jr.<br />

and Frank Beard, MHPC<br />

(1975)<br />

Existing Conditions 64


Town/Address /Location Name Brief Description Designation (Date)<br />

Brunswick, 63 Federal Street<br />

Harriet Beecher Stowe<br />

House<br />

c. 1807 house in which<br />

Harriet Beecher Stowe<br />

resided from 1850 to<br />

1852 and wrote Uncle<br />

Tom’s Cabin<br />

National Historic Landmark<br />

(1966); also part of Federal<br />

Street Historic District<br />

Author/Date of<br />

Documentation<br />

Polly Rettig, Landmark<br />

Review Project (1976),<br />

and J. Walter Coleman<br />

(1961)<br />

Brunswick, 75 Federal Street Parker Cleaveland House 1805–1806 Federal-style<br />

house owned by Bowdoin<br />

College professor who is<br />

nationally significant in<br />

contributions to study of<br />

mineralogy<br />

Brunswick, 256 Maine Street Henry Boody House 1849 three-story woodframe<br />

Gothic Revival<br />

cottage<br />

National Historic Landmark<br />

(2000); also part of Federal<br />

Street Historic District<br />

Individually listed in the<br />

NRHP (1975); also part of<br />

the Federal Street Historic<br />

District<br />

Dr. Joanne Kleussendorf,<br />

University of Illinois, and<br />

Kirk Mohney, MHPC<br />

(2000)<br />

Earle G. Shettleworth, Jr.,<br />

MHPC (1974)<br />

Brunswick, south side of Bath<br />

Road<br />

Massachusetts Hall<br />

c. 1802 three-story brick<br />

structure that has been<br />

extensively altered on the<br />

interior but is relatively<br />

intact on the exterior<br />

Individually listed in the<br />

NRHP (1971); also part of<br />

Federal Street Historic<br />

District<br />

John Briggs, Maine State<br />

Parks and Recreation<br />

Commission (1970)<br />

Table 2.4-2. Previously Inventoried Historic Properties<br />

Town/Address /Location Name Brief Description Designation (Date)<br />

Topsham and Brunswick Route<br />

201 spanning the Androscoggin<br />

River<br />

Frank J. Wood Bridge<br />

(Bridge #2016)<br />

1932 Warren metal truss<br />

bridge<br />

Topsham, 15 Summer Street No name provided Federal house with<br />

Queen Anne and<br />

Italianate elements; new<br />

section underneath<br />

Topsham, 17 Summer Street No name provided Small wood Federal cape<br />

with central chimney and<br />

entrance<br />

Topsham, 19 Summer Street No name provided 2½-story side-gable<br />

Federal house with<br />

Italianate elements<br />

Topsham, 19 Summer Street<br />

(rear)<br />

No name provided<br />

Front-gable wood barn<br />

converted to housing;<br />

full-width two-story porch<br />

on front<br />

NRHP-eligible as a<br />

contributing structure to an<br />

eligible industrial district in<br />

the area (district extent not<br />

identified)<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Author/Date of<br />

Documentation<br />

A.G. Lichtenstein and<br />

Associates (1999)<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Existing Conditions 65


Town/Address /Location Name Brief Description Designation (Date)<br />

Topsham, 21 Summer Street No name provided Elaborate wood Queen<br />

Anne house with equally<br />

embellished barn;<br />

Samuel Dunning noted<br />

as architect<br />

Topsham, 23 Summer Street No name provided Small wood Federal cape<br />

with central chimney and<br />

entrance; side-gable ell;<br />

almost identical to 25<br />

Summer Street<br />

Topsham, 25 Summer Street No name provided Small wood Federal cape<br />

with central chimney and<br />

entrance; side-gable ell;<br />

almost identical to 23<br />

Summer Street<br />

Topsham, 27 Summer Street No name provided Front-gable wood house<br />

with center entrance and<br />

wood deck<br />

Topsham, 29 Summer Street No name provided Side-gable wood barn<br />

converted to house;<br />

entrance and small porch<br />

on long side<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Author/Date of<br />

Documentation<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Redlon & Roberts (1991)<br />

Brunswick, 46 Pleasant Street Thomas H. Riley House 1881 wood Queen Anne<br />

house with elaborate<br />

front porch; Fossett &<br />

Stevens noted as<br />

architects<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Redlon & Roberts (1991)<br />

Brunswick, 60 Farley Road<br />

Anderson/Henderson,<br />

current owner<br />

ca. 1920 wood bungalow<br />

with large shed dormer in<br />

front roof slope and<br />

handicapped ramp in<br />

front<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Erik Carson (2004)<br />

Brunswick, 61 Farley Road McDonald, current owner Small mid-20th-century<br />

Cape Cod house with<br />

vinyl siding and side<br />

deck<br />

Brunswick, 68 Farley Road No name provided Small mid-20th-century<br />

Cape Cod house with<br />

masonite siding<br />

Brunswick, 71 Farley Road Laplante, current owner Small one-story camp<br />

building with shingle<br />

siding<br />

Brunswick, 72 Farley Road No name provided Small mid-20th-century<br />

side-gable house with<br />

recent siding and carport<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

Erik Carson (2004)<br />

Erik Carson (2004)<br />

Erik Carson (2004)<br />

Erik Carson (2004)<br />

Existing Conditions 66


Town/Address /Location Name Brief Description Designation (Date)<br />

on side<br />

eligibility marked “not<br />

determined”<br />

Brunswick, 80 Farley Road No name provided Small mid-20th-century<br />

side-gable house with<br />

ornamental concrete<br />

block foundation<br />

Brunswick, 81 Farley Road No name provided Early 20th-century<br />

Foursquare house with<br />

full-width front porch and<br />

shingle siding<br />

Brunswick, 82 Farley Road No name provided Small mid-20th-century<br />

Cape Cod with gambrelroof<br />

garage<br />

Brunswick, 100 Farley Road No name provided Late-19th-century frontgable<br />

house with center<br />

entrance and gable<br />

returns<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Inventoried on MHPC<br />

Historic Building/Structure<br />

Survey Form; NRHP<br />

eligibility marked “not<br />

determined”<br />

Author/Date of<br />

Documentation<br />

Erik Carson (2004)<br />

Erik Carson (2004)<br />

Erik Carson (2004)<br />

Erik Carson (2004)<br />

Designated Districts and<br />

Individual Properties<br />

There are three NRHP districts (i.e., Topsham Historic District in Topsham and Federal<br />

Street and Lincoln Street Historic Districts in Brunswick), five local historic districts in<br />

Topsham, and one Village Review Zone in Brunswick. There are two National Historic<br />

Landmarks in the Federal Street Historic District in Brunswick (i.e., the Parker<br />

Cleaveland House and the Harriet Beecher Stowe House).<br />

Within or adjacent to the strategy study areas are four individually listed properties<br />

in Topsham, none of which are in NRHP districts, and six individually listed<br />

properties in Brunswick, three of which are in NRHP historic districts.<br />

Inventoried Properties<br />

Of the 20 properties documented on inventory forms, only one has been determined<br />

eligible. The Frank J. Wood Bridge was determined eligible as a contributing<br />

<strong>com</strong>ponent of an adjacent industrial district. No information was provided in the<br />

eligibility determination regarding the identity or number of buildings that might be<br />

included in this eligible district, but the NRHP-listed Topsham/Pejepscot Paper<br />

Company on the north side in Topsham and the Cabot Mill (not inventoried or<br />

NRHP-listed) on the south side in Brunswick are assumed to be included. It is<br />

Existing Conditions 67


unclear whether any other additional buildings also may be in the re<strong>com</strong>mendedeligible<br />

industrial district.<br />

The remaining properties were marked “undetermined” for their NRHP status,<br />

which means that they have either not been officially reviewed or more information<br />

is needed to make a final determination.<br />

Local Historic Districts<br />

Both towns have local laws or ordinances that established the local historic districts –<br />

or areas similar in purpose but called by another name – that are in the Study Area.<br />

The boundaries of these areas – a single large area known as the Village Review Zone<br />

in Brunswick and the five separate local historic districts in Topsham – are shown in<br />

Figure 2-13. 13 In Brunswick, the Village Review Zone was created by provisions of<br />

the Zoning Ordinance. This large district includes six separate neighborhoods, some<br />

of which are in NRHP-listed historic districts. 14 The ordinance requires that<br />

development proposals in this downtown section of Brunswick be reviewed and<br />

approved by the Village Review Board or staff. All development proposals are<br />

required to provide information on identified historic features and known<br />

archeological sites on the project site and to mitigate the impact of development on<br />

these features. An application for a Certificate of Appropriateness must be submitted<br />

for any changes to the exterior appearance of the properties in this district, including<br />

new construction, additions, demolition, and any landscape structure such as<br />

sidewalks and retaining walls.<br />

Chapter 225-18 of the Topsham Code establishes a review process for any proposed<br />

exterior alterations, new construction, or demolition of buildings in the five local<br />

historic districts. The review process requires property owners to file an application<br />

to ultimately gain a Certificate of Appropriateness for their proposed work from the<br />

Topsham Historic District Commission. No building or other type of permit can be<br />

issued until the Historic District Commission has reviewed and approved the<br />

Certificate of Appropriateness application. 15<br />

Additional Properties Subject to<br />

Future Inventory<br />

Reconnaissance surveys were conducted in December 2009 and May 2010 to help<br />

identify buildings and areas in the Study Area (specifically focused on the five<br />

subareas) that were older than 45 years. The purpose of this identification effort was<br />

to inform project planners about areas and buildings not yet inventoried or<br />

<br />

13<br />

The five local historic districts in Topsham are the Topsham Historic District, which follows the same boundaries as<br />

the National Register Historic District by the same name; South Elm Street Historic District; Great Mill Island Historic<br />

District; Lower Main Street Historic District; and Lower Winter Street Historic District.<br />

14<br />

The six neighborhoods included in the Village Review District are Franklin/Maple Street, Federal Street, Maine Street,<br />

Mill Street, Northwest Neighborhood, and Pleasant Street. The Village Review District does not include any part of the<br />

Bowdoin College campus.<br />

15<br />

Barba Architecture and Preservation, Design Review Manual: Historic Districts of Topsham, Maine, 2000, p. 8.<br />

Existing Conditions 68


designated that may require documentation on MHPC inventory forms and NRHP<br />

evaluation in the event that some aspects of the project may affect them. These<br />

observations are discussed by strategy study area (i.e., Strategies 1, 2A, 2B, 2C, and 3)<br />

in Chapter 5.<br />

2.4.2.2 Archeological Resources<br />

Under an agreement between the MaineDOT and the MHPC, archeological<br />

assessments and determination of archeological sensitivity are <strong>com</strong>pleted by the<br />

MHPC. The Study Team coordinated with the MHPC to review available<br />

archeological-site records and reports pertinent to the Feasibility Study strategies and<br />

options. The archeological reviews provided herein are based on the data provided<br />

by the MHPC and the results of limited field reviews conducted in 2009 and 2010.<br />

The locations of inventoried prehistoric and historic archeological sites are shown in<br />

Figure 2-13. Generally speaking, these mapped sites are concentrated in the<br />

southeastern portion of the Study Area, near and within the areas potentially affected<br />

by Strategies 1 and 3. A discussion of preliminary findings of archeologically<br />

sensitive areas is presented by strategy.<br />

Strategy 1<br />

In general, previously disturbed lands in this area retain minimal archeological<br />

sensitivity. One exception is the former Merrymeeting Park, a 135-acre site of a<br />

former amusement park, zoo, amphitheater, restaurant, and dance hall that was in<br />

use from 1898 to 1909. No archeological studies concerning investigations at the park<br />

were provided by the MHPC. Further research into previous studies related to the<br />

park should be <strong>com</strong>pleted to determine if archeological features are likely to occur.<br />

Areas not previously disturbed outside of the Merrymeeting Park vicinity also may<br />

contain archeological sensitivity. A 1996 study by Louis Berger Associates indicates<br />

that small upland sites are likely to occur landward of the Androscoggin River in<br />

locations near headwater streams or on wetlands margins.<br />

Strategy 2A<br />

The areas within the existing ROW of State Route 196 and US Route 201 are<br />

considered to have low archeological sensitivity. However, upland settings between<br />

headwater streams within and outside of the existing ROW are considered<br />

archeologically sensitive because of their proximity to potable water and because<br />

they lie within an ecotone <strong>com</strong>posed of both upland and lowland resources in close<br />

association.<br />

Existing Conditions 69


Strategy 2B<br />

Based on field observations, locations of possible archeological sensitivity are<br />

between Westminster Avenue and Pleasant Street and between Paul Street and<br />

Turner Street on back lots. 16 If the proposed work is confined to the existing ROW, no<br />

other archeologically sensitive areas were identified.<br />

Strategy 2C<br />

Areas within existing ROWs are considered to have low archeological sensitivity.<br />

However, archeologically sensitive areas are associated with full-acquisition parcels<br />

or in locations that were not previously disturbed by construction. On fullacquisition<br />

parcels, it is likely that cultural remains may be present because the<br />

location is on the first high terrace adjacent to a major river. Furthermore, if<br />

residential buildings were present historically, the lots may have privies,<br />

foundations, or other structural remnants.<br />

Strategy 3<br />

In general, previously disturbed areas in this Study Area retain minimal<br />

archeological sensitivity. However, a 1996 study by Louis Berger Associates indicates<br />

that several historic and prehistoric archeological sites are present within and<br />

adjacent to the Study Area under consideration for construction of the rail connection<br />

to the redeveloped NASB.<br />

2.4.3 Parklands and Recreation<br />

Parklands and recreational areas are protected by various federal statutes that may<br />

apply to the Feasibility Study if funding is provided by the Federal Highway<br />

Administration (Figure 2-14).<br />

2.4.3.1 Conservation Land<br />

Based on a review of the most recent MEGIS Maine Conservation database (i.e.,<br />

November 10, 2009), published by the Bureau of Parks and Land, a single occurrence<br />

of existing conservation land is found in the Study Area. Specifically, the<br />

Androscoggin River Scenic Area is located in the Strategy 1 Study Area.<br />

<br />

16 Fieldwork was conducted by <strong>VHB</strong> on May 21, 2010.<br />

Existing Conditions 70


2.4.3.2 Section 6(f) LWCF<br />

Properties that have been acquired or improved with LWCF funding are protected<br />

under Section 6(f) of the Land and Water Conservation Fund Act. Two Section 6(f)<br />

properties are located in the Study Area: ID #23-00567 in the Strategy 2C Study Area,<br />

and ID# 23-00365 in the Strategy 2B Study Area. Five additional properties are<br />

located in proximity of a strategy Study Area, as follows:<br />

ID# 23-00567: Androscoggin River Canoe Portage, Mill Street, Brunswick<br />

ID# 23-00365: Recreation Park on Dunning Road, owned by the Town of<br />

Brunswick (Map U15, Lot 65)<br />

ID# 23-00292: Ball field located on 10 Pine Tree Road, owned by the Brunswick<br />

Sewer District (Map 4, Lot 7)<br />

ID# 23-00201: Tennis courts located off McKeen Street, owned by the Town of<br />

Brunswick<br />

ID# 23-00610: Longfellow Playground located at 21 Longfellow Avenue, owned<br />

by the Town of Brunswick<br />

ID# 23-0489AA: Coffin Pond Improvements, River Road, owned by the Town of<br />

Brunswick (Map 16, Lot 4B)<br />

ID# 23-00332: Recreation Area on Foreside Road in Topsham<br />

2.4.3.3 Section 4(f) Recreational Resources<br />

Based on a preliminary field review, at least one recreational resource in the Study<br />

Area may qualify as a parkland or recreational area under Section 4(f) of the National<br />

Department of Transportation Act of 1966. The Androscoggin River Bicycle and<br />

Pedestrian Path is a 2.6-mile paved bicycle and walking path along the Brunswick<br />

side of the Androscoggin River. 17 The trail begins at the end of Water Street and<br />

terminates at a parking lot at the end of Grover Lane.<br />

<br />

17 Androscoggin River access in Brunswick is owned by the MaineDOT (Parcel *U15-123).<br />

Existing Conditions 71


P<br />

USE CROOSING RD<br />

JESSE RD<br />

D<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

LEWISTON LOWER BRANCH RAILINE<br />

RIVER RD<br />

IVAN H OE DR<br />

MIDDLESEX RD<br />

, SAGADAHOC CO<br />

CUMBERLAND CO<br />

EXIT-28<br />

NECTOR<br />

RIVER RD<br />

LD PORTLAND RD<br />

GREENWOOD RD<br />

AND RO S C O GG<br />

BIBBER P K W Y<br />

RIVER RD<br />

IN R<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

IVER<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RICIA RD<br />

NANCY DR<br />

PLEASANT ST<br />

EMILY ST<br />

RIVERVIEW DR<br />

") £¤ 196 201 MT ARARAT<br />

MIDDLE SCHOOL<br />

TOPSHAM<br />

ANNEX<br />

§¨¦295<br />

MT ARARAT<br />

HIGH SCHOOL<br />

Exit 31<br />

STRATEGY 2A<br />

") 196<br />

KING RD<br />

£¤ 201 Topsham<br />

Fairgrounds<br />

Grandstand<br />

HILLCREST<br />

LN<br />

Pejepscot<br />

Purinton<br />

Paper<br />

Family<br />

Frank J. Wood Bridge<br />

Company<br />

Farm<br />

Androscoggin<br />

River Swinging<br />

Bridge<br />

Richardson<br />

House<br />

DRISCOLL<br />

ISLAND<br />

John Dunlap House<br />

Former Site of<br />

Harriet Beecher<br />

Merrymeeting Park<br />

Stowe House<br />

First<br />

Parish<br />

St. Paul's Church<br />

Parker<br />

Episcopal<br />

Cleaveland<br />

Church<br />

House<br />

Massachusetts<br />

Hall<br />

BOWDOIN<br />

Henry<br />

") 24 COLLEGE<br />

Boody<br />

House<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

PARKVIEW<br />

MEMORIAL<br />

") ") 123 24<br />

HOSPITAL<br />

RIVER RD<br />

RIVER RD<br />

MARRINER RD<br />

BLUEBERRY LN<br />

MCINTOSH<br />

ST<br />

ROCKY AV<br />

BAILEY LN<br />

STRATEGY 2B<br />

CHURCH RD<br />

LEWISTON RD<br />

RAYMOND RD<br />

FAYE ST<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

TOPSHAM FAIR MALL RD<br />

HENNESSEY AVE<br />

WINTER ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

PARK DR<br />

FRONT ST<br />

LEWISTON RD<br />

SOKOKIS<br />

CIR<br />

MALLETT DR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

MALLETT DR<br />

OAK ST<br />

PROSPECT ST<br />

ANTHON Y AV<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

FOR E ST DR<br />

PATRICIA DR<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

WOOD AV<br />

BICKFORD DR<br />

CAROLYN ST<br />

WALNUT ST<br />

MILL RD<br />

BARBARA ST<br />

HIGH ST<br />

BARROWS DR<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

OLD AUGUSTA RD<br />

MAIN ST<br />

HANSON DR<br />

WINTER ST<br />

CEDAR ST<br />

WILLIAMS DR<br />

GARDEN DR<br />

GILMAN AV<br />

WESTERN AV<br />

MAIN ST<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

PLEASANT ST<br />

GREEN ST<br />

PERKI N S ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

COASTAL CONNECTOR<br />

JORDAN AV<br />

ELM ST<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBE RLAIN AVE<br />

GARRISON ST<br />

AUDO B ON WAY<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

CANAM DR<br />

REPUBLIC AV<br />

MEADOWBROOK RD<br />

DAVIS ST<br />

BICKFORD RD<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

TOPSHAM CRSG<br />

IN E W O O D D R<br />

LORI<br />

DR<br />

O LD<br />

TEDFORD DR<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

LOWER ROAD RAILLINE<br />

MERRYMEETING DR<br />

£¤ 1 £¤ 1<br />

STRATEGY 2C<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

STRATEGY 3<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

BATH RD<br />

SEAHAWK AV<br />

LOVERS LN<br />

PEGASUS ST<br />

FORESIDE RD<br />

A ST<br />

FITCH ST<br />

MURDER R D<br />

STRATEGY 1<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

THOMA S POINT R D<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

Legend<br />

Major Roads<br />

Transportation Strategy Corridor<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Existing Archaeologocal Resources<br />

Known Historic Archaeological Sites<br />

(Half Kilometer Squares)<br />

Known Prehistoric Archaeological Sites<br />

(Half Kilometer Squares)<br />

BNAS Sensitive Prehistoric<br />

Archaeological Sites<br />

BNAS Sensitive Historic Archaeology Sites<br />

Previously Surveyed Prehistoric Archaeological Sites<br />

Inventoried Historical Resources<br />

National Historic Landmark<br />

Individual NR-Listed<br />

Previously Inventoried<br />

Existing National Register Historic District<br />

Local Historic District<br />

Local Review District<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-13<br />

Cultural Resources<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS


OUSE CROOSIN G RD<br />

JESSE RD<br />

RD<br />

AUGUSTA<br />

CATHANCE RD<br />

MUDDY RIVER<br />

RIVER RD<br />

LEWISTON LOWER BRANCH RAILINE<br />

RIVER RD<br />

EMILY ST<br />

RIVERVIEW DR<br />

RIVER RD<br />

ROCKY AV<br />

LEWISTON RD<br />

Exit 31<br />

RAYMOND RD<br />

FAYE ST<br />

TOPSHAM FAIR MALL RD<br />

") 196 £¤ 201 £¤ 201 ") 123 ") 24 ") 24<br />

IVER RD<br />

IVAN HOE DR<br />

MIDDLESEX RD<br />

SAGADAHOC CO<br />

UMBERLAND CO<br />

AND ROS C O GG<br />

IN R<br />

IVER<br />

BLUEBERRY LN<br />

PARK DR<br />

§¨¦295<br />

LEWISTON RD<br />

MALLETT DR<br />

MALLETT DR<br />

ANTHON Y AV<br />

FORES T DR<br />

PATRICIA DR<br />

WOODSIDE<br />

ELEM SCHOOL<br />

WOOD AV<br />

CAROLYN ST<br />

OLD AUGUSTA RD<br />

BARBARA ST<br />

BARROWS DR<br />

MAIN ST<br />

WILLIAMS DR<br />

MT ARARAT<br />

MIDDLE SCHOOL<br />

CANAM DR<br />

HANSON DR<br />

WESTERN AV<br />

MAIN ST<br />

REPUBLIC AV<br />

MT ARARAT<br />

HIGH SCHOOL<br />

") 196<br />

PLEASANT ST<br />

TOPSHAM<br />

ANNEX<br />

MOUNTAIN RD<br />

VILLAGE DR<br />

COASTAL CONNECTOR<br />

STRATEGY 2A<br />

AUDO B ON WAY<br />

KING RD<br />

TOPSHAM CRSG<br />

TEDFORD DR<br />

LOWER ROAD RAILLINE<br />

XIT-28<br />

ECTOR<br />

PORTLAND RD<br />

GREENWOOD RD<br />

BIBBER P K W Y<br />

RANGE RD<br />

FAIRWAY<br />

DR<br />

INDUSTRIAL PKWY<br />

CHURCH RD<br />

§¨¦295<br />

WOODSIDE RD<br />

LAMB<br />

FARM RD<br />

FOX RUN DR<br />

PAT RIC<br />

IA RD<br />

NANCY DR<br />

PLEASANT ST<br />

RIVER RD<br />

MARRINER RD<br />

MCINTOSH<br />

ST<br />

BAILEY LN<br />

CHURCH RD<br />

GREENLEAF<br />

ST<br />

RIVER RD<br />

PAUL ST<br />

WESTMINSTER AV<br />

BOUCHARD DR<br />

HENNESSEY AVE<br />

WINTE R ST<br />

MIDDLE ST<br />

PLEASANT ST<br />

TURNER ST<br />

BARIBEAU DR<br />

FRONT ST<br />

SOKOKIS<br />

CIR<br />

HIGH ST<br />

A ST<br />

BODWELL ST<br />

MILL ST<br />

STANWOOD ST<br />

ABENAKI DR<br />

OAK ST<br />

PROSPECT ST<br />

BRIDGE ST<br />

MORSE CT<br />

BRIDGE ST<br />

BICKFORD DR<br />

WALNUT ST<br />

MAPLE ST<br />

MILL ST<br />

MCKEEN ST MCKEEN ST<br />

COLUMBIA AVE<br />

PEARY DR<br />

MILL RD<br />

HIGH ST<br />

LOLA ST<br />

CUMBERLAND ST<br />

SPRING ST<br />

BELMONT ST<br />

THOMPSON ST<br />

WINTER ST<br />

GARDEN DR<br />

CEDAR ST<br />

GILMAN AV<br />

HIGHLAND<br />

ST<br />

SUMMER ST<br />

LINCOLN ST<br />

PLEASANT ST<br />

WEYMOUTH ST<br />

PAGE ST<br />

BOODY ST<br />

MAINE ST<br />

WILSON ST<br />

ELM ST<br />

MAIN ST<br />

MAINE ST<br />

BANK ST<br />

NOBLE ST<br />

CENTER<br />

ST<br />

MAINE ST<br />

POTTER ST<br />

WHITTIER ST<br />

BOWDOIN ST<br />

GREEN ST<br />

PERKI NS ST<br />

FRANKLIN ST<br />

SCHOOL ST<br />

FEDERAL ST<br />

COLLEGE ST<br />

SOUTH ST<br />

LONGFELLOW AVE<br />

D<br />

INDUSTRY<br />

RD<br />

WATER ST<br />

MAPLE ST<br />

JORDAN AV<br />

ELM ST<br />

FAIR<br />

CIR<br />

KATHERINE<br />

ST<br />

PINE ST<br />

COASTAL CONNECTOR<br />

MINAT AV<br />

BATH RD<br />

BOWKER ST<br />

HARPSWELL RD<br />

MCLELLAN ST<br />

CHAMBERLAIN AVE<br />

GARRISON ST<br />

DAVIS ST<br />

BICKFORD RD<br />

HILLCREST<br />

LN<br />

GARDEN LN<br />

RIVERVIEW DR<br />

JORDAN AV<br />

WHEELER<br />

PARK<br />

HAWTHORNE ST<br />

POLLARD AVE<br />

WILSON AVE<br />

MIDDLESEX RD<br />

ELAINE<br />

DR<br />

PI NE W O O D D R<br />

LORI<br />

DR<br />

O LD<br />

FARM<br />

RD<br />

WHITE ST<br />

JORDAN AV<br />

ARBOR AV<br />

THOMAS AV<br />

FORESIDE RD<br />

MERRYMEETING DR<br />

BAY PARK DR<br />

OLD TAVERN RD<br />

LOVERS LN<br />

MURDER RD<br />

Legend<br />

Transportation Strategy Corridor<br />

Study Area<br />

BNAS Building Footprints<br />

BNAS Airfield<br />

Major Roads<br />

Interstate 295<br />

Other Principal Arterial<br />

State Roads<br />

Railroad<br />

Parcel Boundary<br />

Stream<br />

Surface Water<br />

Town Boundary<br />

Park Lands (Ball Fields & Recreation Areas)<br />

STRATEGY 2B<br />

£¤ 1 ") 196<br />

MAINE VOCATIONAL<br />

REGION 10<br />

BNAS MCKEEN<br />

ST HOUSING<br />

COMPLEX<br />

BRUNSWICK JR<br />

HIGH SCHOOL<br />

COFFIN<br />

SCHOOL<br />

MACMILLAN DR<br />

STRATEGY 2C<br />

MEADOWBROOK RD<br />

PARKVIEW<br />

MEMORIAL<br />

HOSPITAL<br />

BOWDOIN<br />

COLLEGE<br />

£¤ 1 DRISCOLL<br />

ISLAND<br />

Former Site of<br />

Merrymeeting Park<br />

£¤ 1<br />

BLUEBERRY LN<br />

GROVE ST<br />

JORDAN<br />

ACRES SCHOOL<br />

ANDROSCOGGIN RIVER<br />

ROCKLAND BRANCH RAILINE<br />

PERIMETER RD<br />

COW ISLAND<br />

STRATEGY 3<br />

BRUNSWICK NAVAL<br />

AIR STATION<br />

BATH RD<br />

SEAHAWK AV<br />

PEGASUS ST<br />

FORESIDE RD<br />

STRATEGY 1<br />

A ST<br />

FITCH ST<br />

BATH RD<br />

FORRESTAL DR<br />

INTREPID ST<br />

F<br />

A<br />

R<br />

GURNET RD<br />

STORER RD<br />

LEY RD<br />

CORAL<br />

SEA ST<br />

PERRYMAN DR<br />

GUADALCANAL ST<br />

TOWN OF TOPSHAM, SAGADAHOC<br />

THOMAS POINT R D<br />

INDEPENDENCE DR<br />

WILDWOOD DR<br />

GROVER LN<br />

BATH RD<br />

CO<br />

TOWN OF BRUNSWICK, CUMBERLAND CO<br />

l<br />

0 2,000 4,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 2-14<br />

Park Lands & Recreational Areas<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, MaineDOT Bureau of<br />

Transportation Systems Planning, Maine GIS


3<br />

Future Conditions<br />

3.1 Introduction<br />

This chapter describes the methodologies and procedures used to extend the forecast<br />

of the existing 2009 DHV to the Feasibility Study forecast year 2035 DHV. Trafficvolume<br />

projections for the Study account for both normal background traffic and<br />

redevelopment of the NASB and the Topsham Annex. The forecasting for this Study<br />

is based on historical MaineDOT traffic-volume data, land-use information provided<br />

in the December 2007 Brunswick Naval Air Station Reuse Master Plan and December<br />

2007 Topsham Annex Reuse Master Plan, and employment projections provided in the<br />

January 2010 Review of Employment Estimates for the Redevelopment of Naval Air Station<br />

Brunswick. The following subsections describe the traffic-volume forecasting<br />

procedures used to develop the 2035 DHV networks. Figure 3-1 shows the projected<br />

2035 DHV for Study Area intersections under the No Build Option.<br />

3.2 2035 DHV Forecasting<br />

Traffic growth is a function of the expected land development in the region. To<br />

predict a rate at which traffic can be expected to grow by 2035, the historical trafficgrowth<br />

trends, planned area developments, and future changes to transportationsystem<br />

infrastructure were examined.<br />

Historical traffic-count data published by the MaineDOT suggest that little to no<br />

growth has occurred in the Study Area in the past 10 to 15 years. However, to<br />

account for growth throughout the Midcoast Region that could influence the amount<br />

of pass-through traffic on Study Area roadways, this Feasibility Study assumes a<br />

nominal 0.5 percent annual background growth rate from 2009 to 2030 and a 1.0<br />

percent average annual background growth rate from 2030 to 2035. These annual<br />

growth rates represent a modest overall background growth rate of 17.3 percent for<br />

the 26-year forecast period of 2009–2035.<br />

Future Conditions 74


In addition to background growth, other specific <strong>com</strong>ponents considered in the 2035<br />

DHV forecasting include removal of the existing NASB traffic from the 2009 DHV<br />

network, new traffic generated by planned area developments, and traffic diversion<br />

associated with future roadway-improvement projects. Subsection 3.3.3 describes the<br />

trip-generation evaluation conducted for the reuse of the NASB and the Topsham<br />

Annex. In addition to these reuse plans, forecasting included development of the<br />

Maine Street Station project, which is a 317,000±-square-foot mixed-use development<br />

including residential, office, <strong>com</strong>mercial/retail, hotel, and cinema <strong>com</strong>ponents. The<br />

site is located on the southern edge of downtown Brunswick on Maine Street<br />

between Noble Street and the rail line. Trip-assignment networks for the Maine<br />

Street Station project were obtained from NASB Reuse Master Plan documentation.<br />

The final <strong>com</strong>ponent considered in the forecasting process is the construction of new<br />

local roadway connections that may influence the flow of traffic in the Study Area.<br />

The only roadway improvement in project development is associated with the<br />

Highland Green project in Topsham. The approval of this development requires new<br />

roadway construction. Specifically, Mountain Road will open to through traffic with<br />

the removal of the existing gate that connects Canam Drive and Village Drive. In<br />

addition, Audubon Way will be upgraded from a construction road used only by<br />

service vehicles to a throughway that connects Village Drive and Tedford Road.<br />

The 2035 DHV condition (Figures 3-1 and 3-2) was developed using the following<br />

steps:<br />

Adjust the raw turning-movement counts to reflect the 2009 DHV (30th-highest<br />

hour).<br />

Apply the overall background growth rate of 17.3 percent.<br />

Remove the traffic generated by the existing NASB.<br />

Add the site-generated traffic from the Maine Street Station project.<br />

Add the site-generated traffic from redevelopment of the Topsham Annex.<br />

Add the site-generated traffic from redevelopment of the NASB.<br />

Apply the traffic diversions associated with construction of the Highland Green<br />

roadway improvements.<br />

Future Conditions 75


3.3 NASB and Topsham Annex Trip Estimates<br />

This subsection describes the trip-generation estimates prepared for the reuse of the<br />

NASB and the Topsham Annex and used in development of the 2035 DHV.<br />

3.3.1 NASB Reuse Future Traffic<br />

Trip Generation<br />

The trip-generation estimate for the redevelopment of the NASB was determined<br />

using trip-generation rates published by the Institute of Transportation Engineers<br />

(ITE) in Trip Generation, 18 in conjunction with employment projections provided in<br />

A Review of Employment Estimates for the Redevelopment of Naval Air Station Brunswick<br />

and land-use information provided in the NASB Reuse Master Plan and Topsham<br />

Annex Master Plan. The employment report reviewed historical recovery trends and<br />

rates for other bases in the United States for what are classified as bases in “smaller<br />

regions” and in the “Northeast/US Average.” The report indicates that after<br />

reviewing base-closure recovery rates, as well as employment and population<br />

growth projections for Cumberland County (Maine), potential employment<br />

recovery in the region could range from 2,000 to 6,000 jobs. The report concludes<br />

that for transportation capacity-planning purposes, an estimate of 3,000 jobs is<br />

reasonable for the future year 2030. For Feasibility Study purposes, the 2035<br />

forecast year assumes that 3,000 jobs will be recovered for the NASB.<br />

Table 2 of the employment report provides an anticipated breakdown in jobs by<br />

various market sectors including office, industry, retail, transport, public, and<br />

hotel. Using the same percentage breakdown as shown in the table, the 3,000 jobs<br />

anticipated for the base recovery were proportionately distributed as 1,496 office,<br />

463 industry, 116 retail, 296 transport, 467 public, and 163 hotel jobs and were used<br />

to estimate trip generation. More detailed land-use information identified in the<br />

NASB Reuse Master Plan was used to select ITE Land Use Codes (LUCs) and<br />

associated trip rates. Table 3.3-1 summarizes the ITE LUCs and independent<br />

variables used in the trip-generation estimate for the NASB reuse.<br />

Table 3.3-2 summarizes the projected weekday-evening, peak-hour trip generation<br />

for the redevelopment of the NASB based on the land uses listed in Table 3.3-1.<br />

Because the projection of 3,000 jobs is on the lower end of the projected range for<br />

jobs at the NASB, the raw trip-generation estimate was increased by 25 percent to<br />

provide a slightly more conservative analysis condition. The adjusted tripgeneration<br />

estimate was used in development of the 2035 DHV networks.<br />

<br />

18 Trip Generation, Eighth Edition, ITE, Washington, DC, 2008.<br />

Future Conditions 76


Table 3.3-1. Trip-Generation Land-Use Summary<br />

Employment<br />

ITE LUC<br />

Projections Land Use 1 Independent Variable<br />

General Office (710) Office 1,496 Employees<br />

Light Industrial (110) Industry 117 Employees<br />

Industrial Park (130) Industry 346 Employees<br />

Shopping Center (820) Retail 57,766± Square Feet*<br />

General Aviation (022) Transport 296 Employees<br />

Community Recreation Center (495) Public 32 Employees<br />

High School (530) Public 130 Employees<br />

University/College (550) Public 200 Employees<br />

Library (590) Public 19 Employees<br />

General Office (710) Public 86 Employees<br />

Hotel (310) Hotel 163 Employees<br />

1Source: Review of Employment Estimates for the Redevelopment of Naval Air Station Brunswick, January 2010.<br />

*Shopping Center (retail) estimated by assuming two employees per 1,000 square feet.<br />

Table 3.3-2. Trip-Generation Summary<br />

NASB Redevelopment Site-Generated Trips<br />

(Weekday-Evening Peak-Hour)<br />

Raw Estimate* New Pass By Diverted Link Total<br />

Enter 669 28 23 720<br />

Exit 1,322 28 23 1,373<br />

Total 1,991 56 46 2,093<br />

Adjusted Estimate^ New Pass By Diverted Link Total<br />

Enter 836 35 29 900<br />

Exit 1,653 35 29 1,717<br />

Total 2,489 70 58 2,617<br />

*Raw trip-generation estimate is based on ITE rates and projected land uses.<br />

^Adjusted trip-generation estimate represents the raw estimate increased by 25 percent.<br />

Redevelopment of the NASB is expected to generate a total of 2,617 trips (i.e., 900<br />

entering and 1,717 exiting) during the weekday-evening peak-hour. This projected<br />

trip generation includes effects of three specific trip types: new trips, pass-by trips,<br />

and diverted-link trips. New trips are defined as those whose primary origin or<br />

destination is the redeveloped NASB. New trips are added directly to the roadway<br />

network. Pass-by trips are vehicles that are already on the street system adjacent to<br />

the base area (i.e., Bath Road/Route 24, Harpswell Road/Route 123, and Gurnet<br />

Road/Route 24) and are drawn to the NASB as a result of one of the uses. Pass-by<br />

trips are associated only with <strong>com</strong>mercial and retail land uses. Diverted-link trips are<br />

trips on Study Area roadways (other than those directly adjacent to the NASB) that<br />

require a diversion from one roadway to another to gain access to the redeveloped<br />

base. In addition to these trip types, mixed-use developments generate shared trips<br />

Future Conditions 77


(also known as internal capture). A shared trip is defined as one that goes to more than<br />

one land use on the site.<br />

The number of pass-by, diverted-link, and shared trips was determined based on<br />

information published in ITE’s Trip Generation Handbook. 19 A pass-by rate of 32<br />

percent and a diverted-link rate of 26 percent were applied to the retail-generated<br />

traffic. All other land uses at the redeveloped base area are not expected to generate<br />

pass-by or diverted-link trips. The overall internal-capture rate for the<br />

redevelopment of the NASB is expected to be approximately 6 percent. This<br />

reduction for shared trips is reflected in Table 3.3-2.<br />

Distribution<br />

The directional distribution of the new trips generated by the NASB redevelopment<br />

was based on output from the Gateway I Corridor Travel Demand Model, a review<br />

of the residents-to-workplace flows of surrounding <strong>com</strong>munities, 20 and existing<br />

travel patterns. Table 3.3-3 summarizes the distribution used to assign new trips to<br />

the Study Area roadway network. The distribution of pass-by trips was based on<br />

existing travel demands on the adjacent roadways (i.e., Bath Road/State Route 24,<br />

Harpswell Road/State Route 123, and Gurnet Road/State Route 24). The distribution<br />

of diverted-link trips was based on existing travel demands on US Route 1.<br />

Table 3.3-3. Trip-Distribution Summary<br />

Direction To/From Travel Route Percentage of Trips<br />

North I-295 8.0<br />

Route 24 6.0<br />

Route 201 3.8<br />

River Road 3.0<br />

Old Augusta Road 0.2<br />

South I-295 14.0<br />

Main Street (Topsham) 5.0<br />

Route 24 3.0<br />

Route 123 2.0<br />

East US Route 1 20.0<br />

Bath Road 4.0<br />

West Route 196 9.0<br />

US Route 1 8.0<br />

Other Locations* Local 14.0<br />

Total 100.0<br />

*Origin and destination locations in the Study Area that are not official Study Area roadways.<br />

<br />

19 Trip Generation Handbook, published by the ITE, Washington, DC, March 2001.<br />

20 Source: BNAS Transportation Study Socioeconomic & Real Estate Market Baseline Conditions Brunswick and<br />

Topsham, Maine, prepared by RKG Associates, Inc., December 2009 (draft).<br />

Future Conditions 80


3.3.2 Topsham Annex Reuse Trip Generation<br />

The Town of Topsham officially adopted the Topsham Annex Reuse Master Plan, dated<br />

December 2007, for future planning purposes. The 74-acre property, located along<br />

Canam Drive off Main Street, is anticipated to include a mix of office, <strong>com</strong>mercial,<br />

and light industrial uses. The Business and Community portion of the plan will total<br />

approximately 60,000 to 100,000 square feet of development, of which as much as<br />

70,000 square feet will be the redevelopment of existing buildings on site. The Parks<br />

and Recreation portion of the plan will consist of athletic fields; however, no indoor<br />

facilities or courts are planned. The two residential zones are anticipated to total 245<br />

residential units under a maximum build-out scenario. The 31-acre parcel is planned<br />

to be developed at a density of four residential units per acre; the 15-acre parcel is<br />

planned for eight residential units per acre.<br />

The Topsham Annex Redevelopment Study provided weekday-evening trip-generation<br />

estimates and traffic-volume network assignments for the anticipated redevelopment<br />

program. The redevelopment study indicated that the proposed Topsham Annex<br />

redevelopment will generate approximately 273 trips during the weekday-evening<br />

peak hour (i.e., 99 trips entering and 273 trips exiting). As stated in Section 3.2, these<br />

trips were included in the development of the 2035 DHV networks.<br />

Future Conditions 81


4<br />

Summary of Options<br />

4.1 Introduction<br />

Chapter 4 summarizes the various options identified as potentially achieving the<br />

stated purpose and need of the Transportation Feasibility Study. The evaluation<br />

process includes the No Action Option, which is used as the basis for <strong>com</strong>parison to<br />

each option. The range of multimodal transportation options considered in this<br />

Study includes highway, rail, bicycle, and pedestrian options in Brunswick and<br />

Topsham. In addition, the Study examines the potential effect of travel demand on<br />

Study Area roadways associated with the implementation of various levels of TDM<br />

measures.<br />

The options developed for the Study and described in Sections 4.6 through 4.10 were<br />

conceived based on the five strategies that were provided to the MaineDOT by the<br />

Governor’s Advisory Council and formulated through the previous NASB Reuse<br />

Master Plan study efforts conducted by the MRRA. The five strategies are as follows:<br />

Strategy 1: Provide direct access to US Route 1 from the NASB.<br />

Strategy 2A: Improve mobility along State Route 196 (Coastal Connector) from I-<br />

295 (Exit 31) to US Route 1, including the State Route 196/US Route 201<br />

intersection and US Route 201 north to Old Augusta Road.<br />

Strategy 2B: Improve mobility between I-295 (Exit 28) along Pleasant Street and<br />

Maine Street in Brunswick to State Route 123.<br />

Strategy 2C: Improve mobility along Mill Street from Pleasant Street in<br />

Brunswick to State Route 196.<br />

Strategy 3: Extend the existing rail spur to the NASB.<br />

Sections 4.2 and 4.6 through 4.11 provide general descriptions for each option<br />

considered in this Feasibility Study.<br />

Summary of Options 82


4.2 No Action Option<br />

The No Action Option is essentially the continuation and perpetuation of the existing<br />

conditions and the short<strong>com</strong>ings inherent in the current Study Area roadways,<br />

interchanges, intersections, and transportation system. The No Action Option serves<br />

as a baseline condition for <strong>com</strong>parison to other options.<br />

4.3 Transportation Demand Management<br />

TDM en<strong>com</strong>passes a wide range of strategies designed to change personal travel<br />

behavior, resulting in the reduction of demand for automobile use and the need to<br />

construct additional roadway capacity. This is ac<strong>com</strong>plished through measures that<br />

reduce the number or length of drive-alone trips or that move trips out of peak<br />

roadway-congestion times. TDM measures focus on incentives (or disincentives) to<br />

drivers who drive alone that will encourage them to change their travel behavior to<br />

ride-sharing or the use of other modes of travel.<br />

Given the expressed <strong>com</strong>mitment of the local <strong>com</strong>munities, as well as the<br />

MaineDOT, to a multimodal approach to meeting the area’s transportation needs in<br />

favor of solely relying on the continued construction of new and wider roadways,<br />

TDM actions are presented in this Feasibility Study as not an either /or alternative<br />

but rather actions that should be implemented as aggressively as possible regardless<br />

of other physical modifications to the transportation system that could be<br />

implemented. Following are some examples of TDM measures:<br />

Alternative Work Schedules: This measure allows employees to utilize flex time,<br />

<strong>com</strong>pressed work weeks, staggered work hours, and tele<strong>com</strong>muting. Flex time<br />

and staggered work hours have the effect of shifting some trips outside of peak<br />

congestion periods; <strong>com</strong>pressed work weeks and tele<strong>com</strong>muting have the effect<br />

of eliminating some work trips.<br />

Carpool /Vanpool Programs: In this type of program, a transportation<br />

coordinator works with employees to create carpools and vanpools. Employers<br />

can provide preferential parking for carpool vehicles.<br />

Secure Bicycle Facilities and Associated Amenities: The provision for secure<br />

bicycle-parking facilities and on-site showers and lockers promotes cycling to<br />

work.<br />

Financial Incentives and Parking Costs: These types of measures may call for<br />

higher parking fees for single-occupancy vehicles, reduced parking fees for<br />

carpools and vanpools, transit subsidies (e.g., free or employer-subsidized<br />

monthly passes), and other financial incentives.<br />

Summary of Options 83


Site Walk Access Improvements: This measure examines the difference in<br />

walking time associated with travel to and from the workplace as a result of<br />

work-site access changes. Walking time includes the time to walk from a parking<br />

lot or bus stop to an employee’s actual work site. Walk access time can be<br />

affected by policies such as preferential parking for carpools and vanpools or<br />

through improvements to the work site or area that renders access to public<br />

transit easier.<br />

GOMAINE is an existing <strong>com</strong>muter-connections program and website that is<br />

administered by the Greater Portland Council of Governments and is sponsored by<br />

the MaineDOT and the Maine Turnpike Authority. The website provides access to<br />

healthy, economical, and eco-friendly alternatives to <strong>com</strong>muting in a single-occupant<br />

automobile. The site provides a wealth of information on carpooling, vanpooling,<br />

park ‘n’ rides, trip planning, and ridesharing services. It also provides educational<br />

programs such as the Bicycle Commuter Education Program, which is a program<br />

assisting businesses that want to promote cycling in their organization and assist<br />

cyclists who want to <strong>com</strong>mute by bicycle.<br />

In addition to these existing TDM programs that are currently available to area<br />

<strong>com</strong>muters through GOMAINE, the Towns of Brunswick and Topsham can provide<br />

incentives to encourage employer-based programs through local land-use ordinances<br />

and regulations. For example, the towns could implement a traffic-impact fee system<br />

that would allow each municipality to assess private development projects an impact<br />

fee based on the number of vehicle trips that would be generated by the<br />

development. The incentive <strong>com</strong>es from applying credits to the fee for the<br />

developer’s <strong>com</strong>mitment to various levels of TDM actions.<br />

Aside from impact fees, municipal site plan regulations should encourage pedestrian<br />

and bicyclist mobility through site design (i.e., sidewalks, multiuse paths and trails,<br />

and limiting convenient parking) and by providing amenities such as bicycle storage,<br />

locker rooms, and shower facilities in buildings. Property owners and employers also<br />

should be encouraged to promote ridesharing and the use of public transportation<br />

through postings of maps and other information on internal employee bulletin<br />

boards and <strong>com</strong>pany websites. Employers could also provide employees with<br />

subsidized public-transportation passes.<br />

The criteria used to evaluate TDM measures and a summary of the TDM analysis<br />

results are presented in Chapter 5.<br />

4.4 Bicyclist and Pedestrian Improvements<br />

Bicyclist and pedestrian ac<strong>com</strong>modations are important <strong>com</strong>ponents of the proposed<br />

Build Options. Input from the public process strongly suggests that existing bicyclist<br />

and pedestrian facilities and connections should be improved wherever possible as<br />

Summary of Options 84


part of the Build Options. As a result, all of the Build Options include bicyclist and<br />

pedestrian improvements.<br />

In some instances, the bicyclist and pedestrian improvements are already planned by<br />

the municipalities. The Topsham Bike Path Master Plan includes a number of shareduse<br />

paths that one day will <strong>com</strong>plete a network of paths within the town. Those<br />

future Topsham paths are shown primarily on the Strategy 2A conceptual plans,<br />

which include US Route 201 and State Route 196. The future path locations shown in<br />

the Master Plan were adjusted as appropriate to dovetail with each of the proposed<br />

strategies presented in this Feasibility Study. The bicyclist and pedestrian<br />

improvements shown on the Master Plan figures include the following:<br />

Shared-Use Paths (also known as multimodal paths): These facilities are<br />

envisioned as consisting of 10- to 12-foot-wide paved paths that typically are<br />

separated from the roadways by grass or landscaped areas, or by curb and<br />

railings where space is extremely restricted. The paths typically ac<strong>com</strong>modate<br />

two-way bicyclist and pedestrian use as well as motorized users, such as electric<br />

wheelchairs and emergency and maintenance vehicles; other motorized vehicles<br />

are prohibited. The Androscoggin River Bicycle and Pedestrian Path is an<br />

example of a shared-use path. Proposed shared-use paths are also designated as<br />

“trails.”<br />

Bicycle Lanes: Bicycle lanes typically consist of 4- to 8-foot-wide paved<br />

shoulders adjacent to roadway travel lanes. Bicycle lanes typically are designated<br />

by signs as well as painted bicycle symbols within the roadway shoulders.<br />

Bicycle lanes are not proposed on all roadways. They are suggested where (1)<br />

adequate roadway shoulders support on-road cycling; (2) dedicated shared-use<br />

paths are not proposed; (3) motorist speeds, volumes, and potential conflicts are<br />

conducive to on-road cycling; and (4) they can be installed continuously to link<br />

origins and destinations, including other bicycle routes and paths.<br />

<br />

Sidewalks: Sidewalks are proposed adjacent to the roadway in areas where they<br />

currently exist and/or where land use, traveler origins, and destinations warrant<br />

adding them. Sidewalks are typically at least 5 feet wide and separated from the<br />

roadway by curbing and a grass strip where space is available. Formalizing or<br />

eliminating <strong>com</strong>mercial driveways through access management and enforcement<br />

of driveway-design standards improves pedestrian conditions where sidewalks<br />

pass through <strong>com</strong>mercial zones (e.g., the Pleasant Street corridor in Brunswick).<br />

Crosswalks: Crosswalks are included where appropriate to designate<br />

pedestrian-crossing locations. An effort was made to introduce more crosswalks<br />

at signalized intersections and roundabouts because crosswalks currently are<br />

generally lacking.<br />

Summary of Options 85


4.5 Passenger Rail and Bus Rapid Transit<br />

As traffic congestion and fuel prices increase, the demand for public transportation<br />

will also increase. To meet this demand and to reduce the need to construct new or<br />

wider roadways, the MaineDOT is evaluating options to expand public<br />

transportation opportunities for <strong>com</strong>munities along the I-295 corridor, including the<br />

Brunswick and Topsham. Specifically, the MaineDOT is currently conducting the<br />

Portland North Alternative Modes Transportation Study. The purpose of the study is<br />

to evaluate passenger rail and Bus Rapid Transit (BRT) between Portland and<br />

destinations north of Portland. BRT is a relatively new type of transit mode that<br />

incorporates the flexibility of rubber-tire buses with the speed, capacity, and<br />

operating elements of rail service. BRT vehicles can run in either their own dedicated<br />

rights-of-way or on roadways mixed with other traffic.<br />

It had been hoped that the Portland North Alternative Modes Transportation Study<br />

would have been <strong>com</strong>pleted and the findings presented in time for inclusion in this<br />

Feasibility Study. The current schedule calls for the findings to be presented by the<br />

end of 2010, but not in time for inclusion in this study. Nevertheless, whether the<br />

findings point to the expansion of passenger rail or BRT or some <strong>com</strong>bination, the<br />

MaineDOT is <strong>com</strong>mitted to the implementation of multimodal options aimed at<br />

reducing the need to construct new or wider roadways.<br />

4.6 Strategy 1 – Direct Access to US Route 1<br />

Strategy 1 involves evaluating the need and potential locations for improved access<br />

from US Route 1 into the NASB. The Strategy 1 Study Area for connecting US Route<br />

1 to the NASB begins approximately 1.0 mile south of the US Route 1/Cooks Corner<br />

interchange, which connects US Route 1 to State Route 24/Gurnet Road in Brunswick<br />

and extends northerly along US Route 1 for approximately 1.4 miles.<br />

Based on input from the Study Advisory Committee and feedback from the public<br />

workshops and public informational meetings, three Strategy 1 options were<br />

developed to provide a direct connection from US Route 1 to the NASB. Each option<br />

was developed to operate as efficiently as practicable while maintaining safety and<br />

mobility by including adequate ramp geometry and appropriate access controls<br />

along the roadways that connect to the NASB. In addition, <strong>com</strong>ments received at the<br />

public meetings highly favored the inclusion of a new pathway connecting the NASB<br />

to the Androscoggin River Bicycle and Pedestrian Path. Efforts to avoid or minimize<br />

impacts to environmental resources also were considered.<br />

Summary of Options 86


4.6.1 Option 1<br />

Option 1 is a three-leg, T-type interchange with a single structure over US Route 1 to<br />

manage southbound traffic (Figure 4-1). It is typically referred to as a “trumpet”<br />

interchange and is <strong>com</strong>parable<br />

to the existing trumpet<br />

interchange that connects US<br />

Route 1 to the Cooks Corner<br />

exit. The trumpet configuration<br />

favors the heavier<br />

northeast/southwest traffic<br />

movements associated with<br />

entering and exiting the NASB.<br />

Option 1 is located<br />

approximately 0.6 mile south<br />

of the Cooks Corner<br />

interchange and connects directly to the NASB via a two-lane median-divided access<br />

road. The proposed NASB access road extends southerly from US Route 1 for a total<br />

of 0.6 mile. It passes over US Route 1 and under the proposed rail and highway<br />

bridges that would carry the Rockland Branch Railroad and State Route 24 (Bath<br />

Road) over the access road before entering the base. Reconstruction of a 0.1-mile<br />

segment of State Route 24 and the Rockland Branch Railroad (located approximately<br />

0.65 mile southwest of Cooks Corner) is necessary to ac<strong>com</strong>modate construction of<br />

these new bridges. Access to and from US Route 1 and the access road is via freeflow,<br />

single-lane freeway ramps with acceleration and deceleration lanes to allow<br />

safe access to and egress from US Route 1. Due to the proximity of the existing Cooks<br />

Corner interchange and the proposed Option 1 interchange, auxiliary lanes between<br />

these interchanges that connect the respective northbound and southbound on- and<br />

off-ramps are also included to allow for improved traffic operations and safe<br />

weaving of vehicles as they enter or exit US Route 1 between the two interchanges. In<br />

addition, the existing at-grade driveway intersections connecting the now or<br />

formerly (N/F) Ormsby and Town of Brunswick properties with the southbound<br />

lane of US Route 1 are impacted by the Option 1 interchange configuration, requiring<br />

both driveways to be closed to traffic for safety reasons.<br />

Option 1 also requires reconstruction and relocation of portions of the existing<br />

Androscoggin River Bicycle and Pedestrian Path located adjacent to the southbound<br />

lane of US Route 1. As shown in Figure 4-1, the pathway is relocated to the north,<br />

away from US Route 1, and adjacent to the outside of the trumpet interchange<br />

southbound on-ramp to maintain the north–south continuity of the existing bicycle<br />

and pedestrian path. Comments received at the public meetings highly favored the<br />

inclusion of a new pathway connecting NASB to the Androscoggin River Bicycle and<br />

Pedestrian Path. In Option 1, the proposed path extends from NASB, adjacent to the<br />

south side of the access road; overpasses the northbound off-ramp on a new bridge;<br />

Summary of Options 87


and then overpasses US Route 1 adjacent to the new access-road bridge and loop to<br />

join the Androscoggin River Bicycle and Pedestrian Path.<br />

Option 1 includes construction of 0.6 mile of NASB access road; 0.6 mile of<br />

interchange ramps; 0.1 mile of State Route 24 (Bath Road) reconstruction; 0.6 miles of<br />

auxiliary lanes along US Route 1; three bridges (i.e., over US Route 1, the Rockland<br />

Branch Railroad over the access road, and Bath Road over the access road); 0.4 mile<br />

of retaining walls; and 1.2 miles of multiuse path.<br />

4.6.2 Option 2<br />

Option 2 also is a three-leg interchange, configured such that the southbound leftturn<br />

ramp traffic and the US Route 1 through traffic meet at a <strong>com</strong>mon position<br />

where two structures create three<br />

levels of roadway. This interchange,<br />

shown in Figure 4-2, is often<br />

referred to as a simple “flyover”<br />

type interchange. It is <strong>com</strong>parable to<br />

the existing flyover interchange that<br />

connects US Route 1 to the Coastal<br />

Connector/State Route 196. In<br />

general, this configuration allows<br />

for more improved directional<br />

traffic-flow characteristics than<br />

Option 1. The <strong>com</strong>bination of long curved bridges and retaining walls for the<br />

southbound traffic movements allows the interchange footprint to be more<br />

<strong>com</strong>pressed and to reduce impacts to resources and properties along the southbound<br />

lane. Option 2 is located approximately 0.6 mile south of the Cooks Corner<br />

interchange and connects directly to the NASB via a four-lane, median-divided<br />

access road. Access to and from US Route 1 and the access road is via free-flow,<br />

single-lane freeway ramps with acceleration and deceleration lanes to allow safe<br />

access to and egress from US Route 1.<br />

The development of a four-lane access road ac<strong>com</strong>modates the free-flow<br />

characteristics of each interchange ramp. For this option, the proposed NASB access<br />

road begins approximately 0.1 mile south of Bath Road and extends northerly for 0.3<br />

mile under the proposed rail and highway bridges that would carry the Rockland<br />

Branch Railroad and Bath Road over the access road before entering the base<br />

property. Reconstruction of 0.1-mile segments of Bath Road and the Rockland Branch<br />

Railroad approximately 0.65 mile southwest of Cooks Corner is necessary to<br />

ac<strong>com</strong>modate construction of these new bridges. Due to the proximity of the existing<br />

Cooks Corner interchange and the proposed Option 1 interchange, auxiliary lanes<br />

between these interchanges that connect the respective northbound and southbound<br />

on- and off-ramps also are included to allow for improved traffic operations and safe<br />

weaving of vehicles as they enter or exit US Route 1 between the two interchanges. In<br />

Summary of Options 88


addition, the existing at-grade driveway intersections connecting the N/F Ormsby<br />

and Town of Brunswick properties to the southbound lane of US Route 1 are<br />

impacted by the Option 2 interchange configuration, requiring both driveways to be<br />

closed to traffic for safety reasons.<br />

Option 2 also requires reconstruction and relocation of portions of the existing<br />

Androscoggin River Bicycle and Pedestrian Path located adjacent to the southbound<br />

lane of US Route 1. As shown in Figure 4-2, the path is relocated to the north, away<br />

from US Route 1, and adjacent to the outside of the southbound interchange ramps to<br />

maintain the north–south continuity of the existing bicyclist and pedestrian path. For<br />

Option 2, the proposed path extends from the NASB, adjacent to the west side of the<br />

access road; overpasses the northbound off-ramp on a new bridge; and then<br />

overpasses US Route 1 adjacent to the new southbound off-ramp bridge over US<br />

Route 1, joining the reconstructed section of the Androscoggin River Bicycle and<br />

Pedestrian Path.<br />

Option 2 includes construction of 0.3 mile of NASB access road; 0.5 mile of<br />

interchange ramps; 0.1 mile of Bath Road reconstruction; 0.3 miles of auxiliary lanes<br />

along US Route 1; four new bridges (i.e., two over US Route 1, the Rockland Branch<br />

Railroad over the access road, and Bath Road over the access road); 0.3 mile of<br />

retaining walls; and 0.9 mile of multiuse path.<br />

4.6.3 Option 3<br />

Option 3 <strong>com</strong>bines a reconfigured Cooks Corner interchange with a new halfdiamond<br />

interchange that connects directly to the NASB. This type of interchange<br />

(Figure 4-3) is generally referred to as a “split-diamond” interchange. The more<br />

familiar “diamond” interchanges – similar to the I-295 Exit 20 interchange in Freeport<br />

to the south or the I-295 Exit 37 interchange in Bowdoinham to the north – are<br />

created when four one-way ramps join a major highway with free-flow ramp<br />

connections, terminating at two four-way intersections with a singular crossroad.<br />

The Option 3 split-diamond/frontageroad<br />

interchange is essentially an<br />

elongated version of the standard<br />

diamond interchange, with one<br />

additional crossroad bridge and two<br />

frontage roads.<br />

In Option 3, the split-diamond<br />

interchange is configured such that the<br />

proposed northbound and southbound<br />

ramps are split apart and connect to the<br />

existing Cooks Corner crossroad to the east and the new NASB access road to the<br />

west, respectively. The Cooks Corner crossroad and the NASB access road are linked<br />

by one-way frontage roads, approximately 0.20 to 0.25 mile in length and that run<br />

Summary of Options 89


parallel to US Route 1. They terminate opposite the new ramp intersections, creating<br />

two four-way, signalized intersections along the Cooks Corner crossroad and two<br />

four-way, signalized intersections along the proposed NASB access road. At the<br />

easterly Cooks Corner section of the split-diamond interchange, portions of the<br />

existing interchange are rearranged to form an easterly half-diamond interchange<br />

that eliminates the existing southbound on-ramp and requires construction of a new<br />

southbound off-ramp. In Option 3, north of US Route 1, the northbound off-ramp is<br />

eliminated and the northbound on-ramp is retained and reconstructed. The existing<br />

bridge over US Route 1 also is retained and widened to the west to ac<strong>com</strong>modate<br />

two northbound lanes and a single southbound lane. The current design for the<br />

Rockland Branch Railroad grade-crossing and the roadway approach to the Cooks<br />

Corner intersection at State Route 24 is retained and upgraded. By utilizing the<br />

existing Cooks Corner interchange ROW and portions of the existing infrastructure,<br />

the overall construction costs – as well as resource and property impacts – are<br />

reduced for this section of Option 3.<br />

In Option 3, at the westerly end of the proposed split-diamond interchange, the<br />

second crossroad provides direct access to the NASB from US Route 1. The new<br />

NASB access road is located just east of the Merrymeeting Plaza and includes a threelane,<br />

median-divided connector road with one southbound and two northbound<br />

lanes entering and exiting the base, respectively. The access road begins at US Route<br />

1 and extends southerly for a total of 0.4 mile, overpassing the Rockland Branch<br />

Railroad and Bath Road (State Route 24) and aligns parallel to and west of the<br />

existing base access road (i.e., Fitch Road). Both the northbound and southbound<br />

ramps have two lanes with appropriate acceleration and deceleration lanes to<br />

manage the design-year traffic volumes entering and exiting the base.<br />

To manage turning vehicles, the frontage roads connecting the NASB access road<br />

and the Cooks Corner crossroad are two-lane, one-way roadways that are widened at<br />

the southerly and northerly termini of the southbound and northbound frontage<br />

roads, respectively.<br />

The existing at-grade driveway intersections connecting the N/F Ormsby and Town<br />

of Brunswick properties with the southbound lane of US Route 1 are impacted by the<br />

Option 3 interchange configuration, thereby requiring both driveways to be closed to<br />

traffic for safety reasons.<br />

Option 3 also requires reconstruction and relocation of portions of the existing<br />

Androscoggin River Bicycle and Pedestrian Path located adjacent to the southbound<br />

lane of US Route 1. As shown in Figure 4-3, the pathway is relocated to the north,<br />

away from US Route 1, and adjacent to the outside of the split-diamond interchange<br />

ramps and frontage road to maintain the north–south continuity of the existing<br />

bicycle and pedestrian path. In Option 3, the proposed path extends from the NASB,<br />

adjacent to the west side of the NASB access road. Those using the path utilize the<br />

pedestrian phases included in each signal to safely cross the northbound off-ramp<br />

Summary of Options 90


and the southbound on-ramp and then join the reconstructed section of the<br />

Androscoggin River Bicycle and Pedestrian Path.<br />

Option 3 includes construction of 0.4 mile of NASB access road; 1.3 miles of<br />

interchange ramps; 0.5 mile of interchange frontage roads; four new bridges and one<br />

bridge widening (i.e., two over US Route 1, over the Rockland Branch Railroad and<br />

over Bath Road [State Route 24], and over the unnamed brook); 0.4 mile of retaining<br />

walls; and 1.3 miles of multiuse path.<br />

Summary of Options 91


MAP-41<br />

LOT-14E<br />

MAP-41<br />

LOT-14D<br />

MAP-41<br />

LOT-14C<br />

MAP-41 LOT-14<br />

Legend<br />

MAP-40 LOT-7A<br />

Town of Topsham, Maine<br />

MAP-41 LOT-14A<br />

MAP-41<br />

LOT-15A<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Strategy 1 - Direct Access to Base (Option 1)<br />

MAP-U04<br />

LOT-9<br />

MAP-U04 LOT-8<br />

MAP-U04 LOT-14<br />

MAP-U04 LOT-3<br />

Jordan Av<br />

MAP-40 LOT-6<br />

MAP-40 LOT-4<br />

MAP-40 LOT-1<br />

MAP-40 LOT-8<br />

1<br />

£¤ Androscoggin River<br />

MAP-40<br />

LOT-1A<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-5<br />

Town of Brunswick, Maine<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6A<br />

MAP-41<br />

LOT-6B<br />

MAP-41 LOT-6C<br />

Merrymeeting Plaza<br />

Former Site of<br />

Merrymeeting Park<br />

UV 24 £¤ 1<br />

MAP-40 LOT-3<br />

MAP-41 LOT-1<br />

MAP-41<br />

LOT-2B<br />

MAP-41<br />

LOT-5B<br />

MAP-41<br />

LOT-3A MAP-41 LOT-3<br />

MAP-41 LOT-2A<br />

MAP-41<br />

LOT-2 MAP-41 LOT-4<br />

MAP-41 LOT-6<br />

MAP-41 LOT-5<br />

MAP-41 LOT-9<br />

MAP-41 LOT-8A<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8<br />

MAP-41 LOT-11<br />

UV24<br />

MAP-41 LOT-9A<br />

MAP-41 LOT-13D<br />

MAP-CC1 LOT-2<br />

MAP-41 LOT-10<br />

MAP-41<br />

LOT-12<br />

MAP-41<br />

LOT-12A<br />

MAP-CC1<br />

LOT-3<br />

MAP-CC1<br />

LOT-33<br />

MAP-CC1<br />

LOT-34<br />

MAP-41 LOT-13<br />

MAP-41<br />

LOT-13A<br />

MAP-CC1 LOT-6<br />

MAP-41<br />

LOT-15<br />

MAP-CC1<br />

LOT-11<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Path<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass<br />

Proposed ROW<br />

Existing Androscoggin River Multi-Use Path<br />

Lane Lines, Crosswalks<br />

Proposed Retaining Wall<br />

UV 24GURNET RD<br />

BATH RD<br />

Cooks Corner<br />

Shopping Center<br />

MAP-CC1<br />

LOT-31B<br />

l<br />

MAP-CC1<br />

LOT-31<br />

PERIMETER ROAD<br />

0 500 1,000 Feet<br />

MAP- LOT-<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-1<br />

Strategy 1, Option 1<br />

Trumpet/Loop Interchange<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Hanger #6


MAP-41<br />

LOT-14E<br />

MAP-41<br />

LOT-14D<br />

MAP-41<br />

LOT-14C<br />

MAP-41 LOT-14<br />

Legend<br />

MAP-40 LOT-7A<br />

Town of Topsham, Maine<br />

MAP-41 LOT-14A<br />

MAP-41<br />

LOT-15A<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Strategy 1 - Direct Access to Base (Option 2)<br />

MAP-U04<br />

LOT-9<br />

MAP-40 LOT-6<br />

Town of Brunswick, Maine<br />

1<br />

£¤ Androscoggin River<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6A<br />

MAP-41<br />

LOT-6B<br />

MAP-41 LOT-6C<br />

Former Site of<br />

Merrymeeting Park<br />

MAP-41 LOT-9A<br />

MAP-41<br />

LOT-12A<br />

MAP-41 LOT-13<br />

MAP-41<br />

LOT-15<br />

£¤ 1<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Sidewalk<br />

Proposed Path<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass<br />

MAP-U04 LOT-8<br />

MAP-U04 LOT-14<br />

MAP-U04 LOT-3<br />

Jordan Av<br />

MAP-40 LOT-4<br />

MAP-40 LOT-1<br />

MAP-40 LOT-8<br />

MAP-40<br />

LOT-1A<br />

UV24<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-5<br />

MAP-40 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-1<br />

MAP-41<br />

LOT-2B<br />

MAP-41<br />

LOT-5B<br />

MAP-41<br />

LOT-3A MAP-41 LOT-3<br />

MAP-41 LOT-2A<br />

MAP-41<br />

LOT-2 MAP-41 LOT-4<br />

MAP-41 LOT-6<br />

MAP-41 LOT-5<br />

MAP-41 LOT-9<br />

Merrymeeting Plaza<br />

MAP-41 LOT-8A<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8<br />

MAP-41 LOT-11<br />

UV24<br />

MAP-41 LOT-13D<br />

MAP-CC1 LOT-2<br />

MAP-41 LOT-10<br />

MAP-41<br />

LOT-12<br />

MAP-CC1<br />

LOT-3<br />

MAP-CC1<br />

LOT-33<br />

MAP-41<br />

LOT-13A<br />

MAP-CC1 LOT-6<br />

MAP-CC1<br />

LOT-34<br />

MAP-CC1<br />

LOT-11<br />

Paint Stripe<br />

Proposed ROW<br />

Lane Lines, Crosswalk<br />

Proposed Retaining Wall<br />

Existing Androscoggin River Multi-Use Path<br />

UV24GURNET RD<br />

BATH RD<br />

Cooks Corner<br />

Shopping Center<br />

MAP-CC1<br />

LOT-31B<br />

l<br />

MAP-CC1<br />

LOT-31<br />

PERIMETER ROAD<br />

0 500 1,000 Feet<br />

MAP- LOT-<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-2<br />

Strategy 1, Option 2<br />

Flyover Interchange<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Hanger #6


MAP-41<br />

LOT-17B<br />

MAP-44<br />

LOT-1<br />

MAP-44<br />

LOT-4E<br />

MAP-41<br />

LOT-14<br />

MAP-41<br />

LOT-20<br />

MAP-41<br />

LOT-16A<br />

MAP-44<br />

LOT-4D<br />

MAP-41<br />

LOT-17C<br />

MAP-44 LOT-4<br />

MAP-41 LOT-14A<br />

MAP-41<br />

LOT-16<br />

MAP-41<br />

LOT-17<br />

MAP-41 LOT-23A<br />

Town of Topsham, Maine<br />

MAP-41<br />

LOT-15A<br />

MAP-41<br />

LOT-19<br />

Town of Brunswick, Maine<br />

1<br />

£¤ Androscoggin River<br />

MAP-40 LOT-6<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6A<br />

MAP-41<br />

LOT-6B<br />

MAP-41 LOT-6C<br />

MAP-41 LOT-9A<br />

S<br />

MAP-41<br />

LOT-12A<br />

MAP-41 LOT-13<br />

MAP-41 LOT-15<br />

S<br />

£¤ 1<br />

MAP-41 LOT-18<br />

MAP-40 LOT-4<br />

MAP-40<br />

LOT-1A<br />

UV24<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-5<br />

MAP-40 LOT-8<br />

MAP-40 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-1<br />

MAP-41<br />

LOT-2B<br />

MAP-41<br />

LOT-5B<br />

MAP-41<br />

LOT-3A MAP-41 LOT-3<br />

MAP-41 LOT-2A<br />

MAP-41<br />

LOT-2 MAP-41 LOT-4<br />

MAP-41 LOT-6<br />

MAP-41 LOT-5<br />

BATH RD<br />

MAP-41 LOT-9<br />

MAP-41 LOT-8A<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8<br />

MAP-41 LOT-11<br />

UV24<br />

MAP-41 LOT-13D<br />

S<br />

MAP-CC1 LOT-2<br />

MAP-41 LOT-10<br />

MAP-41<br />

LOT-12<br />

MAP-CC1<br />

LOT-3<br />

MAP-CC1<br />

LOT-33<br />

MAP-41<br />

LOT-13A<br />

MAP-CC1 LOT-6<br />

MAP-CC1<br />

LOT-34<br />

S<br />

MAP-CC1<br />

LOT-31B<br />

UV24GURNET RD<br />

MAP-CC1<br />

LOT-28<br />

MAP-CC1<br />

LOT-29A<br />

BATH RD<br />

FARLEY RD<br />

THOMAS POINT RD<br />

MAP-CC1<br />

LOT-27<br />

MAP-CC1<br />

LOT-42<br />

MAP-CC1<br />

LOT-26<br />

MAP-CC2<br />

LOT-51<br />

MAP-CC2 LOT-36<br />

MAP-CC2 LOT-37<br />

MAP-CC2<br />

LOT-38<br />

MAP-CC2 LOT-40<br />

MAP-CC2<br />

LOT-47<br />

MAP-CC2 LOT-41<br />

MAP-CC2<br />

LOT-16<br />

MAP-CC2<br />

LOT-20<br />

PERIMETER ROAD<br />

MAP-CC1<br />

LOT-31A<br />

MAP-CC1<br />

LOT-31<br />

MAP-41<br />

LOT-21<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

MAP-CC2 LOT-50<br />

MAP-CC2<br />

LOT-48<br />

Strategy 1 - Direct Access to Base (Option 3)<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Path<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass<br />

MAP-CC1<br />

LOT-11<br />

MAP-CC2<br />

LOT-1A<br />

MAP-CC2<br />

LOT-1<br />

MAP-CC1<br />

LOT-21<br />

MAP-CC1<br />

LOT-38<br />

MAP-CC2<br />

LOT-3<br />

MAP-CC2<br />

LOT-2<br />

MAP-CC2<br />

LOT-4<br />

MAP-CC2<br />

LOT-8<br />

MAP-CC2 LOT-9<br />

MAP-CC2<br />

LOT-7<br />

MAP-CC1<br />

LOT-25<br />

MAP-CC2<br />

LOT-7A<br />

MAP-CC2<br />

LOT-27<br />

MAP-CC2<br />

LOT-46<br />

MAP-CC2 LOT-11<br />

MAP-CC2<br />

LOT-23<br />

MAP-CC2<br />

LOT-22<br />

MAP-CC2<br />

LOT-42<br />

MAP-42 LOT-2<br />

MAP-42<br />

LOT-5A<br />

S<br />

Proposed ROW<br />

Lane Lines, Crosswalk<br />

Proposed Retaining Wall<br />

Existing Androscoggin River Multi-Use Path<br />

Potential Future Redevelopment Alignment<br />

Pavement Removal Lines<br />

Traffic Signal<br />

MAP-CC1<br />

LOT-39<br />

MAP-CC1<br />

LOT-15<br />

MAP-42<br />

LOT-6<br />

l<br />

MAP-CC1 LOT-30<br />

MAP-CC1<br />

LOT-37<br />

0 500 1,000 Feet<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

MAP- LOT-<br />

MAP-CC1<br />

LOT-41<br />

MAP-42<br />

LOT-32<br />

MAP-CC1<br />

LOT-43<br />

MAP-42 LOT-31<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-3<br />

Strategy 1, Option 3<br />

Frontage Road Interchange<br />

MAP-42<br />

LOT-21<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

MAP-42<br />

LOT-30


4.7 Strategy 2A – Improve Mobility along State<br />

Route 196 and US Route 201<br />

Strategy 2A involves the evaluation of measures to (1) improve vehicular, bicycle,<br />

and pedestrian mobility along State Route 196 (the Coastal Connector) from the I-295<br />

Exit 31 in Topsham to US Route 1 in Brunswick; and (2) reduce congestion at the US<br />

Route 201/State Route 196 intersection. Strategy 2A also includes mobility<br />

enhancement along a section of US Route 201 in the vicinity of the Topsham Annex<br />

and connectivity of US Route 201 to the Coastal Connector, ultimately improving the<br />

linkage to the I-295 interchange at Exit 31.<br />

The Study Area for Strategy 2A en<strong>com</strong>passes the State Route 196 corridor, also<br />

known as the Coastal Connector, east of US Route 201 (Main Street in Topsham) and<br />

Lewiston Road west of Main Street. State Route 196 is classified as a principle-arterial<br />

roadway. The Study Area begins 0.2 mile west of the I-295/State Route 196–Exit 31,<br />

Lewiston Road, interchange in Topsham. It extends easterly for approximately 1.8<br />

miles, crossing the Androscoggin River and ending at the US Route 1 interchange in<br />

Brunswick. The Lewiston Road section of the Study Area is primarily a<br />

<strong>com</strong>mercial/retail zone; the Coastal Connecter section consists of a <strong>com</strong>bination of<br />

both undeveloped land and residential properties. The Study Area also includes a<br />

0.6-mile section of Main Street beginning approximately 0.2 mile south of the I-295<br />

overpass near the Old Augusta Road intersection, extending southerly through the<br />

intersection with the Coastal Connector, and ending approximately 0.1 mile south of<br />

the Main Street/Pleasant Street intersection. Main Street north of State Route 196 is<br />

classified as a major urban-collector roadway; to the south, it is classified as a minor<br />

arterial roadway. In the Study Area, land use along Main Street is a <strong>com</strong>bination of<br />

<strong>com</strong>mercial, retail, and residential properties and includes Mount Ararat High<br />

School. Based on input from the Study Advisory Committee and feedback from the<br />

public workshops and public informational meetings, a total of seven Feasibility<br />

Study options – including two variations each for Options 2 and 3 – were developed,<br />

as follows:<br />

Option 1 evaluates measures to improve traffic operations at the Exit 31<br />

southbound on-ramp at the State Route 196/I-295 interchange.<br />

Options 2A and 2B, 3A and 3B, and 4 consider measures to reduce congestion<br />

and improve mobility at the Main Street/Coastal Connector intersection.<br />

o<br />

Options 2A and 2B evaluate the use of a roundabout at the Main<br />

Street/Coastal Connector intersection. Option 2A also extends the<br />

existing four travel lanes along the Coastal Connector from the Main<br />

Street intersection easterly to match the existing four-lane section at the<br />

signalized intersection of the Coastal Connector and the existing<br />

connector road to State Route 24 (Middlesex Road). Option 2B includes a<br />

roundabout design without widening the Coastal Connector to the east.<br />

Summary of Options 95


o<br />

o<br />

Options 3A and 3B assess the possibility of grade-separating the Main<br />

Street/Coastal Connector intersection by constructing a bridge and an<br />

interchange separating Main Street and Coastal Connector traffic. These<br />

options extend the existing median-divided four-travel lanes along the<br />

Coastal Connector easterly to the existing four lanes at the Connector to<br />

State Route 24 (Middlesex Road) intersection. Options 3A and 3B are<br />

similar in design except for the treatment of the interchange ramp<br />

intersections at Main Street: Option 3A incorporates new signals,<br />

whereas Option 3B integrates single-lane roundabouts.<br />

Option 4 upgrades the existing signalized Main Street/Coastal<br />

Connector intersection and extends the existing four median-divided<br />

lanes along the Coastal Connector easterly to match the existing fourlane<br />

section at the signalized intersection of the Coastal Connector and<br />

connector road to State Route 24/Middlesex Road).<br />

Option 5 evaluates the<br />

enhancement of mobility<br />

along a section of Main<br />

Street in the vicinity of<br />

the Old Augusta<br />

Road/Canam Drive<br />

intersection and the<br />

improved connectivity to<br />

the Topsham Annex.<br />

Option 5 also considers<br />

the longer-term planning<br />

issues involved in<br />

connecting Main Street to Lewiston Road.<br />

4.7.1 Option 1<br />

Option 1 (Figure 4-4) involves the improvement of traffic operations, safety, and<br />

capacity at the intersection of State Route 196 and the Exit 31 southbound on-ramp to<br />

I-295. The improvements include lengthening the existing westbound left-turn lane<br />

on Lewiston Road from approximately 150 to 400 feet and constructing a new signal<br />

at the ramp intersection. The signal has an exclusive left-turn phase to provide<br />

westbound-to-southbound left-turning vehicles a controlled ROW onto I-295 across<br />

the Lewiston Road westbound traffic stream.<br />

Summary of Options 96


4.7.2 Option 2<br />

Option 2 (Figure 4-5) replaces the<br />

existing signal at the Main<br />

Street/Coastal Connector<br />

intersection with a modern two-lane<br />

roundabout. Option 2 also extends<br />

the existing four-lane, mediandivided<br />

Coastal Connector from the<br />

new roundabout easterly 1.0 mile<br />

through the Community<br />

Way/Village Drive intersection to<br />

the existing four-lane, mediandivided<br />

section of the Coastal<br />

Connector at the signalized intersection with the connector to State Route 24 (i.e.,<br />

Middlesex Road).<br />

In Option 2, the existing bicycle–roadway shoulder lanes also are extended along<br />

both sides of the Coastal Connector. Eastbound and westbound right-turn bypass<br />

lanes are added from the Coastal Connector to Main Street, which allow rightturning<br />

traffic to bypass the roundabout and travel southerly and northerly on Main<br />

Street, respectively. North of the roundabout, Main Street is widened to four lanes to<br />

ac<strong>com</strong>modate vehicles exiting and entering the new two-lane roundabout before<br />

transitioning to three lanes; this includes a northbound–southbound lane and a<br />

center two-way left-turn lane. The proposed three-lane section transitions to the<br />

existing two lanes or connects to the Option 5 improvements (described herein) to<br />

the north. Sidewalks are provided along both sides of Main Street, around the<br />

circumference of the roundabout, and along the south side of Lewiston Road to<br />

Horton Place.<br />

Option 2 includes construction of 0.4 mile of roadway along Main Street; 1.0 mile of<br />

the Coastal Connector; a two-lane roundabout; 0.8 mile of sidewalk and 2.0 miles of<br />

bicycle–roadway shoulder; and extension of the existing Coastal Connector bridge<br />

over the Lower Road Rail Line.<br />

4.7.2 Option 2A<br />

Option 2A (Figure 4-6) is essentially the same as Option 2 without extending the<br />

existing four lanes from the Main Street/Coastal Connector intersection easterly to<br />

the connector to State Route 24 (Middlesex Road) intersection. Option 2A replaces<br />

the existing signals at the Main Street/Coastal Connector intersection with a modern<br />

two-lane roundabout. As in Option 2, development of the roundabout design at this<br />

location involves a balance between vehicular use and pedestrian safety, as well as<br />

operational performance and ac<strong>com</strong>modation of oversized vehicles. The four travel<br />

lanes and bicycle–roadway shoulders extend through the roundabout easterly for a<br />

Summary of Options 97


short distance (i.e., 0.1 mile) before transitioning back to the existing two-lane section<br />

along the Coastal Connector. Eastbound and westbound right-turn bypass lanes are<br />

added to the Coastal Connector, allowing right-turning traffic to bypass the<br />

roundabout and travel south and north on Main Street, respectively.<br />

In Option 2A, Main Street south of the roundabout is reconstructed and widened for<br />

approximately 0.1 mile to ac<strong>com</strong>modate the new roundabout before transitioning<br />

back to the existing Main Street cross section at Monument Place. North of the<br />

roundabout, Main Street is widened to four lanes to ac<strong>com</strong>modate vehicles exiting<br />

and entering the new two-lane roundabout before transitioning to three lanes, which<br />

include a northbound–southbound lane and a center two-way left-turn lane. In<br />

Option 2A, the proposed three-lane section transitions to the existing two lanes or<br />

connects to the Option 5 improvements to the north. Sidewalks are provided along<br />

both sides of Main Street, around the circumference of the roundabout, and along the<br />

south side of Lewiston Road to Horton Place.<br />

Option 2A includes construction of 0.4 mile of roadway section along Main Street; 0.2<br />

mile of the Coastal Connector; a two-lane roundabout; and 0.8 mile of sidewalk and<br />

0.2 mile of bicycle–roadway shoulder.<br />

4.7.4 Option 3<br />

Option 3 (Figure 4-7) replaces the existing signalized Main Street/Coastal Connector<br />

intersection with a grade-separated interchange. The proposed design raises the<br />

grade and widens Lewiston Road/Coastal Connector to four lanes, including<br />

bicycle–roadway shoulder lanes<br />

that overpass a widened and<br />

reconstructed Main Street. The<br />

proposed four-lane roadway and<br />

bicycle–roadway shoulder lanewidening<br />

extends easterly<br />

through the reconstructed atgrade<br />

signalized intersection<br />

with Community Way/Village<br />

Drive to the existing four-lane<br />

section at the signalized<br />

connector road/State Route 24 (<br />

Middlesex Road) intersection. New interchange ramps provide free-flow access from<br />

the Coastal Connector to new signalized intersections at Main Street north and south<br />

of the proposed bridge overpass. The grade raise along Lewiston Road and the<br />

Coastal Connector is approximately 0.5 mile in length beginning at the Union<br />

Park/Horton Place intersection with Lewiston Road and ending 0.2 mile west of the<br />

existing Community Way/Village Drive intersection and the Coastal Connector. The<br />

Union Park/Horton Place intersection is reconfigured by extending the existing<br />

raised median westerly and allowing only right turns onto and off of Lewiston Road.<br />

Summary of Options 98


The new interchange with Main Street is configured as an urban half-cloverleaf-type<br />

interchange in which both the eastbound and westbound ramps are located east of<br />

Main Street.<br />

This proposed interchange configuration takes advantage of the topography, existing<br />

cultural resources, and existing roadway infrastructure including Monument Place<br />

and access to Mount Ararat High School. The ramps provide free-flow access to and<br />

from the Coastal Connector before transitioning to a three-lane roadway section,<br />

which includes two travel lanes and a center left-turn lane that allows controlled<br />

access to abutting properties before intersecting with Main Street. In Option 3, Main<br />

Street is widened and reconstructed for approximately 0.6 mile beginning at<br />

approximately 0.1 mile north of Pleasant Street and ending in the vicinity of Forrest<br />

Drive to the north. The widening includes one travel lane in each direction and a<br />

raised-median island that transitions to a left-turn lane (if required) at intersections.<br />

Sidewalks are constructed on both sides of Main Street and along the north side of<br />

the westbound ramps into the Mount Ararat High School <strong>com</strong>plex. The eastbound<br />

ramps intersect Main Street at a new signalized intersection opposite Monument<br />

Place. The westbound ramps intersect Main Street at a new signalized intersection at<br />

the existing entrance to Mount Ararat High School. The high school access shifts to<br />

the east and connects to the westbound ramps. A new connector roadway intersects<br />

opposite the high school, creating the fourth leg of the signalized intersection. The<br />

roadway extends from Main Street westerly and southerly for approximately 0.3<br />

mile, connecting opposite Mallet Drive at its current signalized intersection with<br />

Lewiston Road. In Figure 4-6, a future multiuse trail is shown adjacent to the Coastal<br />

Connector. The proposed interchange ramps provide continuity along the Coastal<br />

Connector corridor and connectivity to adjacent connecting roadways.<br />

Option 3 includes reconstruction of 0.6 mile of Main Street; 1.2 miles of Lewiston<br />

Road/Coastal Connector; 0.5 mile<br />

of ramps and connector roadway;<br />

two signals on Main Street; 1.3<br />

miles of sidewalk and 3.0 miles of<br />

bicycle–roadway shoulder; 0.4<br />

mile of retaining walls; one<br />

bridge over Main Street; two box<br />

culverts crossing unnamed<br />

brooks; and extension of the<br />

Coastal Connector bridge over<br />

the Lower Road Rail Line.<br />

Summary of Options 99


4.7.5 Option 3A<br />

Option 3A (Figure 4-8) is similar to Option 3 except for the treatment of the<br />

interchange-ramp intersections with Main Street. Option 3 incorporates new signals<br />

at each ramp intersection, whereas Option 3A integrates roundabouts at both<br />

intersections. Option 3A replaces the existing signalized Main Street/Coastal<br />

Connector intersection with a grade-separated interchange. The proposed design<br />

raises the grade and widens the Coastal Connector to four lanes, including bicycle–<br />

roadway-shoulder lanes that overpass a widened and reconstructed Main Street. The<br />

four lanes and bicycle–roadway shoulder lane-widening extends easterly through the<br />

reconstructed at-grade signalized intersection with Community Way/Village Drive<br />

to the existing four-lane section at the signalized connector road to the State Route 24<br />

(Middlesex Road) intersection. New interchange ramps provide free-flow access<br />

from the Coastal Connector to single-lane roundabout intersections with Main Street<br />

north and south of the proposed overpass bridge. The grade raise along the Coastal<br />

Connector is approximately 0.5 mile in length. It begins at the intersection of Union<br />

Park and Horton Place with the Coastal Connector and ends 0.2 mile west of the<br />

existing Community Way/Village Drive intersection. The Union Park/Horton Place<br />

intersection is reconfigured by extending the existing raised median westerly and<br />

allowing only right turns onto and off of Lewiston Road.<br />

The new Main Street interchange is configured as an urban half-cloverleaf-type with<br />

both the eastbound and westbound ramps located east of Main Street. This proposed<br />

interchange configuration takes advantage of the topography, existing cultural<br />

resources, and existing roadway infrastructure, including Monument Place and<br />

access to Mount Ararat High School. The ramps provide free-flow access to and from<br />

the Coastal Connector before transitioning to a three-lane roadway section that<br />

includes two travel lanes and a center left-turn lane to control access to abutting<br />

properties before intersecting with new roundabouts at Main Street.<br />

In Option 3A, Main Street is widened and reconstructed for approximately 0.6 mile<br />

beginning at approximately 0.1 mile north of Pleasant Street and ending in the<br />

vicinity of Forest Drive to the north. The widening includes one travel lane in each<br />

direction and a raised-median island that transitions to a left-turn lane (if required) at<br />

intersections. Sidewalks are constructed on both sides of Main Street and along the<br />

north side of the westbound ramps into the Mount Ararat High School <strong>com</strong>plex. The<br />

eastbound ramps intersect Main Street at a new roundabout opposite Monument<br />

Place. The westbound ramps intersect Main Street at a roundabout at the existing<br />

entrance to Mount Ararat High School. The high school access shifts to the east and<br />

connects to the westbound ramps. A new connector roadway intersects the new<br />

roundabout opposite the westbound ramps. The connector extends from Main Street<br />

westerly and southerly approximately 0.3 mile, connecting opposite Mallet Drive at<br />

the current signalized intersection with Lewiston Road. In Figure 4-8, a future<br />

multiuse trail is shown adjacent to the Coastal Connector and the proposed<br />

interchange ramps to provide continuity along the Coastal Connector corridor and<br />

connectivity to adjacent connecting roadways.<br />

Summary of Options 100


Option 3A includes reconstruction of 0.6 mile of Main Street; 1.2 miles of the Coastal<br />

Connector; 0.5 mile of ramps and connector roadway; two single-lane roundabouts<br />

on Main Street; 1.3 miles of sidewalk and 3.0 miles of bicycle–roadway shoulder; 0.4<br />

mile of retaining walls; one bridge over Main Street; two box culverts crossing<br />

unnamed brooks; and extension of the Coastal Connector bridge over the Lower<br />

Road Rail Line.<br />

4.7.6 Option 4<br />

Option 4 (Figure 4-9) extends the<br />

four lanes and bicycle–roadway<br />

shoulder lane that currently exists<br />

along Lewiston Road/Coastal<br />

Connector easterly for<br />

approximately 1.0 mile through the<br />

reconstructed intersection with<br />

Community Way/Village Drive to<br />

the existing four-lane section at the<br />

signalized State Route 24 (Middlesex<br />

Road) intersection.<br />

In Option 4, the existing signalized intersections at Community Way/Village Drive<br />

and the connector road to State Route 24 are upgraded. The south end of the existing<br />

railroad-bridge underpass is lengthened to ac<strong>com</strong>modate the widening of the Coastal<br />

Connector to four lanes.<br />

Option 4 includes construction of 1.0 mile of the Coastal Connector; 2.0 miles of<br />

bicycle–roadway shoulder; two signal upgrades; and extension of the existing<br />

Coastal Connector bridge over the Lower Road Rail Line.<br />

4.7.7 Option 5<br />

Option 5 (Figure 4-10) evaluates the enhancement of mobility along a section of Main<br />

Street in the vicinity of Old Augusta<br />

Road and Canam Drive, as well as<br />

improved connectivity to the Topsham<br />

Annex. Option 5 also considers the<br />

longer-term planning issues in providing<br />

a connection from Main Street to<br />

Lewiston Road. Option 5 can be<br />

constructed as a standalone improvement<br />

or connected to the Options 2, 2A, 3, 3A,<br />

and 4 improvements proposed along<br />

Main Street.<br />

Summary of Options 101


Option 5 widens and reconstructs a 0.5-mile section of Main Street beginning 300 feet<br />

south of the I-295 overpass and ending in the vicinity of Forest Drive. A 0.25-mile<br />

portion of Canam Drive is reconstructed and realigned, and its intersection with<br />

Main Street is relocated approximately 0.2 mile to the north. The Old Augusta Road<br />

intersection with Main Street is terminated and a 0.2-mile segment of Old Augusta<br />

Road is realigned and connected to the relocated Canam Drive. The proposed Main<br />

Street widening includes one travel lane and adjacent shoulders in each direction and<br />

a painted two-way, left-turn lane that transitions to a median-divided, left-turn lane<br />

at the new signalized intersection of Canam Drive. The remaining 0.1-mile segment<br />

of the existing Canam Drive is retained and connected to Main Street at the current<br />

location.<br />

As discussed previously, Option 5 also considers the longer-term planning issues of<br />

providing a connection from Main Street to Lewiston Road opposite Topsham Fair<br />

Mall Drive. The actual layout of the connection between Main Street and Lewiston<br />

Road has not been determined; however, as shown in the dashed line in Figure 4-9,<br />

the future configuration connects to and be<strong>com</strong>es the fourth leg of the new signalized<br />

intersection at Main Street and Canam Drive. It extends southerly generally along the<br />

easterly property of N/F Maine Gravel Service, Inc., and intersecting Lewiston Road<br />

opposite Topsham Fair Mall Drive.<br />

Option 5 includes construction of 0.5 mile of Main Street, 0.25 mile of Canam Drive,<br />

0.2 mile of Old Augusta Road, and a new signal.<br />

Summary of Options 102


Map R05<br />

Lot 41-<br />

UV 196 UV 196<br />

Map R05<br />

Lot 38-<br />

Map R05<br />

Lot 34-<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Map R05<br />

Lot 35-<br />

Map R05<br />

Lot 37-<br />

S<br />

Traffic Signal<br />

S<br />

Map R05<br />

Lot 35-<br />

Map R05<br />

Lot 37-<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Map Lot 0-<br />

§¨¦ 295 §¨¦ 295<br />

l<br />

0 100 200 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-4<br />

Strategy 2A, Option 1<br />

I-295 Exit 31 SB On-Ramp<br />

Signal<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


HORTON PL<br />

REST DR<br />

UV196<br />

ANTHONYAV<br />

201 Map R04<br />

Map R04<br />

Map R04<br />

Lot 27-<br />

Map R04<br />

Map R04<br />

Lot 28-<br />

Lot 17-<br />

£¤<br />

Map<br />

R05A<br />

Lot 5-<br />

Map R05A Lot 3-<br />

Map Map R04<br />

R04 Lot Lot 30-<br />

32-<br />

Map<br />

R04 Lot<br />

Map R05A Lot 2-<br />

31-<br />

Map R04 Lot 45-<br />

Map R05A Lot 1-<br />

Map R04 Lot 18-<br />

Map R05<br />

Lot 92-<br />

COASTAL CONNECTOR<br />

Map U05<br />

Lot 47-<br />

Map U05<br />

Lot 46-<br />

L E W I S T O N R D<br />

Map U22<br />

Lot 3-<br />

Map U22<br />

Lot 4-<br />

Map U22<br />

Lot 8-<br />

Map U22<br />

Lot 28-<br />

Map<br />

U22 Lot<br />

12-<br />

Map<br />

U02A<br />

Lot 72-<br />

Map Map<br />

R05 Lot U02A<br />

16-4<br />

Lot 73-<br />

Map<br />

U02A<br />

Lot 74-<br />

Map<br />

Map<br />

U02A<br />

U22<br />

Lot 75-<br />

Lot 30-<br />

Map<br />

U22<br />

Lot 27-<br />

Map<br />

U22<br />

Lot 2-<br />

Map R05 Lot 11-<br />

CHAD DR<br />

Map U22<br />

Lot 5-<br />

Map U22<br />

Lot 6-<br />

Map U22<br />

Lot 7-<br />

Map<br />

U22 Lot<br />

10-<br />

Map<br />

U22 Lot<br />

11-<br />

UNION PARK RD<br />

PATRICIA DR<br />

Map R04 Lot 34-<br />

Map<br />

R05A<br />

Lot 3-<br />

Map U05<br />

Lot 48-<br />

Map<br />

R04 Lot<br />

33-<br />

Map U05<br />

Lot 42-<br />

CAROLYN ST<br />

Map<br />

U05 Lot<br />

43-<br />

FIFTH ST<br />

FOURTH ST<br />

MONUMENT PL<br />

BARBARA ST<br />

SECOND ST<br />

FIRST ST<br />

Map U05<br />

Lot 4-<br />

Map U02A<br />

Lot 21-<br />

BARROWS DR<br />

Map U02A<br />

Lot 102-<br />

Map<br />

U02A<br />

Lot 103-<br />

Map<br />

U02A Lot<br />

104-<br />

Map<br />

U02A Lot<br />

105-<br />

Map<br />

U02A Lot<br />

106-<br />

Map R04<br />

Lot 21-<br />

Map<br />

U02A<br />

Lot 20-<br />

Map<br />

U02A<br />

Lot 107-<br />

Map<br />

U02A Lot<br />

108-<br />

Map<br />

U02A<br />

Lot 19-<br />

Map<br />

U02A<br />

Lot 15-<br />

Map U02A<br />

Lot 14-<br />

Map U02A<br />

Lot 13-<br />

Map U02A<br />

Lot 12-<br />

Map U02A<br />

Lot 11-<br />

Map U02A<br />

Lot 10-<br />

Map U02A<br />

Lot 9-<br />

EAGLES' WAY<br />

WILLIAMS DR<br />

Map U02A<br />

Lot 8-<br />

Map U05<br />

Lot 44-<br />

Map R04<br />

Lot 25-<br />

Map U05 Lot 44-<br />

Map U02A<br />

Lot 7-<br />

Map U03<br />

Lot 53-<br />

Map U03<br />

Lot 52-<br />

HANSON DR<br />

Map U05<br />

Lot 45-<br />

Map U04<br />

Lot 32-<br />

Map U02A<br />

Lot 139-<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS Map U02A<br />

Map HAVE U02A BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

Lot 152-<br />

Map U03 Lot 23-<br />

ACQUISITION. Lot 153-<br />

Map<br />

U02A Lot 154-<br />

Map<br />

U02A<br />

Lot 77-<br />

Map<br />

U02A<br />

Lot 78-<br />

Map<br />

U02A<br />

Lot 71-<br />

Map<br />

U02A<br />

Lot 80-<br />

Map<br />

U02A<br />

Lot 81-<br />

Map R05<br />

Lot 11-<br />

Map<br />

U02A<br />

Lot 70-<br />

Map<br />

U02A<br />

Lot 69-<br />

Map<br />

U02A<br />

Lot 53-<br />

Map<br />

U02A<br />

Lot 57-<br />

Map<br />

U02A<br />

Lot 68-<br />

Map<br />

U02A<br />

Lot 67-<br />

Map U05<br />

Lot 49-<br />

Map R05<br />

Lot 11-<br />

Map<br />

U02A<br />

Lot 66-<br />

Map U02A<br />

Lot 82-<br />

Map<br />

U02A<br />

Lot 52-<br />

Map<br />

U02A<br />

Lot 59-<br />

Map<br />

U02A<br />

Lot 60-<br />

Map<br />

U02A<br />

Lot 65-<br />

Map<br />

U02A<br />

Lot 61-<br />

Map<br />

U05 Lot<br />

41-<br />

Map<br />

U02A<br />

Lot 62-<br />

Map<br />

U02A<br />

Lot 63-<br />

Map<br />

U02A<br />

Lot 84-<br />

Map U05<br />

Lot 19-<br />

Map U05<br />

Lot 12-<br />

Map<br />

U02A<br />

Lot 51-<br />

Map U02A<br />

Lot 50-<br />

Map<br />

U02A<br />

Lot 49-<br />

Map<br />

U02A<br />

Lot 48-<br />

Map<br />

U02A<br />

Lot 38-<br />

Map<br />

U02A<br />

Lot 39-<br />

Map<br />

U02A<br />

Lot 46-<br />

Map<br />

U02A<br />

Lot 45-<br />

Map U05<br />

Lot 41-<br />

Map<br />

U05 Lot 34-<br />

Map<br />

U02A<br />

Lot 85-<br />

Map<br />

U02A<br />

Lot 40-<br />

Map<br />

U02A<br />

Lot 44-<br />

Map U02A<br />

Lot 152-<br />

Map<br />

U02A<br />

Lot 36-<br />

Map U05<br />

Lot 20-<br />

Map<br />

U02A<br />

Lot 42-<br />

Map U02A<br />

Lot 34-<br />

Map<br />

U02A<br />

Lot 43-<br />

Map U05<br />

Lot 33-<br />

Map U05<br />

Lot 8-<br />

Map<br />

U02A<br />

Lot 35-<br />

Map<br />

U02A<br />

Lot 33-<br />

Map<br />

U02A<br />

Lot 31-<br />

Map U05<br />

Lot 9-<br />

Map<br />

U02A<br />

Lot 90-<br />

Map U05<br />

Lot 2-<br />

Map<br />

U02A<br />

Lot 22-<br />

Map<br />

U02A Lot<br />

23-<br />

Map<br />

U02A<br />

Lot 30-<br />

Map<br />

U02A<br />

Lot 29-<br />

Map U05<br />

Lot 22-<br />

Map<br />

U02A Lot<br />

24-<br />

Map<br />

U02A Lot<br />

25-<br />

Map<br />

U02A Lot<br />

26-<br />

Map U02A<br />

Lot 88-<br />

Map<br />

U02A<br />

Lot 89-<br />

Map U02A<br />

Lot 93-<br />

Map U02A<br />

Lot 96-<br />

Map<br />

U05<br />

Lot 18-<br />

Map U02A<br />

Lot 97-<br />

Map U02A<br />

Lot 98-<br />

Map<br />

U02A Lot<br />

99-<br />

Map<br />

U02A<br />

Lot 129-<br />

Map U03<br />

Lot<br />

65-<br />

Map<br />

U02A<br />

Lot 100-<br />

Map<br />

U02A<br />

Lot 125-<br />

Map U05 Lot 1-<br />

Map<br />

U03<br />

Lot 63-<br />

Map<br />

U03<br />

Lot 62-<br />

Map<br />

U03<br />

Lot 67-<br />

Map U03<br />

Lot 61-<br />

Map U03<br />

Lot 60-<br />

Map U03<br />

Lot 59-<br />

Map U03<br />

Lot 58-<br />

Map U02A<br />

Lot 6-<br />

Map<br />

U03<br />

Lot 68-<br />

Map<br />

U03 Lot<br />

67-<br />

Map U02A<br />

Lot 5-<br />

Map U03<br />

Lot 56-<br />

Map U02A<br />

Lot 4-<br />

Map<br />

U02A<br />

Map<br />

U03<br />

Lot 69-<br />

Lot 3-<br />

Map<br />

U02A<br />

Lot 2-<br />

Map<br />

U04<br />

Lot 47-<br />

Map U03<br />

Lot 50-<br />

Map<br />

U02A<br />

Lot 1-<br />

Map<br />

U02A<br />

Lot 133-<br />

Map U03<br />

Lot 23-<br />

Map<br />

U02A Lot<br />

134-<br />

Map<br />

U02A Lot<br />

137-<br />

Map<br />

U02A<br />

Lot 140-<br />

Map U04<br />

Lot 33-<br />

Map<br />

U04<br />

Lot 43-<br />

Map<br />

U03<br />

Lot 49-<br />

Map<br />

U03 Lot<br />

48-<br />

Map U02A<br />

Lot 142-<br />

Map<br />

U04<br />

Lot 39-<br />

Map<br />

U03 Lot<br />

90-<br />

Map<br />

U04 Lot 33-<br />

Map<br />

U03<br />

Lot 82-<br />

Map<br />

U03<br />

Lot 83-<br />

Map U03<br />

Lot 47-<br />

Map U04<br />

Lot 34-<br />

Map U04<br />

Lot 59-<br />

Map U03<br />

Lot 46-<br />

Map U02 Lot 127-<br />

Map<br />

U02 Lot<br />

125-<br />

Map U03<br />

Lot 91-<br />

Map<br />

U03<br />

Lot 93-<br />

Map U04<br />

Lot 31-<br />

MAIN ST<br />

Map U04<br />

Lot 35-<br />

Map<br />

U03<br />

Lot 29-<br />

Map<br />

U03<br />

Lot 29-<br />

Map U03<br />

Lot<br />

97-<br />

£¤ 201<br />

Map<br />

Map U04 Lot 58- U04<br />

Lot 38-<br />

Map U03<br />

Lot 30-<br />

Map<br />

U03 Lot<br />

26-<br />

Map R04 Lot 26-<br />

Map U04<br />

Lot 31-<br />

Map U04<br />

Lot 36-<br />

Map U04<br />

Lot 38-<br />

Map<br />

U03<br />

Lot 30-<br />

Map U04<br />

Lot 38-<br />

Map<br />

U03<br />

Lot 31-<br />

Map<br />

U03<br />

Lot 22-<br />

Map U04<br />

Lot 30-<br />

Map U03<br />

Lot 42-<br />

Map<br />

U04 Lot<br />

29-<br />

Map U03<br />

Lot 45-<br />

Map<br />

U03<br />

Lot 21-<br />

Map U02<br />

Lot 128-<br />

Map U04<br />

Lot 15-<br />

Map<br />

U03<br />

Lot 17-<br />

Map<br />

U03<br />

Lot 16-<br />

Map U04<br />

Lot 32-<br />

Map<br />

U04<br />

Lot 14-<br />

Map U04<br />

Lot 25-<br />

Map U03<br />

Lot 38-<br />

Map U03<br />

Lot 37-<br />

Map<br />

U03<br />

Lot 36-<br />

Map U03<br />

Lot 35-<br />

Map U03<br />

Lot 5-<br />

Map U03 Lot 11-<br />

Map U03<br />

Lot 13- Map<br />

U03 Lot 12-<br />

Map U02<br />

Lot 129-<br />

Map U04<br />

Lot 16-<br />

Map U04<br />

Lot 23-<br />

PLEASANT ST<br />

Map<br />

U04 Lot 18-<br />

Map U04 Lot<br />

19-<br />

Map U02 Lot 130-<br />

Map U04<br />

Lot 13-<br />

Map U04<br />

Lot 9-<br />

Map U04<br />

Lot 21-<br />

Map<br />

U04 Lot<br />

22-<br />

Map U04<br />

Lot 22-<br />

Map U04<br />

Lot 22-<br />

Map<br />

U06 Lot 56-<br />

Map U03<br />

Lot 1-<br />

Map U04<br />

Lot 6-<br />

Map<br />

U04 Lot<br />

22-<br />

Map U06<br />

Lot 62-<br />

Map U06<br />

Lot 58-<br />

Map U06<br />

Lot 61-<br />

Map<br />

U06 Lot<br />

60-<br />

Map U06<br />

Lot 59-<br />

Map<br />

U03<br />

Lot 4-<br />

Map U02<br />

Lot 132-<br />

Map U04<br />

Lot 11-<br />

Map U04<br />

Lot 8-<br />

Map<br />

U04<br />

Lot 6-<br />

Map U04<br />

Lot 4-<br />

Map U04<br />

Lot 2-<br />

Map U06<br />

Lot 68-<br />

Map U06<br />

Lot 69-<br />

Map U06<br />

Lot 48-<br />

Map U03<br />

Lot 1-<br />

Map U06<br />

Lot 70-<br />

Map U06<br />

Lot 46-<br />

Map U06<br />

Lot 49-<br />

Map R04 Lot 47-2<br />

GOVERNORS WAY<br />

Map U04 Lot 1-<br />

Map<br />

U06<br />

Lot 75-<br />

Map<br />

U06 Lot<br />

Map 72-<br />

U06<br />

Lot 71-<br />

Map U06<br />

Lot 63-<br />

Map U06<br />

Lot 55-<br />

Map U06<br />

Lot<br />

50-<br />

Map U06<br />

Lot 65-<br />

Map<br />

U06 Lot<br />

66-<br />

Map R04<br />

Lot 17-<br />

Map<br />

U06<br />

Lot 76-<br />

VILLAGE DR<br />

S<br />

SEWALL LN<br />

Map R04<br />

Lot 47-<br />

Map<br />

U06 Lot<br />

77-<br />

Map<br />

U06 Lot<br />

67-<br />

Map<br />

Map U06 Lot<br />

U06 Lot 29-<br />

37-<br />

Map<br />

U06 Lot<br />

77-<br />

Map U06<br />

Lot 17-<br />

Map R04<br />

Lot 17-<br />

Map R04 Lot 47-<br />

Map U06<br />

Lot 15-<br />

Map U06<br />

Lot 80-<br />

Map U06<br />

Lot 79-<br />

Map U06<br />

Lot 78-<br />

Map R04<br />

Lot 18-<br />

Map R04 Lot 47-3<br />

Map<br />

U06 Lot<br />

14-<br />

Map U06 Lot 19-<br />

Community Way<br />

Map<br />

U06 Lot<br />

18-<br />

Map<br />

U07<br />

Lot 1-<br />

Map U06<br />

Lot<br />

12-<br />

Map R04 Lot 17-<br />

Map R04 Lot 17-<br />

Map U07 Lot 4-<br />

Map U07 Lot 4-<br />

Map R04<br />

Lot 49-<br />

Map U07<br />

Lot 4-<br />

Map U07 Lot 4-<br />

Map U07<br />

Lot 3-<br />

Map U06<br />

Lot 11-<br />

Map R04 Lot 16-<br />

COASTAL CONNECTOR<br />

Future Pedestrian<br />

Bridge<br />

Map U07<br />

Lot 4-<br />

Map U06 Lot 11-<br />

Map R04 Lot 17-<br />

Map R04<br />

Lot 45-<br />

Map Lot 0-<br />

Map U07<br />

Lot 5-<br />

Map<br />

U07<br />

Lot 6-<br />

Map U06 Lot 11-<br />

Map U23 Lot 72-<br />

Map<br />

U07<br />

Lot 7-<br />

Map<br />

U07<br />

Lot 8-<br />

Map R04 Lot 6-<br />

Map R04 Lot 6-<br />

Map<br />

U06<br />

Lot 7-<br />

Map U07<br />

Lot 16-<br />

Map U07<br />

Lot 10-<br />

Map<br />

U07<br />

Lot 9-<br />

Map<br />

U06<br />

Lot 6-<br />

Map R04<br />

Lot 48-<br />

Map<br />

U07<br />

Lot 11-<br />

Map R04<br />

Lot 6-<br />

Map<br />

U07<br />

Lot 12-<br />

Map U23<br />

Lot 56-<br />

Map<br />

U23 Lot<br />

55-<br />

Map U06<br />

Lot 4-<br />

SHADY LN<br />

Map U07<br />

Lot 14-<br />

Map<br />

U07 Lot<br />

14-<br />

Map<br />

U07<br />

Lot 13-<br />

Map U07<br />

Lot 14-<br />

Map<br />

U06<br />

Lot 2-<br />

Map U23<br />

Lot 58-<br />

Map U06<br />

Lot 1-<br />

HAWTHORNE LN<br />

CRABTREE DR<br />

HEMLOCK DR<br />

Future Pedestrian<br />

Bridge<br />

Map<br />

U07 Lot<br />

14-<br />

Map<br />

U07<br />

Lot 14-<br />

Map R04 Lot 45-<br />

Map U07<br />

Lot 14-<br />

Map Lot 0-<br />

Map U23 Lot 75-<br />

Map<br />

U23 Lot<br />

67-<br />

Map U08<br />

Lot 30-<br />

Map U07<br />

Lot 15-<br />

Map<br />

U23<br />

Lot 71-<br />

Map R04<br />

Lot 1-<br />

Map<br />

U23<br />

Lot 32-<br />

Map U08 Lot 29-<br />

Map U08<br />

Lot 28-<br />

Map<br />

U23<br />

Lot 33-<br />

Map U07<br />

Lot 17-<br />

Map U08<br />

Lot 31-<br />

Map U23 Lot 74-<br />

Map R04 Lot 45-<br />

Map<br />

U23<br />

Lot 70-<br />

Map<br />

U23<br />

Lot 17-<br />

Map<br />

U23 Lot<br />

42-<br />

TOPHSAM CROSSING<br />

Map U23<br />

Lot 43-<br />

Map<br />

U08<br />

Lot 1-<br />

UV 196<br />

Map<br />

U23 Lot 5-<br />

Map U23<br />

Lot 69-<br />

Future Merrymeeting<br />

Rail with Trail<br />

Map U23<br />

Lot 44-<br />

COASTAL CONNECTOR<br />

Map U23<br />

Lot 1-<br />

Map<br />

U23 Lot 2-<br />

Map<br />

U23 Lot 3-<br />

Map<br />

U23 Lot 4-<br />

Map U23<br />

Lot 6-<br />

Map R04<br />

Lot 45-<br />

LOWER ROAD RAILINE<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

DUSTIN LN<br />

Map<br />

U11<br />

Lot 3-<br />

Map U11<br />

Lot 2-<br />

Map U11<br />

Lot 2-<br />

Map U11<br />

Lot 2-<br />

Map U11<br />

Lot 2-<br />

Map U11<br />

Lot 4-<br />

UV24<br />

Map U11<br />

Lot 5-<br />

Map U11 Lot 1-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

Map U08<br />

Lot 3-<br />

Map<br />

U08<br />

Lot 7-<br />

Connect to Existing<br />

Multi-Use Path<br />

Map U08<br />

Lot 26-<br />

Map U08<br />

Lot 4-<br />

Map<br />

U08 Lot<br />

25-<br />

Map U08<br />

Lot 27-<br />

Map U08<br />

Lot 5-<br />

Map<br />

U08<br />

Lot 22-<br />

Map U08<br />

Lot 24-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

Map U10<br />

Lot 10-<br />

TEDFORDDR<br />

MIDDLESEX RD<br />

Map<br />

U08<br />

Lot 16-<br />

Map U08<br />

Lot 21-<br />

Map U08<br />

Lot 23-<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Sidewalks<br />

Proposed Bike Lanes<br />

Proposed Paved Driveways<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Proposed ROW<br />

Lane Line, Crosswalk<br />

Town of Topsham Bike Path Master Plan<br />

S<br />

Existing Trail<br />

Potential/Future Trail<br />

Traffic Signal<br />

l<br />

0 500 1,000 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-5<br />

Strategy 2A, Option 2<br />

Route 196/ US Route 201 Roundabout<br />

with Widening of Coastal Connector<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


Map R05A<br />

Lot 36-<br />

Map R04 Lot<br />

39-<br />

Map R04<br />

Lot 37-<br />

Map R05A<br />

Lot 35-<br />

Map<br />

Lot 0-<br />

Map<br />

R05A<br />

Lot 28-<br />

Map R05A<br />

Lot 34-<br />

Map R05A<br />

Lot 33-<br />

Map R04<br />

Lot 34-<br />

Map R04 Lot 22-<br />

Map R05A<br />

Lot 48-<br />

Map R05A<br />

Lot 47-<br />

Map R05A<br />

Lot 29-<br />

Map R05A<br />

Lot 30-<br />

Map Lot 0-<br />

FOREST DR<br />

Map R05A<br />

Lot 31-<br />

Map R05A Lot 6-<br />

Map R05A<br />

Lot 32-<br />

Map R05A Lot 5-<br />

Map R05A Lot 4-<br />

Map R05A Lot 3-<br />

Map R04<br />

Lot 33-<br />

Map R04<br />

Lot 32-<br />

Map R04 Lot 31-<br />

Map R04 Lot 30-<br />

Map Lot 0-<br />

EAGLE'S WAY<br />

Map R04<br />

Lot 45-<br />

Map R04<br />

Lot 25-<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Map R05A Lot 7-<br />

Map R05A Lot 3-<br />

Proposed Sidewalks<br />

Map R05A Lot 8-<br />

Map R05A Lot 1-<br />

Proposed Bike Lanes<br />

Map Lot 0-<br />

Proposed Paved Driveways<br />

MUNROE LN<br />

Map R05A Lot 2-<br />

Map U05 Lot 43-<br />

Map R04 Lot 21-<br />

Map R04<br />

Lot 26-<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Proposed ROW<br />

Lane Line, Crosswalk<br />

Map R05<br />

Lot 92-<br />

Map U05 Lot 42-<br />

Town of Topsham Bike Path Master Plan<br />

Map U05 Lot 48-<br />

5TH ST<br />

Map U05<br />

Lot 41-<br />

Map U05 Lot 41-<br />

Map U05<br />

Lot 40-<br />

Map U05<br />

Lot 39-<br />

4TH ST<br />

Map U05<br />

Lot 33-<br />

Map U05 Lot 44-<br />

Existing Trail<br />

Potential/Future Trail<br />

Map U05 Lot 47-<br />

Map U05<br />

Lot 37-<br />

Map U05<br />

Lot 36-<br />

Map U05<br />

Lot 34-<br />

Map U05 Lot 44-<br />

Map U05<br />

Lot 49-<br />

Map U05<br />

Lot 22-<br />

Map U05 Lot 45-<br />

Map R05<br />

Lot 17-<br />

Map U05 Lot 46-<br />

UNION PARK<br />

Map U05 Lot 19-<br />

Map U05 Lot 20-<br />

Map U05<br />

Lot 20-<br />

Map<br />

U05 Lot<br />

15-<br />

Map U05<br />

Lot 17-<br />

Map U05 Lot 18-<br />

Map U04<br />

Lot 32-<br />

l<br />

MONUMENT PL<br />

Map U04 Lot 32-<br />

0 200 400 Feet<br />

Map R05 Lot 16-1<br />

Map R05 Lot 16-6<br />

Map R05<br />

Lot 11-<br />

HORTON PL<br />

Map R05 Lot 11-<br />

Map R05 Lot 11-<br />

Map U05 Lot 12-<br />

Map U05<br />

Lot 11-<br />

Map U05<br />

Lot 10-<br />

Map U05<br />

Lot 9-<br />

Map U05 Lot 8-<br />

Map U05<br />

Lot 2-<br />

Map U05<br />

Lot 4-<br />

Map U05 Lot 1-<br />

MAIN ST<br />

Map U04 Lot 33-<br />

£¤ 201<br />

Map U04<br />

Lot 31-<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-6<br />

Strategy 2A, Option 2A<br />

Route 196/US Route 201 Roundabout<br />

Brunswick & Topsham Maine<br />

HAMILTON CT<br />

ET DR<br />

Map U21<br />

THESE PLANS Lot 63- DEPICT CONCEPTUAL Map IDEAS R05 Lot AND 16-2 ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Map R05 Lot 16-3<br />

Map R05 Lot 16-5<br />

Map R05 Lot 16-4<br />

Map U02A<br />

Lot 72-<br />

Map U02A Lot 73-<br />

Map U02A<br />

Lot 55-<br />

Map U02A<br />

Lot 54-<br />

Map U02A<br />

Lot 53-<br />

Map U02A<br />

Lot 52-<br />

Map U02A<br />

Lot 51-<br />

BARROWS DR<br />

Map U02A<br />

Lot 36-<br />

Map U02A<br />

Lot 35-<br />

Map U02A<br />

Lot 21-<br />

Map U02A<br />

Lot 20-<br />

Map U03<br />

Lot 65-<br />

Map U03<br />

Lot 66-<br />

Map U03<br />

Lot 67-<br />

Map U04<br />

Lot 49-<br />

Map<br />

U04 Lot 48-<br />

Map U04<br />

Lot 33-<br />

Map U04 Lot 51-<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


AV<br />

Map R05A<br />

Lot 30-<br />

Map R05A<br />

Lot 31-<br />

Map R05A<br />

Lot 32-<br />

FOREST DR<br />

Map R05A<br />

Lot 7-<br />

Map Lot 0-<br />

Map R05A<br />

Lot 6-<br />

Map R05A Lot 2-<br />

Map R05A<br />

Lot 5-<br />

Map R05A Lot 4-<br />

Map R05A Lot 3-<br />

Map R05A Lot 3-<br />

Map R05A Lot 1-<br />

Map R04 Lot 34-<br />

Map R04<br />

Lot 33-<br />

Map R04<br />

Lot 32-<br />

Map R04<br />

Lot 31-<br />

Map R04<br />

Lot 30-<br />

Map<br />

Lot 0-<br />

EAGLES' WAY<br />

Map Lot 0-<br />

Map R04<br />

Lot 22-<br />

Map R04 Lot 45-<br />

Map R04<br />

Lot 24-<br />

Map R04<br />

Lot 27-<br />

Map R04<br />

Lot 28-<br />

Map R04 Lot 18-<br />

Map R04 Lot 17-<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Map R05 Lot 92-<br />

Proposed Sidewalk/Crosswalk<br />

Map R05<br />

Lot 17-<br />

£¤ 201 COASTAL CONNECTOR<br />

Map R04<br />

Map U05<br />

Lot 25-<br />

Lot 43-<br />

Map Lot 0-<br />

Map U05<br />

Lot 48-<br />

Map U05<br />

Lot 42-<br />

Map U05 Lot 47-<br />

Map U05<br />

Lot 41-<br />

Map R04 Lot 21-<br />

Map<br />

U05 Lot 40-<br />

Map U05<br />

Map R04 Lot 47-<br />

Lot 41-<br />

Map<br />

U05<br />

Lot 37-<br />

Map U05<br />

Map U05<br />

Lot 33-<br />

Lot 36-<br />

Map U05<br />

Lot 49- Map U05 Lot 34-<br />

Map U05 Lot 46-<br />

Map R04<br />

Lot 26-<br />

Map U05 Lot 44-<br />

Map U05<br />

Lot 22-<br />

UV 196 Map<br />

U05 Lot<br />

20-<br />

Map R05 Lot 16-5<br />

L E W I S T O N R D<br />

Map R05 Lot 16-6 Map R05 Lot 11-<br />

Map R05 Lot 16-4<br />

Map U22<br />

Lot 30-<br />

Map U02A<br />

Lot 72-<br />

Map U02A<br />

Lot 73-<br />

Map U02A<br />

Lot 74-<br />

Map U02A<br />

Lot 75-<br />

Map U02A<br />

Lot 77-<br />

Map U02A<br />

Lot 55-<br />

UNION PARK RD<br />

Map U02A<br />

Lot 71-<br />

HORTON PL<br />

Map U02A<br />

Lot 70-<br />

Map R05 Lot 11-<br />

Map U02A<br />

Lot 54-<br />

Map U02A<br />

Lot 69-<br />

Map R05<br />

Lot 11-<br />

Map U02A<br />

Lot 56-<br />

Map U02A<br />

Lot 53-<br />

Map U02A<br />

Lot 57-<br />

Map U02A<br />

Lot 58-<br />

Map U02A<br />

Lot 60-<br />

Map U02A<br />

Lot 52-<br />

Map U02A<br />

Lot 49-<br />

Map U05<br />

Lot 12-<br />

Map U02A<br />

Lot 51-<br />

Map U02A<br />

Lot 50-<br />

Map U05<br />

Lot 19-<br />

S<br />

FIFTH ST<br />

Map U02A<br />

Lot 38-<br />

Map U22 Lot 27-<br />

Map U02A<br />

Lot 68-<br />

Map U02A<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT Map U02A TO CHANGE. NO<br />

Map U02A Lot 39-<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL Lot 59- PROPERTY<br />

Lot 48-<br />

ACQUISITION.<br />

Map U02A<br />

Map U02A<br />

Lot 78-<br />

Lot 67-<br />

Map U02A<br />

Lot 47-<br />

Map U02A<br />

Lot 40-<br />

FOURTH ST<br />

MONUMENT PL<br />

Map U05<br />

Lot 11-<br />

Map U02A<br />

Lot 36-<br />

Map U05<br />

Lot 20-<br />

Map U05<br />

Lot 10-<br />

Map U05<br />

Lot 8-<br />

Map U02A<br />

Lot 35-<br />

Map U02A<br />

Lot 34-<br />

Map U02A<br />

Lot 33-<br />

Map U02A<br />

Lot 32-<br />

SECOND ST<br />

Map U05<br />

Lot 9-<br />

Map U02A<br />

Lot 22-<br />

Map U05<br />

Lot 15-<br />

FIRST ST<br />

Map U02A<br />

Lot 23-<br />

Map U05<br />

Lot 2-<br />

Map U05<br />

Lot 4-<br />

Map U02A<br />

Lot 21-<br />

BARROWS DR<br />

Map U02A<br />

Lot 24-<br />

Map U05<br />

Lot 17-<br />

Map U02A<br />

Lot 20-<br />

Map U05<br />

Lot 18-<br />

Map U02A<br />

Lot 19-<br />

Map U03 Lot 65-<br />

Map U03<br />

Lot 65-<br />

S<br />

Map U05<br />

Lot 1-<br />

Map U03<br />

Lot 66-<br />

Map U05 Lot 44-<br />

Map U03<br />

Lot 67-<br />

Map U03<br />

Lot 67-<br />

Map U04<br />

Lot 49-<br />

Map U04<br />

Lot 48-<br />

Map U04<br />

Lot 47-<br />

Map U04 Lot 33-<br />

Map U04<br />

Lot 51-<br />

Map U05 Lot 45-<br />

Map U04 Lot 32-<br />

Map U04<br />

Lot 33-<br />

MAIN ST<br />

Map U04 Lot 31-<br />

Map U04 Lot 31-<br />

Map U04<br />

Lot 32-<br />

Map U04 Lot 13-<br />

Map R04 Lot 47-2<br />

Map R04<br />

Lot 47-<br />

Map R04<br />

Lot 17-<br />

Map U04<br />

Lot 1-<br />

Proposed Bike Lanes<br />

Proposed Paved Driveways<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Proposed Retaining Wall<br />

Lane Lines, Sidewalk<br />

Proposed ROW<br />

Town of Topsham Bike Path Master Plan<br />

S<br />

Existing Trail<br />

Potential/Future Trail<br />

Traffic Signal<br />

GOVERNORS WAY<br />

l<br />

S<br />

SEWALL LN<br />

0 250 500 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-7<br />

Strategy 2A, Option 3<br />

Route 196/ US Route 201<br />

Grade-Separation with Signals<br />

Brunswick & Topsham Maine<br />

Commun<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

PATRICIA DR<br />

BARBAR<br />

CAROLY


V<br />

Map R05A<br />

Lot 30-<br />

Map R05A<br />

Lot 31-<br />

Map R05A<br />

Lot 32-<br />

FOREST DR<br />

Map R05A<br />

Lot 7-<br />

Map Lot 0-<br />

Map R05A<br />

Lot 6-<br />

Map R05A<br />

Lot 5-<br />

Map R05A Lot 2-<br />

Map R05A Lot 4-<br />

Map R05A Lot 3-<br />

Map R05A Lot 3-<br />

Map R05A Lot 1-<br />

Map R04 Lot 34-<br />

Map R04<br />

Lot 33-<br />

Map R04<br />

Lot 32-<br />

Map R04<br />

Lot 31-<br />

Map R04<br />

Lot 30-<br />

Map<br />

Lot 0-<br />

EAGLES' WAY<br />

Map Lot 0-<br />

Map R04 Lot 22-<br />

Map R04 Lot 45-<br />

Map R04 Lot 24-<br />

Map R04<br />

Lot 27-<br />

Map R04 Lot 28-<br />

Map R04 Lot 17-<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Map R05<br />

Lot 92-<br />

Map R04 Lot 18-<br />

Proposed Bridge<br />

Proposed Sidewalk/Crosswalk<br />

Map R05<br />

Lot 17-<br />

£¤ 201 COASTAL CONNECTOR<br />

Map R04<br />

Map U05<br />

Lot 25-<br />

Lot 43-<br />

Map U05<br />

Lot 48-<br />

Map U05<br />

Lot 42-<br />

Map U05 Lot 47-<br />

Map U05<br />

Lot 41-<br />

Map R04 Lot 21-<br />

Map<br />

U05 Lot 40-<br />

Map U05<br />

Lot 41-<br />

Map<br />

U05<br />

Lot 37-<br />

Map U05<br />

Map U05<br />

Lot 33-<br />

Lot 36-<br />

Map U05<br />

Lot 49- Map U05 Lot 34-<br />

Map U05 Lot 46-<br />

Map R04<br />

Map U05 Lot 44-<br />

Lot 26-<br />

Map U05<br />

Lot 22-<br />

UV 196 Map<br />

U05 Lot<br />

20-<br />

Map R05 Lot 16-5<br />

L E W I S T O N R D<br />

Map R05 Lot 16-6 Map R05 Lot 11-<br />

Map U22 Lot 27-<br />

Map R05 Lot 16-4<br />

Map U22<br />

Lot 30-<br />

Map U02A<br />

Lot 72-<br />

Map U02A<br />

Lot 73-<br />

Map U02A<br />

Lot 74-<br />

Map U02A<br />

Lot 75-<br />

Map U02A<br />

Lot 77-<br />

Map U02A<br />

Lot 55-<br />

UNION PARK RD<br />

Map U02A<br />

Lot 71-<br />

HORTON PL<br />

Map U02A<br />

Lot 70-<br />

Map R05 Lot 11-<br />

Map U02A<br />

Lot 54-<br />

Map U02A<br />

Lot 69-<br />

Map U02A<br />

Lot 68-<br />

Map R05<br />

Lot 11-<br />

Map U02A<br />

Lot 56-<br />

Map U02A<br />

Lot 53-<br />

Map U02A<br />

Lot 57-<br />

Map U02A<br />

Lot 58-<br />

Map U02A<br />

Lot 60-<br />

Map U02A<br />

Lot 52-<br />

Map U02A<br />

Lot 49-<br />

Map U05<br />

Lot 12-<br />

Map U02A<br />

Lot 51-<br />

Map U02A<br />

Lot 50-<br />

Map U05<br />

Lot 19-<br />

FIFTH ST<br />

Map U02A<br />

Lot 38-<br />

Map U02A<br />

Map U02A<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. Map U02A NOLot 39-<br />

Lot 59-<br />

Lot 48-<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Map U02A<br />

Lot 78-<br />

Map U02A<br />

Lot 67-<br />

Map U02A<br />

Lot 47-<br />

Map U02A<br />

Lot 40-<br />

FOURTH ST<br />

MONUMENT PL<br />

Map U05<br />

Lot 11-<br />

Map U02A<br />

Lot 36-<br />

Map U05<br />

Lot 20-<br />

Map U05<br />

Lot 10-<br />

Map U05<br />

Lot 8-<br />

Map U02A<br />

Lot 35-<br />

Map U02A<br />

Lot 34-<br />

Map U02A<br />

Lot 33-<br />

Map U02A<br />

Lot 32-<br />

SECOND ST<br />

Map U05<br />

Lot 9-<br />

Map<br />

U02A Lot 31-<br />

Map U02A<br />

Lot 22-<br />

Map U05<br />

Lot 15-<br />

FIRST ST<br />

Map U02A<br />

Lot 23-<br />

Map U05<br />

Lot 2-<br />

Map U05<br />

Lot 4-<br />

Map U02A<br />

Lot 21-<br />

BARROWS DR<br />

Map U02A<br />

Lot 24-<br />

Map U05<br />

Lot 17-<br />

Map U02A<br />

Lot 20-<br />

Map U05<br />

Lot 18-<br />

Map U02A<br />

Lot 19-<br />

Map U03 Lot 65-<br />

Map U03<br />

Lot 65-<br />

Map U05<br />

Lot 1-<br />

Map U03<br />

Lot 66-<br />

Map U05 Lot 44-<br />

Map U03<br />

Lot 67-<br />

Map U03<br />

Lot 67-<br />

Map U04<br />

Lot 49-<br />

Map U04<br />

Lot 48-<br />

Map U04<br />

Lot 47-<br />

Map U05 Lot 45-<br />

Map U04 Lot 33-<br />

Map U04<br />

Lot 51-<br />

Map U04 Lot 32-<br />

Map U04<br />

Lot 33-<br />

MAIN ST<br />

Map U04 Lot 31-<br />

Map U04 Lot 31-<br />

Map U04<br />

Lot 32-<br />

Map U04 Lot 13-<br />

Map R04 Lot 47-2<br />

Map R04 Lot 47-<br />

Map R04<br />

Lot 47-<br />

Map R04<br />

Lot 17-<br />

Map U04<br />

Lot 1-<br />

Proposed Bike Lanes<br />

Proposed Paved Driveways<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines, Sidewalk<br />

Proposed Retaining Wall<br />

Proposed ROW<br />

Town of Topsham Bike Path Master Plan<br />

S<br />

Existing Trail<br />

Potential/Future Trail<br />

Traffic Signal<br />

GOVERNORS WAY<br />

l<br />

S<br />

SEWALL LN<br />

Communi<br />

0 250 500 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-8<br />

Strategy 2A, Option 3A<br />

Route 196/US Route 201<br />

Grade-Separation with Roundabouts<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

PATRICIA DR<br />

BARBARA<br />

CAROLY


Map R04<br />

Lot 18-<br />

Map R04 Lot 47-2<br />

LLAGE DR<br />

Map<br />

Lot 0-<br />

S<br />

Map R04 Lot 18-<br />

Map R04 Lot 47-3<br />

Community Way<br />

Map R04<br />

Lot 49-<br />

Map R04 Lot 16-<br />

COASTAL CONNECTOR<br />

Future Pedestrian<br />

Bridge<br />

Map U23 Lot 72-<br />

Map R04<br />

Lot 48-<br />

Map Lot 0-<br />

E LN<br />

Map<br />

U23 Lot<br />

67-<br />

CRABTREE DR<br />

OCK DR<br />

Map<br />

U23<br />

Lot 70-<br />

Map<br />

U23 Lot<br />

42-<br />

TOPHSAM CROSSING<br />

Map U23<br />

Lot 69-<br />

Future Merrymeeting<br />

Rail with Trail<br />

Map U23<br />

Lot 5-<br />

Map<br />

U23 Lot 6-<br />

Map U23<br />

Lot 7-<br />

Map U23<br />

Lot 8-<br />

LOWER ROAD RAILINE<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Bike Lanes<br />

Proposed Raised Island<br />

Map R04 Lot 47-<br />

SEWALL LN<br />

Map<br />

U10<br />

Lot 10-<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalk, Sidewalk<br />

Proposed ROW<br />

Town of Topsham Bike Path Master Plan<br />

Existing Trail<br />

Map R04 Lot 47-<br />

Map U10<br />

Lot 10-<br />

S<br />

Potential/Future Trail<br />

Traffic Signal<br />

GOVERNORS WAY<br />

Map U10<br />

Lot 10-<br />

Map U07<br />

Lot 16-<br />

Map R04<br />

Lot 1-<br />

DUSTIN LN<br />

l<br />

Map R04<br />

Lot 26-<br />

Map R04 Lot 17-<br />

0 500<br />

Map U04<br />

Lot 1-<br />

Map U07 Lot 4-<br />

Map<br />

U07<br />

Lot 4-<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Map U07 Lot 4-<br />

Map<br />

U08<br />

Lot 1-<br />

COASTAL CONNECTOR<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-9<br />

Strategy 2A, Option 4<br />

Coastal Connector<br />

Widen to 4 Lanes<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

LESEX RD


Map R05 Lot 75-<br />

Map R05 Lot 75-<br />

Map R05 Lot 75-<br />

Map R05<br />

Lot 75-<br />

§¨¦295<br />

Map R05 Lot 87-<br />

Map R04<br />

Lot 17-<br />

Map<br />

R04 Lot<br />

40-<br />

£¤ 201<br />

RHOADES LN<br />

Map R05 Lot 86-<br />

Map R04 Lot 40-<br />

Legend<br />

Map R05<br />

Lot 73-<br />

Map R04 Lot 40-<br />

Map R04 Lot 40-<br />

Railroad<br />

Existing Conservation Land<br />

Map R05 Lot 75-<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Map R05 Lot 75-<br />

Map R05<br />

Lot 72-<br />

Map R05<br />

Lot 72-<br />

Map R04 Lot 42-<br />

Map R04<br />

Lot 44-<br />

Map R04<br />

Lot 40-<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalk<br />

OLD AUGUSTA RD<br />

Proposed ROW<br />

Potential Future Roadway Connection<br />

Map R05 Lot 92-<br />

Town of Topsham Bike Path Master Plan<br />

DOMINION AVE<br />

Map R05<br />

Lot 34-<br />

Map R05 Lot 76-<br />

Map R05<br />

Lot 23-<br />

Map R05<br />

Lot 23-<br />

Map R05<br />

Lot 92-<br />

s<br />

Map R05<br />

Lot 70-<br />

Map R05<br />

Lot 69-<br />

Map<br />

R05A<br />

Lot 13-<br />

Map<br />

R05A<br />

Lot 21-<br />

Map<br />

R05A Lot<br />

43-<br />

Map<br />

R05A<br />

Lot 25-<br />

Map<br />

R05A<br />

Lot 38-<br />

Map<br />

R05A Lot<br />

26-<br />

WOOD AV<br />

Map<br />

R05A<br />

Lot 49- Map<br />

Map<br />

R05A<br />

Lot 46-<br />

R05A Lot<br />

48-<br />

Map Lot 0-<br />

Map R05A Lot 2-<br />

Map R04<br />

Lot 41-<br />

Map R05A<br />

Lot 8-<br />

Map<br />

R05A Lot<br />

36-<br />

CANAM DR<br />

FOREST DR<br />

Map<br />

R05A<br />

Lot 7-<br />

Map<br />

R05A<br />

Lot 6-<br />

Map R04 Lot 40-<br />

Map<br />

R04 Lot<br />

37-<br />

Map<br />

R05A Lot 33-<br />

Map<br />

R05A<br />

Lot 31-<br />

Map<br />

R05A<br />

Lot 5-<br />

Map R04<br />

Lot 39-<br />

Map R05A Lot 3-<br />

Map R04<br />

Lot 39-<br />

Map R04 Lot 34-<br />

Map<br />

R05A<br />

Lot 3-<br />

Map<br />

R04 Lot<br />

33- Map<br />

R04 Lot<br />

32-<br />

Map R04<br />

Lot 31-<br />

Map R04<br />

Lot 30-<br />

Map R04<br />

Lot 22-<br />

EAGLES' WAY<br />

Map R04<br />

Lot 24-<br />

S<br />

Existing Trail<br />

Potential/Future Trail<br />

Pavement Removal Lines<br />

Traffic Signal<br />

l<br />

0 400 800 Feet<br />

Map Lot 0-<br />

§¨¦295<br />

UV 196<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. Map R05BNO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY Lot 11-<br />

ACQUISITION.<br />

Map R05B Lot 9-<br />

Map R05B Lot 12-<br />

Map Lot 0-<br />

Map R05B Lot 10-<br />

Map R05 Lot 23-<br />

Map R05B<br />

Lot 1-<br />

Map R05B<br />

Lot 2-<br />

Map R05<br />

Lot 19-<br />

Map R05<br />

Lot 21-<br />

Map R05<br />

Lot 17-<br />

COASTAL CONNECTOR<br />

Map R04 Lot 25-<br />

Figure 4-10<br />

Map U05<br />

Lot 48-<br />

Map U05<br />

Lot 42-<br />

Map U05<br />

Lot 47-<br />

Map U05<br />

Map R04<br />

Lot 41-<br />

Lot 21-<br />

Map<br />

U05 Lot<br />

Brunswick & Topsham Maine<br />

41-<br />

Map R04 Lot 26-<br />

Map U05<br />

Lot 49-<br />

Map U05 Lot 46-<br />

Map U05 Lot 44-<br />

Map<br />

U05 Lot 22-<br />

L E W I S T O N R D<br />

Map R05A Lot 1-<br />

UNION PARK RD<br />

Map<br />

U05 Lot<br />

43-<br />

FIFTH ST<br />

FOURTH ST<br />

Map<br />

U05 Lot<br />

34-<br />

Map U05<br />

Lot 33-<br />

ST<br />

Map R04 Lot 45-<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Strategy 2A, Option 5<br />

Topsham Annex Intersection<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


4.8 Strategy 2B – Improve Mobility along Pleasant Street<br />

Strategy 2B involves the evaluation of measures to improve vehicular, bicycle, and<br />

pedestrian safety and mobility along Pleasant Street between the I-295 Exit 28<br />

interchange and Mill Street in the Town of Brunswick. Strategy 2B is intended to<br />

reduce congestion and vehicle conflicts by implementing access-management<br />

techniques and by providing new off-corridor connector roadways that provide<br />

alternative access to businesses and other secondary roadways.<br />

The Study Area for Strategy 2B en<strong>com</strong>passes the Pleasant Street (US Route 1)<br />

corridor, beginning 0.6 mile east of the I-295 Exit 28 interchange ramps and<br />

extending easterly approximately 1.5 miles through a primarily <strong>com</strong>mercial zone to<br />

where it ends at the intersection of Mill Street (the easterly continuation of US Route<br />

1) and Stanwood Street. The Study Area also is bounded by the Lower Road Rail<br />

Line to the south and the Androscoggin River to the north. The Study Area is located<br />

entirely within the Town of Brunswick. Based on input from the Study Advisory<br />

Committee and feedback from the public workshops and public informational<br />

meetings, three primary options with variations of Options 1 and 2 were developed,<br />

for a total of five Feasibility Study options.<br />

4.8.1 Common Features<br />

The five Feasibility Study options are similar to one another in several ways. The<br />

following proposed features are <strong>com</strong>mon to most of the options, as described in<br />

detail in this section.<br />

Gateway Roundabout: All five Feasibility Study options consider a roundabout<br />

design at the Pleasant Street/Old Portland Road intersection. The envisioned highcapacity<br />

roundabout<br />

is considered a<br />

western “gateway”<br />

because it introduces<br />

a speed and character<br />

transition between the<br />

I-295 interchange<br />

ramps and the busy<br />

<strong>com</strong>mercial district<br />

along Pleasant Street.<br />

The roundabout is<br />

large enough to easily ac<strong>com</strong>modate trucks and high traffic volumes but small<br />

enough to have a measurable traffic-calming effect. All five Study options evaluate<br />

the access and mobility effects of the roundabout for Old Portland Road (US Route<br />

1), Pleasant Street, and the I-295 ramps. Among the expected benefits is the<br />

elimination of the high-speed weaves that currently occur because of the reversedirection<br />

ramps in the Pleasant Street median in the vicinity of Old Portland Road.<br />

Summary of Options 110


Raised-Median Islands: Options 1, 1A, 2, and 2A consider reducing congestion<br />

and left-turning vehicle conflicts along Pleasant Street by introducing raisedmedian<br />

islands through the<br />

entire length of the<br />

Feasibility Study corridor. By<br />

introducing median islands,<br />

vehicles in the left through<br />

lanes, for the most part, are<br />

unimpeded. Exclusive leftturn<br />

lanes also are added at<br />

the signalized intersections<br />

to further facilitate free flow<br />

of the through lanes.<br />

Vehicles entering the<br />

Pleasant Street traffic flow from adjoining driveways and minor side streets will<br />

likely experience less delay than under current conditions because left turns from<br />

those locations are prohibited by the medians. It is expected that side- and rearimpact<br />

crash rates will be reduced because the raised medians effectively<br />

eliminate uncontrolled left turns across traffic. The medians force vehicles to<br />

reverse direction at signalized intersections, through roundabouts, or by utilizing<br />

the proposed local connector roadways.<br />

Connector Roadways: All five Feasibility Study options include off-corridor<br />

local connector roadways that provide alternative access to businesses and other<br />

existing secondary roadways. These connector roadways also provide partial<br />

alternative routes for bicyclists who do not wish to ride along Pleasant Street.<br />

The connector roadways, as envisioned, require acquisition of private property<br />

but also benefit the adjoining businesses and the Study Area as a whole.<br />

Specifically, the connector roadways in the Study Area consist of the following:<br />

o<br />

o<br />

Connector A: This three-legged, two-lane road on the south side of<br />

Pleasant Street forms a fourth leg at the Range Road/Pleasant Street<br />

intersection. It extends 500 feet to the south along the property line<br />

between two businesses to form a T intersection with the other two legs<br />

that extend east–west along the edge of the Lower Road Rail Line ROW.<br />

From the T intersection, Connector A extends 400 feet to the east to<br />

connect to Owen Street and 1,150 feet to the west and north to connect to<br />

Pleasant Street. The intersection with Pleasant Street is right-in/right-out<br />

due to a median that prevents left turns. Connector A is not proposed in<br />

Option 3 because that option does not have a median to limit access at<br />

the west end of the connector.<br />

Connector B: This is an approximate 600-foot-long roadway that<br />

connects Westminster Avenue to Pleasant Street to form a four-way<br />

intersection opposite Church Road. This connector is evaluated in all<br />

Summary of Options 111


four options, and the maximum benefit is derived when Connector C<br />

also is constructed.<br />

o<br />

o<br />

o<br />

o<br />

Connector C: This is an approximate 300-foot-long roadway that crosses<br />

private property to connect the east end of Westminster Avenue to River<br />

Road. Connectors B and C <strong>com</strong>bined with Westminster Avenue and<br />

River Road form a new off-corridor alternate route as well as enhanced<br />

access to local businesses. In Options 1A and 2A, Connector C is shorter<br />

but provides similar connectivity to River Road.<br />

Connector D: This is an approximate 900-foot-long east–west roadway<br />

that connects Paul Street end-to-end to Turner Street.<br />

Connector E: This is an approximate 350-foot-long east–west roadway<br />

that connects Turner Street to Summer Street.<br />

Connector F: This is an approximate 100-foot-long roadway that forms a<br />

fourth leg of the Pleasant Street/Mill Street/Stanwood Street<br />

intersection. It provides alternative access through a signalized<br />

intersection for <strong>com</strong>mercial development along Pleasant Street.<br />

Constructing all three south-side Connectors A, D, and E results in an alternative<br />

route that runs parallel to Pleasant Street for approximately 0.8 mile. This route is<br />

connected to Pleasant Street by eight existing or proposed public roads, and it<br />

adjoins approximately fifty parcels of land along the way. The expected benefits<br />

include reduced congestion on Pleasant Street, alternative access to businesses,<br />

and enhanced alternative bicycle connectivity.<br />

Pedestrian Ac<strong>com</strong>modations: All five Feasibility Study options include<br />

improved sidewalks along Pleasant Street. Primarily, this entails adding<br />

sidewalks in areas where none currently exist. An example is the sidewalk<br />

proposed in all of the options between Pleasant Street and Old Portland Road.<br />

The sidewalk currently ends at the Comfort Inn driveway and does not connect<br />

to Old Portland Road. Sidewalk improvements also are expected as part of the<br />

access-management improvements discussed herein because reducing driveway<br />

openings will result in a proportional increase in sidewalks.<br />

Pedestrian crosswalks also are added at roundabouts and signalized<br />

intersections to improve pedestrian access and mobility across Pleasant Street.<br />

The only existing marked crosswalk across Pleasant Street is at the River Road<br />

signalized intersection. The roundabouts proposed in Options 1 and 1A have<br />

two-lane entries and exits. The 2010 draft U.S. Department of Transportation<br />

(USDOT) Public Right-of-Way Accessibility Guidelines document contains<br />

provisions for signalizing two-lane roundabout pedestrian crossings; however,<br />

this Study assumes unsignalized roundabout pedestrian crossings.<br />

Summary of Options 112


Access Management: All five Feasibility Study options include access<br />

improvements with the intention of minimizing motorist conflicts and the<br />

associated safety concerns and congestion. Approximately 60 <strong>com</strong>mercial<br />

driveways are located along Pleasant Street, and the envisioned improvements<br />

include formalizing and standardizing driveway entrances wherever possible.<br />

Access management also includes minimizing, <strong>com</strong>bining, and/or eliminating<br />

driveways wherever appropriate and wherever cross access between businesses<br />

can be arranged. The connector roads described herein are considered a<br />

<strong>com</strong>ponent of access management because they provide alternative off-corridor<br />

access to businesses and side streets.<br />

The following subsections describe the unique features of the five Strategy 2B options<br />

that were not previously discussed in Section 4.8.1.<br />

4.8.2 Option 1<br />

Option 1 (Figure 4-11) involves maintaining the existing four travel lanes and<br />

shoulders on Pleasant Street<br />

throughout the Study Area. The<br />

typical roadway section includes<br />

a raised median and sidewalks,<br />

as described previously.<br />

A distinguishing feature of<br />

Option 1 is that it includes twolane<br />

roundabouts at the Pleasant<br />

Street/Church Road and<br />

Pleasant Street/River Road<br />

intersections. Option 1 also includes signalized intersections at the Pleasant<br />

Street/Range Road and the Pleasant Street/Mill Street intersections. Exclusive leftturn<br />

lanes are provided on Pleasant Street at the signalized intersections.<br />

4.8.3 Option 1A<br />

Option 1A (Figure 4-12) differs from<br />

Option 1 only in that the existing Pleasant<br />

Street/River Road intersection is relocated<br />

approximately 450 feet to the west. This is<br />

ac<strong>com</strong>plished by constructing a new<br />

connector from River Road to the new<br />

intersection, which is controlled by a twolane<br />

roundabout. This option is primarily<br />

contingent on the inclusion of Connector<br />

Road D because it is a feeder road to the<br />

Summary of Options 113


oundabout from the south. This option also provides more balanced spacing of the<br />

River Road intersection between the Church Road and Mill Street intersections.<br />

4.8.4 Option 2<br />

Option 2 (Figure 4-13) is similar to<br />

Option 1 in that it involves<br />

maintaining the existing four travel<br />

lanes and shoulders on Pleasant<br />

Street. The typical roadway section<br />

includes a raised median and<br />

sidewalks, as described previously.<br />

The primary distinguishing feature is<br />

that Option 2 has a series of four<br />

signalized intersections, and the only<br />

roundabout is the two-lane gateway<br />

roundabout at Old Portland Road.<br />

The signalized Pleasant Street intersections are at Range Road, Church Road, River<br />

Road, and Mill Street. Each intersection includes exclusive left-turn lanes on Pleasant<br />

Street and crosswalks for pedestrians to cross Pleasant Street and the side roads.<br />

4.8.5 Option 2A<br />

Option 2A (Figure 4-12) differs from<br />

Option 2 only in that the existing<br />

Pleasant Street/River Road<br />

intersection is relocated<br />

approximately 450 feet to the west.<br />

This is ac<strong>com</strong>plished by constructing<br />

connectors from both River Road and<br />

Connector Road D to the new<br />

signalized intersection. As in Option<br />

1A, this option provides more<br />

balanced spacing of the River Road<br />

intersection between the Church<br />

Road and Mill Street intersections.<br />

Summary of Options 114


4.8.6 Option 3<br />

Option 3 (Figure 4-14) improves mobility along the corridor by creating a continuous<br />

five-lane cross section without raised medians. The center lane consists of exclusive<br />

left-turn lanes at the signalized intersections and a two-way center turn lane<br />

(TWCTL) for the remainder of the corridor. The TWCTL lane helps remove leftturning<br />

vehicles from the through lanes, thereby reducing congestion and rear-end<br />

crashes. Construction of the center lane requires minor roadway widening because<br />

shoulders and sidewalks are still provided on both sides of the road. The<br />

intersections are controlled by traffic signals, similar to Option 2.<br />

Summary of Options 115


MAP-U25<br />

LOT-20<br />

Bailey Ln<br />

Ln<br />

B ailey<br />

MAP-16 LOT-20<br />

MAP-U25<br />

LOT-19<br />

Legend<br />

MAP-16<br />

LOT-29<br />

Railroad<br />

MAP-16 LOT-1<br />

Existing Conservation Land<br />

Parcel Boundary<br />

MAP-16 LOT-30<br />

Proposed Travel Way<br />

MAP-16 LOT-2<br />

Proposed Connector Road<br />

MAP-U34 LOT-23<br />

MAP-U33<br />

LOT-26<br />

MAP-U33<br />

LOT-27<br />

MAP-U33<br />

LOT-28<br />

MAP-U33<br />

LOT-26C<br />

MAP-U33<br />

LOT-26B<br />

MAP-U33<br />

LOT-26A<br />

MAP-U33<br />

LOT-25<br />

Range Rd<br />

MAP-U25 LOT-1<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

MAP-U34<br />

LOT-15<br />

MAP-U34<br />

LOT-14<br />

MAP-U34<br />

LOT-13<br />

MAP-U33<br />

LOT-24<br />

MAP-U33<br />

LOT-23<br />

MAP-U33 LOT-20<br />

MAP-U33<br />

LOT-19<br />

MAP-U33<br />

LOT-18<br />

MAP-U33<br />

LOT-16<br />

MAP-U33<br />

LOT-14<br />

MAP-U33<br />

LOT-15<br />

MAP-U33<br />

LOT-13<br />

MAP-U33<br />

LOT-12<br />

Pleasant St<br />

MAP-U33 LOT-5<br />

MAP-U33<br />

LOT-1<br />

MAP-U26 LOT-37<br />

S<br />

MAP-U26<br />

LOT-39<br />

MAP-U26<br />

LOT-42<br />

MAP-U26<br />

LOT-41<br />

MAP-U26<br />

LOT-25<br />

S<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalk<br />

Proposed Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

MAP-U34 LOT-7<br />

MAP-U34<br />

LOT-6B<br />

£¤ 1<br />

Old Portland Rd<br />

MAP-U34 LOT-4<br />

MAP-U34<br />

LOT-2<br />

MAP-U34<br />

LOT-1<br />

MAP-U34 LOT-3<br />

MAP-U33<br />

LOT-437<br />

MAP-U33 LOT-436<br />

MAP-U33<br />

LOT-435B<br />

MAP-U33<br />

LOT-435<br />

MAP-U33 LOT-434<br />

MAP-U33<br />

LOT-433<br />

MAP-U33 LOT-430<br />

Connector A<br />

MAP-U26<br />

LOT-35<br />

MAP-U26<br />

LOT-33<br />

MAP-U26 LOT-34<br />

MAP-U26<br />

LOT-30<br />

Robinson Ave<br />

MAP-U26<br />

LOT-30A<br />

MAP-U26<br />

LOT-29B<br />

MAP-U26<br />

LOT-29C<br />

MAP-U26<br />

LOT-25A<br />

MAP-U26<br />

LOT-26<br />

MAP-U26<br />

LOT-29A<br />

l<br />

MAP-17 LOT-6<br />

Lower Road Rail Line<br />

Marriner Rd<br />

0 300 600 Feet<br />

MAP-17 LOT-59<br />

MAP-17 LOT-58<br />

MAP-17<br />

LOT-57<br />

MAP-17<br />

LOT-50<br />

MAP-17<br />

LOT-25<br />

MAP-U31<br />

LOT-36A<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-11 (Sheet 1 of 2)<br />

Strategy 2B, Option 1<br />

Traffic Calming Boulevard<br />

Bibber Pkwy<br />

MAP-17 LOT-56<br />

MAP-17<br />

LOT-52<br />

MAP-17 LOT-19<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

MAP-17 LOT-53<br />

MAP-17 LOT-44<br />

Industrial Pkwy<br />

MAP-17 LOT-43<br />

MAP-17<br />

LOT-42<br />

MAP-17<br />

LOT-48<br />

MAP-17<br />

LOT-24<br />

MAP-17<br />

LOT-71<br />

MAP-U31<br />

LOT-35<br />

MAP-U31 LOT-5<br />

MAP-U31 LOT-4<br />

MAP-U31<br />

LOT-3<br />

MAP-U31<br />

LOT-209<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


MAP-U25<br />

LOT-20<br />

MAP-16 LOT-1<br />

Bailey<br />

Ln<br />

B ailey<br />

MAP-U25<br />

LOT-19<br />

MAP-U25<br />

LOT-21<br />

Ln<br />

MAP-U25<br />

LOT-18<br />

MAP-U25<br />

LOT-22<br />

MAP-U25<br />

LOT-17<br />

MAP-U25<br />

LOT-16<br />

Bailey Ln<br />

MAP-U25<br />

LOT-15<br />

MAP-U25<br />

LOT-14<br />

MAP-U25<br />

LOT-13<br />

MAP-U25<br />

LOT-1B<br />

MAP-U24<br />

LOT-44<br />

MAP-U24 LOT-6<br />

MAP-U24<br />

LOT-6A<br />

MAP-U24 LOT-5<br />

MAP-U24<br />

LOT-2A<br />

MAP-U26<br />

LOT-39<br />

MAP-U26<br />

LOT-34<br />

Marriner Rd<br />

MAP-U31<br />

LOT-5<br />

MAP-U26<br />

LOT-30<br />

Robinson Ave<br />

MAP-U26<br />

LOT-30A<br />

MAP-U31<br />

LOT-36A<br />

MAP-U26<br />

LOT-29B<br />

MAP-U26<br />

LOT-29C<br />

MAP-U26<br />

LOT-41<br />

MAP-U26<br />

LOT-25<br />

MAP-U26<br />

LOT-25A<br />

MAP-U26<br />

LOT-29A<br />

MAP-17 LOT-25<br />

MAP-U26<br />

LOT-26<br />

MAP-U26<br />

LOT-28<br />

MAP-17 LOT-6<br />

MAP-U31<br />

LOT-3<br />

MAP-U26<br />

LOT-42<br />

MAP-U26<br />

LOT-24<br />

MAP-U26 LOT-27<br />

MAP-U31<br />

LOT-207<br />

MAP-U26<br />

LOT-28A<br />

Owen St<br />

MAP-U26<br />

LOT-16<br />

MAP-U31 LOT-2<br />

MAP-U31<br />

LOT-206<br />

MAP-U26<br />

LOT-22<br />

Church Rd<br />

MAP-U26 LOT-14<br />

MAP-U31<br />

LOT-225<br />

MAP-U26<br />

LOT-46<br />

MAP-U26<br />

LOT-13B<br />

MAP-U26<br />

LOT-12<br />

MAP-U31<br />

LOT-105<br />

MAP-U31<br />

MAP-U31<br />

LOT-239<br />

LOT-224<br />

THESE PLANS DEPICT CONCEPTUAL MAP-U31 IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

MAP-U31 LOT-4<br />

LOT-238<br />

MAP-U31<br />

MAP-U31<br />

DECISIONS HAVE BEEN MADE WITH<br />

MAP-U31<br />

MAP-U31 REGARD TO POTENTIAL PROPERTY<br />

LOT-226<br />

LOT-113<br />

ACQUISITION. LOT-208<br />

LOT-240<br />

MAP-U31<br />

LOT-237<br />

MAP-U25 LOT-1<br />

MAP-U31<br />

LOT-205<br />

MAP-U26<br />

LOT-43<br />

MAP-U31<br />

LOT-241<br />

MAP-U31<br />

LOT-204<br />

MAP-U31 LOT-1<br />

MAP-U31<br />

LOT-203<br />

MAP-U26<br />

LOT-44<br />

MAP-U26<br />

LOT-20<br />

MAP-U26<br />

LOT-13<br />

MAP-U31<br />

LOT-202<br />

MAP-U31<br />

LOT-227<br />

MAP-U26<br />

LOT-6<br />

MAP-U31<br />

LOT-201<br />

MAP-U31<br />

LOT-223<br />

MAP-U24 LOT-7<br />

MAP-U26<br />

LOT-5<br />

MAP-U26<br />

LOT-47<br />

Connector B<br />

Paul St<br />

MAP-U26 LOT-10<br />

MAP-U31<br />

LOT-12<br />

MAP-U31<br />

LOT-104<br />

MAP-U31<br />

LOT-106<br />

MAP-U24<br />

LOT-14<br />

MAP-U26 LOT-49<br />

MAP-U26 LOT-3<br />

MAP-U26<br />

LOT-15<br />

MAP-U31<br />

LOT-103<br />

MAP-U31<br />

LOT-107<br />

MAP-U31<br />

LOT-112<br />

MAP-U24 LOT-4<br />

Lavalley Ave<br />

MAP-U26 LOT-18<br />

MAP-U28<br />

LOT-107<br />

MAP-U31<br />

LOT-108<br />

MAP-U26<br />

LOT-50<br />

MAP-U31<br />

LOT-111<br />

MAP-U26<br />

LOT-9<br />

River Rd<br />

Westminster Ave<br />

MAP-U23<br />

LOT-71<br />

MAP-U28<br />

LOT-106<br />

MAP-U31<br />

LOT-116<br />

MAP-U23<br />

LOT-65<br />

MAP-U28<br />

LOT-104<br />

MAP-U23<br />

LOT-58<br />

MAP-U28<br />

LOT-88<br />

MAP-U28<br />

LOT-89<br />

MAP-U23<br />

LOT-66<br />

MAP-U23<br />

LOT-57<br />

MAP-U26<br />

LOT-7<br />

MAP-U28<br />

LOT-1A<br />

MAP-U28<br />

LOT-105<br />

MAP-U28<br />

LOT-102<br />

MAP-U28<br />

LOT-87<br />

MAP-U23<br />

LOT-62<br />

MAP-U23<br />

LOT-57A<br />

MAP-U28<br />

LOT-103<br />

MAP-U28<br />

LOT-86<br />

MAP-U24 LOT-3<br />

MAP-U23<br />

LOT-67<br />

Westminster<br />

MAP-U23<br />

LOT-56<br />

MAP-U28<br />

LOT-101<br />

MAP-U24<br />

LOT-2B<br />

MAP-U24 LOT-1<br />

MAP-U28<br />

LOT-100<br />

MAP-U23<br />

LOT-68<br />

MAP-U28<br />

LOT-84<br />

MAP-U23 LOT-55A<br />

MAP-U24<br />

LOT-2C<br />

Connector C<br />

Connector D<br />

Lower Road Rail Line<br />

MAP-U28<br />

LOT-85<br />

MAP-U23<br />

LOT-69<br />

MAP-U28<br />

LOT-99<br />

MAP-U28<br />

LOT-98<br />

MAP-U28<br />

LOT-82<br />

MAP-U28<br />

LOT-83<br />

MAP-U28<br />

LOT-97<br />

MAP-U28<br />

LOT-96<br />

MAP-U28<br />

LOT-117<br />

MAP-U23<br />

LOT-78<br />

MAP-U28<br />

LOT-80<br />

MAP-U23 LOT-50<br />

MAP-U28<br />

LOT-95<br />

MAP-U28<br />

LOT-81<br />

MAP-U23 LOT-87<br />

MAP-U28<br />

LOT-94<br />

MAP-U28<br />

LOT-118<br />

MAP-U28<br />

LOT-78<br />

MAP-U23<br />

LOT-79<br />

MAP-U23<br />

LOT-48<br />

MAP-U28<br />

LOT-93<br />

MAP-U28<br />

LOT-79<br />

MAP-U28<br />

LOT-92<br />

MAP-U28<br />

LOT-119<br />

MAP-U28<br />

LOT-91<br />

MAP-U28<br />

LOT-76<br />

MAP-U28<br />

LOT-120<br />

MAP-U23<br />

LOT-47<br />

MAP-U28<br />

LOT-3<br />

Bouchard Dr<br />

MAP-U28<br />

LOT-90<br />

MAP-U28<br />

LOT-77<br />

MAP-U28<br />

LOT-74<br />

MAP-U23 LOT-83<br />

MAP-U28<br />

LOT-75<br />

MAP-U28<br />

LOT-121<br />

MAP-U28<br />

LOT-25<br />

MAP-U23<br />

LOT-46<br />

MAP-U23<br />

LOT-93<br />

MAP-U23 LOT-92<br />

MAP-U28 LOT-7<br />

MAP-U28<br />

LOT-4<br />

MAP-U28<br />

LOT-26<br />

MAP-U28<br />

LOT-48<br />

MAP-U28<br />

LOT-24<br />

MAP-U28<br />

LOT-27<br />

MAP-U28<br />

LOT-49<br />

MAP-U28<br />

LOT-47<br />

MAP-U28<br />

LOT-50<br />

MAP-U23<br />

LOT-28<br />

MAP-U23<br />

LOT-18<br />

MAP-U28<br />

LOT-6<br />

MAP-U28<br />

LOT-22<br />

MAP-U23<br />

LOT-94<br />

MAP-U23<br />

LOT-31<br />

MAP-U28<br />

LOT-29<br />

MAP-U23<br />

LOT-30<br />

Webster St<br />

MAP-U23<br />

LOT-29<br />

MAP-U28<br />

LOT-45<br />

MAP-U23<br />

LOT-41<br />

MAP-U23<br />

LOT-32<br />

MAP-U23<br />

LOT-33<br />

Turner St<br />

MAP-U23<br />

LOT-17<br />

MAP-U28<br />

LOT-21<br />

MAP-U28<br />

LOT-8<br />

MAP-U23<br />

LOT-89<br />

MAP-U23<br />

LOT-16<br />

MAP-U28<br />

LOT-9<br />

MAP-U28<br />

LOT-31<br />

MAP-U28<br />

LOT-30<br />

MAP-U28<br />

LOT-52<br />

MAP-U28<br />

LOT-53<br />

MAP-U28<br />

LOT-167<br />

MAP-U23<br />

LOT-34<br />

MAP-U23<br />

LOT-34A<br />

MAP-U28 MAP-U28<br />

LOT-20 LOT-19<br />

MAP-U28<br />

LOT-44<br />

MAP-U28<br />

LOT-43<br />

MAP-U28<br />

LOT-32<br />

MAP-U28<br />

LOT-54<br />

MAP-U23<br />

LOT-40<br />

MAP-U28<br />

LOT-42<br />

MAP-U23<br />

LOT-37<br />

MAP-U23<br />

LOT-36<br />

MAP-U28<br />

LOT-55<br />

MAP-U23<br />

LOT-90<br />

Lombard St<br />

MAP-U23<br />

LOT-35<br />

MAP-U23<br />

LOT-15<br />

MAP-U28 LOT-14<br />

MAP-U28<br />

LOT-33<br />

MAP-U23 LOT-8<br />

MAP-U23<br />

LOT-9<br />

MAP-U23<br />

LOT-10<br />

MAP-U28<br />

LOT-35<br />

MAP-U28<br />

LOT-34<br />

MAP-U28<br />

LOT-41<br />

MAP-U23<br />

LOT-11<br />

MAP-U15<br />

LOT-117<br />

MAP-U23<br />

LOT-5<br />

Town of Topsham<br />

Androscoggin River<br />

MAP-U23<br />

LOT-3<br />

Town of Brunswick<br />

Summer St<br />

Connector E<br />

MAP-U23 LOT-14<br />

MAP-U28<br />

LOT-36<br />

MAP-U28<br />

LOT-40<br />

MAP-U28<br />

LOT-69<br />

MAP-U28<br />

LOT-39<br />

MAP-U28<br />

LOT-37<br />

MAP-U23<br />

LOT-4<br />

MAP-U28<br />

LOT-38<br />

MAP-U28<br />

LOT-73<br />

Connector F<br />

MAP-U15<br />

LOT-118<br />

MAP-U15<br />

LOT-102<br />

MAP-U15<br />

LOT-104<br />

MAP-U15 LOT-108<br />

MAP-U22<br />

LOT-101<br />

MAP-U15<br />

LOT-107B<br />

MAP-U22<br />

LOT-102<br />

MAP-U22<br />

LOT-86<br />

MAP-U15<br />

LOT-107<br />

MAP-U15 LOT-123<br />

MAP-U15<br />

LOT-119<br />

MAP-U15<br />

LOT-105<br />

MAP-U15 LOT-106<br />

MAP-U22<br />

LOT-107<br />

MAP-U22<br />

LOT-108<br />

MAP-U22<br />

LOT-104<br />

MAP-U22<br />

LOT-96<br />

MAP-U22<br />

LOT-88<br />

MAP-U22<br />

LOT-62<br />

MAP-U22<br />

MAP-U22<br />

LOT-66<br />

LOT-65<br />

MAP-U15<br />

LOT-120<br />

MAP-U15<br />

LOT-99<br />

MAP-U15<br />

LOT-116<br />

MAP-U15<br />

LOT-115A<br />

MAP-U15<br />

LOT-113A<br />

MAP-U15<br />

LOT-110<br />

MAP-U15<br />

LOT-115<br />

MAP-U15<br />

LOT-114<br />

MAP-U15<br />

LOT-113<br />

S<br />

MAP-U15<br />

LOT-112<br />

MAP-U15<br />

LOT-111<br />

MAP-U22<br />

LOT-94<br />

MAP-U22<br />

LOT-89<br />

MAP-U22<br />

LOT-68<br />

Stanwood St<br />

MAP-U22<br />

LOT-106<br />

MAP-U22<br />

LOT-59<br />

MAP-U22<br />

LOT-60<br />

MAP-U22<br />

LOT-93<br />

MAP-U15<br />

LOT-76<br />

MAP-U22<br />

LOT-92<br />

MAP-U22<br />

LOT-91<br />

MAP-U15<br />

LOT-77<br />

MAP-U15<br />

LOT-124<br />

MAP-U15 LOT-79<br />

MAP-U22<br />

LOT-58<br />

MAP-U15 LOT-81<br />

MAP-U22<br />

LOT-10<br />

MAP-U15<br />

LOT-47<br />

MAP-U15 LOT-80<br />

MAP-U22<br />

LOT-56<br />

MAP-U15<br />

LOT-78<br />

MAP-U15<br />

LOT-82<br />

MAP-U22<br />

LOT-1<br />

MAP-U22<br />

LOT-54<br />

MAP-U15<br />

LOT-53<br />

MAP-U15<br />

LOT-54<br />

MAP-U15<br />

LOT-75<br />

MAP-U15<br />

LOT-83<br />

MAP-U22<br />

LOT-19<br />

MAP-U22<br />

LOT-2<br />

MAP-U22<br />

LOT-20<br />

MAP-U22<br />

LOT-47<br />

Legend<br />

Sage Hill<br />

S<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Connector Road<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalk<br />

Proposed Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

l<br />

0 300 600 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-11 (Sheet 2 of 2)<br />

Strategy 2B, Option 1<br />

Traffic Calming Boulevard<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


MAP-U24 LOT-2A<br />

River Rd<br />

MAP-U24 LOT-2B<br />

Traffic Calming Boulevard<br />

MAP-U24 LOT-2A<br />

River Rd<br />

MAP-U24 LOT-2B<br />

Urban Boulevard<br />

MAP-U24 LOT-3<br />

MAP-U24 LOT-3<br />

Legend<br />

MAP-U24 LOT-2C<br />

MAP-U24 LOT-2C<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

MAP-U24 LOT-1<br />

MAP-U23<br />

LOT-94<br />

MAP-U24 LOT-1<br />

MAP-U23<br />

LOT-94<br />

Proposed Connector Road<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

MAP-U23<br />

LOT-67<br />

inster Ave<br />

MAP-U23<br />

LOT-62<br />

MAP-U23<br />

LOT-68<br />

MAP-U23<br />

LOT-74<br />

MAP-U23<br />

LOT-73<br />

MAP-U23<br />

LOT-69<br />

MAP-U23<br />

LOT-72<br />

MAP-U23<br />

LOT-70<br />

MAP-U23 LOT-87<br />

Connector C<br />

MAP-U23 LOT-78<br />

MAP-U23 LOT-83<br />

MAP-U23<br />

LOT-89<br />

MAP-U23<br />

LOT-67<br />

Westminster Ave<br />

MAP-U23<br />

LOT-62<br />

MAP-U23<br />

LOT-68<br />

MAP-U23<br />

LOT-74<br />

MAP-U23<br />

LOT-73<br />

MAP-U23<br />

LOT-69<br />

MAP-U23<br />

LOT-72<br />

MAP-U23<br />

LOT-70<br />

MAP-U23 LOT-87<br />

Connector C<br />

MAP-U23 LOT-78<br />

MAP-U23 LOT-83<br />

MAP-U23<br />

LOT-89<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines<br />

Proposed Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Westminster<br />

Westminster<br />

MAP-U23<br />

LOT-60<br />

MAP-U23<br />

LOT-75<br />

MAP-U23<br />

LOT-76<br />

MAP-U23<br />

LOT-77<br />

MAP-U23<br />

LOT-79<br />

MAP-U23<br />

LOT-43<br />

MAP-U23<br />

LOT-42<br />

MAP-U23<br />

LOT-41<br />

MAP-U23<br />

LOT-60<br />

MAP-U23<br />

LOT-75<br />

MAP-U23<br />

LOT-76<br />

MAP-U23<br />

LOT-77<br />

MAP-U23<br />

LOT-79<br />

S<br />

MAP-U23<br />

LOT-43<br />

MAP-U23<br />

LOT-42<br />

MAP-U23<br />

LOT-41<br />

S<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

MAP-U23<br />

LOT-57<br />

MAP-U23<br />

LOT-57A<br />

MAP-U23<br />

LOT-56<br />

MAP-U23<br />

LOT-55<br />

MAP-U23 LOT-55A<br />

MAP-U23<br />

LOT-54<br />

MAP-U23<br />

LOT-50<br />

MAP-U23<br />

LOT-48<br />

Lower Road Rail Line<br />

MAP-U28 LOT-1A<br />

MAP-U28<br />

LOT-93<br />

MAP-U28<br />

LOT-91<br />

MAP-U23<br />

LOT-47<br />

Connector D<br />

MAP-U23<br />

LOT-93<br />

MAP-U23 LOT-92<br />

MAP-U28 LOT-3<br />

MAP-U23<br />

LOT-46<br />

MAP-U23<br />

LOT-25<br />

MAP-U23<br />

LOT-20<br />

MAP-U23<br />

LOT-26<br />

MAP-U23<br />

LOT-19<br />

MAP-U23<br />

LOT-45<br />

MAP-U23<br />

LOT-44<br />

MAP-U23<br />

LOT-18<br />

MAP-U23<br />

LOT-28<br />

MAP-U28 LOT-6<br />

MAP-U23<br />

LOT-31<br />

MAP-U28 LOT-7<br />

MAP-U23<br />

LOT-30<br />

Webster St<br />

MAP-U23<br />

LOT-29<br />

MAP-U23<br />

LOT-32<br />

MAP-U23<br />

LOT-33<br />

Turner St<br />

MAP-U23<br />

LOT-17<br />

MAP-U28<br />

LOT-8<br />

MAP-U23<br />

LOT-34<br />

MAP-U23<br />

LOT-34A<br />

MAP-U28<br />

LOT-9<br />

MAP-U23<br />

LOT-57<br />

MAP-U23<br />

LOT-57A<br />

MAP-U23<br />

LOT-56<br />

MAP-U23<br />

LOT-55<br />

MAP-U23 LOT-55A<br />

MAP-U23<br />

LOT-54<br />

Lower Road Rail Line<br />

MAP-U28 LOT-1A<br />

MAP-U23<br />

LOT-50<br />

MAP-U23<br />

LOT-48<br />

MAP-U28<br />

LOT-93<br />

MAP-U28<br />

LOT-91<br />

MAP-U23<br />

LOT-47<br />

Connector D<br />

MAP-U23<br />

LOT-93<br />

MAP-U23 LOT-92<br />

MAP-U28 LOT-3<br />

MAP-U23<br />

LOT-46<br />

MAP-U23<br />

LOT-25<br />

MAP-U23<br />

LOT-20<br />

MAP-U23<br />

LOT-26<br />

MAP-U23<br />

LOT-19<br />

MAP-U23<br />

LOT-45<br />

MAP-U23<br />

LOT-44<br />

MAP-U23<br />

LOT-18<br />

MAP-U23<br />

LOT-28<br />

MAP-U28 LOT-6<br />

MAP-U23<br />

LOT-31<br />

MAP-U28 LOT-7<br />

MAP-U23<br />

LOT-30<br />

Webster St<br />

MAP-U23<br />

LOT-29<br />

MAP-U23<br />

LOT-32<br />

MAP-U23<br />

LOT-33<br />

Turner St<br />

MAP-U23<br />

LOT-17<br />

MAP-U28<br />

LOT-8<br />

MAP-U23<br />

LOT-34<br />

MAP-U23<br />

LOT-34A<br />

MAP-U28<br />

LOT-9<br />

l<br />

0 200 400 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-12<br />

Strategy 2B Option 1A/2A<br />

Relocated River Rd<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS<br />

MAP-U28 LOT-4<br />

MAP-U28 LOT-4<br />

MAP-U28<br />

LOT-97<br />

MAP-U28<br />

LOT-95<br />

MAP-U28 LOT-20<br />

MAP-U28<br />

LOT-97<br />

MAP-U28<br />

LOT-95<br />

MAP-U28 LOT-20


MAP-U25<br />

LOT-20<br />

Bailey Ln<br />

Ln<br />

B ailey<br />

MAP-16 LOT-20<br />

MAP-U25<br />

LOT-19<br />

Legend<br />

MAP-16<br />

LOT-29<br />

Railroad<br />

MAP-16 LOT-1<br />

Existing Conservation Land<br />

Parcel Boundary<br />

MAP-16 LOT-30<br />

Proposed Travel Way<br />

MAP-16 LOT-2<br />

Proposed Connector Road<br />

MAP-U34 LOT-23<br />

MAP-U33<br />

LOT-26<br />

MAP-U33<br />

LOT-27<br />

MAP-U33<br />

LOT-28<br />

MAP-U33<br />

LOT-26C<br />

MAP-U33<br />

LOT-26B<br />

MAP-U33<br />

LOT-26A<br />

MAP-U33<br />

LOT-25<br />

Range Rd<br />

MAP-U25 LOT-1<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

MAP-U34<br />

LOT-15<br />

MAP-U34<br />

LOT-14<br />

MAP-U34<br />

LOT-13<br />

MAP-U33<br />

LOT-24<br />

MAP-U33<br />

LOT-23<br />

MAP-U33 LOT-20<br />

MAP-U33<br />

LOT-19<br />

MAP-U33<br />

LOT-18<br />

MAP-U33<br />

LOT-16<br />

MAP-U33<br />

LOT-14<br />

MAP-U33<br />

LOT-15<br />

MAP-U33<br />

LOT-13<br />

MAP-U33<br />

LOT-12<br />

Pleasant St<br />

MAP-U33 LOT-5<br />

MAP-U33<br />

LOT-1<br />

MAP-U26 LOT-37<br />

S<br />

MAP-U26<br />

LOT-39<br />

MAP-U26<br />

LOT-42<br />

MAP-U26<br />

LOT-41<br />

MAP-U26<br />

LOT-25<br />

S<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalks, Etc<br />

Proposed Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

MAP-U34 LOT-7<br />

MAP-U34<br />

LOT-6B<br />

£¤ 1<br />

Old Portland Rd<br />

MAP-U34 LOT-4<br />

MAP-U34<br />

LOT-2<br />

MAP-U34<br />

LOT-1<br />

MAP-U34 LOT-3<br />

MAP-U33<br />

LOT-437<br />

MAP-U33 LOT-436<br />

MAP-U33<br />

LOT-435B<br />

MAP-U33<br />

LOT-435<br />

MAP-U33 LOT-434<br />

MAP-U33<br />

LOT-433<br />

MAP-U33 LOT-430<br />

Connector A<br />

MAP-U26<br />

LOT-35<br />

MAP-U26<br />

LOT-33<br />

MAP-U26 LOT-34<br />

MAP-U26<br />

LOT-30<br />

Robinson Ave<br />

MAP-U26<br />

LOT-30A<br />

MAP-U26<br />

LOT-29B<br />

MAP-U26<br />

LOT-29C<br />

MAP-U26<br />

LOT-25A<br />

MAP-U26<br />

LOT-26<br />

MAP-U26<br />

LOT-29A<br />

l<br />

MAP-17 LOT-6<br />

Lower Road Rail Line<br />

Marriner Rd<br />

0 300 600 Feet<br />

MAP-17 LOT-59<br />

MAP-17 LOT-58<br />

MAP-17<br />

LOT-57<br />

MAP-17<br />

LOT-50<br />

MAP-17<br />

LOT-25<br />

MAP-U31<br />

LOT-36A<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-13 (Sheet 1 of 2)<br />

Strategy 2B, Option 2<br />

Urban Boulevard<br />

Bibber Pkwy<br />

MAP-17 LOT-56<br />

MAP-17<br />

LOT-52<br />

MAP-17 LOT-19<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

MAP-17 LOT-53<br />

MAP-17 LOT-44<br />

Industrial Pkwy<br />

MAP-17 LOT-43<br />

MAP-17<br />

LOT-42<br />

MAP-17<br />

LOT-48<br />

MAP-17<br />

LOT-24<br />

MAP-17<br />

LOT-71<br />

MAP-U31<br />

LOT-35<br />

MAP-U31 LOT-5<br />

MAP-U31 LOT-4<br />

MAP-U31<br />

LOT-3<br />

MAP-U31<br />

LOT-209<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


MAP-U25<br />

LOT-20<br />

MAP-16 LOT-1<br />

Bailey<br />

Ln<br />

B ailey<br />

MAP-U25<br />

LOT-19<br />

MAP-U25<br />

LOT-21<br />

Ln<br />

MAP-U25<br />

LOT-18<br />

MAP-U25<br />

LOT-22<br />

MAP-U25<br />

LOT-17<br />

MAP-U25<br />

LOT-16<br />

Bailey Ln<br />

MAP-U25<br />

LOT-15<br />

MAP-U25<br />

LOT-14<br />

MAP-U25<br />

LOT-13<br />

MAP-U25<br />

LOT-1B<br />

MAP-U24<br />

LOT-44<br />

MAP-U24 LOT-6<br />

MAP-U24<br />

LOT-6A<br />

MAP-U24 LOT-5<br />

MAP-U24<br />

LOT-2A<br />

MAP-U26<br />

LOT-39<br />

MAP-U26<br />

LOT-34<br />

Marriner Rd<br />

MAP-U31<br />

LOT-5<br />

MAP-U26<br />

LOT-30<br />

Robinson Ave<br />

MAP-U26<br />

LOT-30A<br />

MAP-U31<br />

LOT-36A<br />

MAP-U26<br />

LOT-29B<br />

MAP-U26<br />

LOT-29C<br />

MAP-U26<br />

LOT-41<br />

MAP-U26<br />

LOT-25<br />

MAP-U26<br />

LOT-25A<br />

MAP-U26<br />

LOT-29A<br />

MAP-17 LOT-25<br />

MAP-U26<br />

LOT-26<br />

MAP-U26<br />

LOT-28<br />

MAP-17 LOT-6<br />

MAP-U31<br />

LOT-3<br />

MAP-U26<br />

LOT-42<br />

MAP-U26<br />

LOT-24<br />

MAP-U26 LOT-27<br />

MAP-U31<br />

LOT-207<br />

MAP-U26<br />

LOT-28A<br />

Owen St<br />

MAP-U26<br />

LOT-16<br />

MAP-U31 LOT-2<br />

MAP-U31<br />

LOT-206<br />

MAP-U26<br />

LOT-22<br />

Church Rd<br />

MAP-U26 LOT-14<br />

MAP-U31<br />

LOT-225<br />

MAP-U26<br />

LOT-46<br />

S<br />

MAP-U26<br />

LOT-13B<br />

MAP-U26<br />

LOT-12<br />

MAP-U31<br />

LOT-105<br />

MAP-U31<br />

MAP-U31<br />

LOT-239<br />

LOT-224<br />

THESE PLANS DEPICT CONCEPTUAL MAP-U31 IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

MAP-U31 LOT-4<br />

LOT-238<br />

MAP-U31<br />

MAP-U31<br />

DECISIONS HAVE BEEN MADE WITH<br />

MAP-U31<br />

MAP-U31 REGARD TO POTENTIAL PROPERTY<br />

LOT-226<br />

LOT-113<br />

ACQUISITION. LOT-208<br />

LOT-240<br />

MAP-U31<br />

LOT-237<br />

MAP-U25 LOT-1<br />

MAP-U31<br />

LOT-205<br />

MAP-U26<br />

LOT-43<br />

MAP-U31<br />

LOT-241<br />

MAP-U31<br />

LOT-204<br />

MAP-U31 LOT-1<br />

MAP-U31<br />

LOT-203<br />

MAP-U26<br />

LOT-44<br />

MAP-U26<br />

LOT-20<br />

MAP-U26<br />

LOT-13<br />

MAP-U31<br />

LOT-202<br />

MAP-U31<br />

LOT-227<br />

MAP-U26<br />

LOT-6<br />

MAP-U31<br />

LOT-201<br />

MAP-U31<br />

LOT-223<br />

MAP-U24 LOT-7<br />

MAP-U26<br />

LOT-5<br />

MAP-U26<br />

LOT-47<br />

Connector B<br />

Paul St<br />

MAP-U26 LOT-10<br />

MAP-U31<br />

LOT-12<br />

MAP-U31<br />

LOT-104<br />

MAP-U31<br />

LOT-106<br />

MAP-U24<br />

LOT-14<br />

MAP-U26 LOT-49<br />

MAP-U26 LOT-3<br />

MAP-U26<br />

LOT-15<br />

MAP-U31<br />

LOT-103<br />

MAP-U31<br />

LOT-107<br />

MAP-U31<br />

LOT-112<br />

MAP-U24 LOT-4<br />

Lavalley Ave<br />

MAP-U26 LOT-18<br />

MAP-U28<br />

LOT-107<br />

MAP-U31<br />

LOT-108<br />

MAP-U26<br />

LOT-50<br />

MAP-U31<br />

LOT-111<br />

MAP-U26<br />

LOT-9<br />

River Rd<br />

Westminster Ave<br />

MAP-U23<br />

LOT-71<br />

MAP-U28<br />

LOT-106<br />

MAP-U31<br />

LOT-116<br />

MAP-U23<br />

LOT-65<br />

MAP-U28<br />

LOT-104<br />

MAP-U23<br />

LOT-58<br />

MAP-U28<br />

LOT-88<br />

MAP-U28<br />

LOT-89<br />

MAP-U23<br />

LOT-66<br />

MAP-U23<br />

LOT-57<br />

MAP-U26<br />

LOT-7<br />

MAP-U28<br />

LOT-1A<br />

MAP-U28<br />

LOT-105<br />

MAP-U28<br />

LOT-102<br />

MAP-U28<br />

LOT-87<br />

MAP-U23<br />

LOT-62<br />

MAP-U23<br />

LOT-57A<br />

MAP-U28<br />

LOT-103<br />

MAP-U28<br />

LOT-86<br />

MAP-U24 LOT-3<br />

MAP-U23<br />

LOT-67<br />

Westminster<br />

MAP-U23<br />

LOT-56<br />

MAP-U28<br />

LOT-101<br />

MAP-U24<br />

LOT-2B<br />

MAP-U24 LOT-1<br />

MAP-U28<br />

LOT-100<br />

MAP-U23<br />

LOT-68<br />

MAP-U28<br />

LOT-84<br />

MAP-U23 LOT-55A<br />

MAP-U24<br />

LOT-2C<br />

Connector C<br />

Connector D<br />

Lower Road Rail Line<br />

MAP-U28<br />

LOT-85<br />

MAP-U23<br />

LOT-69<br />

MAP-U28<br />

LOT-99<br />

MAP-U28<br />

LOT-98<br />

MAP-U28<br />

LOT-82<br />

MAP-U28<br />

LOT-83<br />

MAP-U28<br />

LOT-97<br />

MAP-U28<br />

LOT-96<br />

MAP-U28<br />

LOT-117<br />

MAP-U23<br />

LOT-78<br />

MAP-U28<br />

LOT-80<br />

MAP-U23 LOT-50<br />

MAP-U28<br />

LOT-95<br />

MAP-U28<br />

LOT-81<br />

MAP-U23 LOT-87<br />

MAP-U28<br />

LOT-94<br />

MAP-U28<br />

LOT-118<br />

MAP-U28<br />

LOT-78<br />

MAP-U23<br />

LOT-79<br />

MAP-U23<br />

LOT-48<br />

MAP-U28<br />

LOT-93<br />

MAP-U28<br />

LOT-79<br />

MAP-U28<br />

LOT-92<br />

MAP-U28<br />

LOT-119<br />

MAP-U28<br />

LOT-91<br />

MAP-U28<br />

LOT-76<br />

MAP-U28<br />

LOT-120<br />

MAP-U23<br />

LOT-47<br />

MAP-U28<br />

LOT-3<br />

Bouchard Dr<br />

MAP-U28<br />

LOT-90<br />

MAP-U28<br />

LOT-77<br />

MAP-U28<br />

LOT-74<br />

MAP-U23 LOT-83<br />

MAP-U28<br />

LOT-75<br />

MAP-U28<br />

LOT-121<br />

MAP-U28<br />

LOT-25<br />

MAP-U23<br />

LOT-46<br />

MAP-U23<br />

LOT-93<br />

MAP-U23 LOT-92<br />

MAP-U28 LOT-7<br />

MAP-U28<br />

LOT-4<br />

MAP-U28<br />

LOT-26<br />

MAP-U28<br />

LOT-48<br />

MAP-U28<br />

LOT-24<br />

MAP-U28<br />

LOT-27<br />

MAP-U28<br />

LOT-49<br />

MAP-U28<br />

LOT-47<br />

MAP-U28<br />

LOT-50<br />

MAP-U23<br />

LOT-28<br />

MAP-U23<br />

LOT-18<br />

MAP-U28<br />

LOT-6<br />

MAP-U28<br />

LOT-22<br />

MAP-U23<br />

LOT-94<br />

S<br />

MAP-U23<br />

LOT-31<br />

MAP-U28<br />

LOT-29<br />

MAP-U23<br />

LOT-30<br />

Webster St<br />

MAP-U23<br />

LOT-29<br />

MAP-U28<br />

LOT-45<br />

MAP-U23<br />

LOT-41<br />

MAP-U23<br />

LOT-32<br />

MAP-U23<br />

LOT-33<br />

Turner St<br />

MAP-U23<br />

LOT-17<br />

MAP-U28<br />

LOT-21<br />

MAP-U28<br />

LOT-8<br />

MAP-U23<br />

LOT-89<br />

MAP-U23<br />

LOT-16<br />

MAP-U28<br />

LOT-9<br />

MAP-U28<br />

LOT-31<br />

MAP-U28<br />

LOT-30<br />

MAP-U28<br />

LOT-52<br />

MAP-U28<br />

LOT-53<br />

MAP-U28<br />

LOT-167<br />

MAP-U23<br />

LOT-34<br />

MAP-U23<br />

LOT-34A<br />

MAP-U28 MAP-U28<br />

LOT-20 LOT-19<br />

MAP-U28<br />

LOT-44<br />

MAP-U28<br />

LOT-43<br />

MAP-U28<br />

LOT-32<br />

MAP-U28<br />

LOT-54<br />

MAP-U23<br />

LOT-40<br />

MAP-U28<br />

LOT-42<br />

MAP-U23<br />

LOT-37<br />

MAP-U23<br />

LOT-36<br />

MAP-U28<br />

LOT-55<br />

MAP-U23<br />

LOT-90<br />

Lombard St<br />

MAP-U23<br />

LOT-35<br />

MAP-U23<br />

LOT-15<br />

MAP-U28 LOT-14<br />

MAP-U28<br />

LOT-33<br />

MAP-U23 LOT-8<br />

MAP-U23<br />

LOT-9<br />

MAP-U23<br />

LOT-10<br />

MAP-U28<br />

LOT-35<br />

MAP-U28<br />

LOT-34<br />

MAP-U28<br />

LOT-41<br />

MAP-U23<br />

LOT-11<br />

MAP-U15<br />

LOT-117<br />

MAP-U23<br />

LOT-5<br />

Town of Topsham<br />

Androscoggin River<br />

MAP-U23<br />

LOT-3<br />

Town of Brunswick<br />

Summer St<br />

Connector E<br />

MAP-U23 LOT-14<br />

MAP-U28<br />

LOT-36<br />

MAP-U28<br />

LOT-40<br />

MAP-U28<br />

LOT-69<br />

MAP-U28<br />

LOT-39<br />

MAP-U28<br />

LOT-37<br />

MAP-U23<br />

LOT-4<br />

MAP-U28<br />

LOT-38<br />

MAP-U28<br />

LOT-73<br />

Connector F<br />

MAP-U15<br />

LOT-118<br />

MAP-U15<br />

LOT-102<br />

MAP-U15<br />

LOT-104<br />

MAP-U15 LOT-108<br />

MAP-U22<br />

LOT-101<br />

MAP-U15<br />

LOT-107B<br />

MAP-U22<br />

LOT-102<br />

MAP-U22<br />

LOT-86<br />

MAP-U15<br />

LOT-107<br />

MAP-U15 LOT-123<br />

MAP-U15<br />

LOT-119<br />

MAP-U15<br />

LOT-105<br />

MAP-U15 LOT-106<br />

MAP-U22<br />

LOT-107<br />

MAP-U22<br />

LOT-108<br />

MAP-U22<br />

LOT-104<br />

MAP-U22<br />

LOT-96<br />

MAP-U22<br />

LOT-88<br />

MAP-U22<br />

LOT-62<br />

MAP-U22<br />

MAP-U22<br />

LOT-66<br />

LOT-65<br />

MAP-U15<br />

LOT-120<br />

MAP-U15<br />

LOT-99<br />

MAP-U15<br />

LOT-116<br />

MAP-U15<br />

LOT-115A<br />

MAP-U15<br />

LOT-113A<br />

MAP-U15<br />

LOT-110<br />

MAP-U15<br />

LOT-115<br />

MAP-U15<br />

LOT-114<br />

MAP-U15<br />

LOT-113<br />

S<br />

MAP-U15<br />

LOT-112<br />

MAP-U15<br />

LOT-111<br />

MAP-U22<br />

LOT-94<br />

MAP-U22<br />

LOT-89<br />

MAP-U22<br />

LOT-68<br />

Stanwood St<br />

MAP-U22<br />

LOT-106<br />

MAP-U22<br />

LOT-59<br />

MAP-U22<br />

LOT-60<br />

MAP-U22<br />

LOT-93<br />

MAP-U15<br />

LOT-76<br />

MAP-U22<br />

LOT-92<br />

MAP-U22<br />

LOT-91<br />

MAP-U15<br />

LOT-77<br />

MAP-U15<br />

LOT-124<br />

MAP-U15 LOT-79<br />

MAP-U22<br />

LOT-58<br />

MAP-U15 LOT-81<br />

MAP-U22<br />

LOT-10<br />

MAP-U15<br />

LOT-47<br />

MAP-U15 LOT-80<br />

MAP-U22<br />

LOT-56<br />

MAP-U15<br />

LOT-78<br />

MAP-U15<br />

LOT-82<br />

MAP-U22<br />

LOT-1<br />

MAP-U22<br />

LOT-54<br />

MAP-U15<br />

LOT-53<br />

MAP-U15<br />

LOT-54<br />

MAP-U15<br />

LOT-75<br />

MAP-U15<br />

LOT-83<br />

MAP-U22<br />

LOT-19<br />

MAP-U22<br />

LOT-2<br />

MAP-U22<br />

LOT-20<br />

MAP-U22<br />

LOT-47<br />

Legend<br />

Sage Hill<br />

S<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Connector Road<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalks, Etc<br />

Proposed Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

l<br />

0 300 600 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-13 (Sheet 2 of 2)<br />

Strategy 2B, Option 2<br />

Urban Boulevard<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


MAP-U25<br />

LOT-20<br />

Bailey Ln<br />

Ln<br />

B ailey<br />

MAP-16 LOT-20<br />

MAP-U25<br />

LOT-19<br />

Legend<br />

MAP-16<br />

LOT-29<br />

Railroad<br />

MAP-16 LOT-1<br />

Existing Conservation Land<br />

Parcel Boundary<br />

MAP-16 LOT-30<br />

Proposed Travel Way<br />

MAP-16 LOT-2<br />

Proposed Connector Road<br />

MAP-U34 LOT-23<br />

MAP-U33<br />

LOT-26<br />

MAP-U33<br />

LOT-27<br />

MAP-U33<br />

LOT-28<br />

MAP-U33<br />

LOT-26C<br />

MAP-U33<br />

LOT-26B<br />

MAP-U33<br />

LOT-26A<br />

MAP-U33<br />

LOT-25<br />

Range Rd<br />

MAP-U25 LOT-1<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

MAP-U34<br />

LOT-15<br />

MAP-U34<br />

LOT-14<br />

MAP-U34<br />

LOT-13<br />

MAP-U33<br />

LOT-24<br />

MAP-U33<br />

LOT-23<br />

MAP-U33 LOT-20<br />

MAP-U33<br />

LOT-19<br />

MAP-U33<br />

LOT-18<br />

MAP-U33<br />

LOT-16<br />

MAP-U33<br />

LOT-14<br />

MAP-U33<br />

LOT-15<br />

MAP-U33<br />

LOT-13<br />

MAP-U33<br />

LOT-12<br />

Pleasant St<br />

MAP-U33 LOT-5<br />

MAP-U33<br />

LOT-1<br />

MAP-U26 LOT-37<br />

S<br />

MAP-U26<br />

LOT-39<br />

MAP-U26<br />

LOT-42<br />

MAP-U26<br />

LOT-41<br />

MAP-U26<br />

LOT-25<br />

S<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalks<br />

Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

MAP-U34 LOT-7<br />

MAP-U34<br />

LOT-6B<br />

£¤ 1<br />

Old Portland Rd<br />

MAP-U34 LOT-4<br />

MAP-U34<br />

LOT-2<br />

MAP-U34<br />

LOT-1<br />

MAP-U34 LOT-3<br />

MAP-U33<br />

LOT-437<br />

MAP-U33 LOT-436<br />

MAP-U33<br />

LOT-435B<br />

MAP-U33<br />

LOT-435<br />

MAP-U33 LOT-434<br />

MAP-U33<br />

LOT-433<br />

MAP-U33 LOT-430<br />

MAP-U26<br />

LOT-35<br />

MAP-U26<br />

LOT-33<br />

MAP-U26 LOT-34<br />

MAP-U26<br />

LOT-30<br />

Robinson Ave<br />

MAP-U26<br />

LOT-30A<br />

MAP-U26<br />

LOT-29B<br />

MAP-U26<br />

LOT-29C<br />

MAP-U26<br />

LOT-25A<br />

MAP-U26<br />

LOT-26<br />

l<br />

MAP-U26<br />

LOT-29A<br />

MAP-17 LOT-6<br />

Lower Road Rail Line<br />

Marriner Rd<br />

0 300 600 Feet<br />

MAP-17 LOT-59<br />

MAP-17 LOT-58<br />

MAP-17<br />

LOT-57<br />

MAP-17<br />

LOT-50<br />

MAP-17<br />

LOT-25<br />

MAP-U31<br />

LOT-36A<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-14 (Sheet 1 of 2)<br />

Strategy 2B, Option 3<br />

5-Lane w/TWLTL<br />

Bibber Pkwy<br />

MAP-17 LOT-56<br />

MAP-17<br />

LOT-52<br />

MAP-17 LOT-19<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

MAP-17 LOT-53<br />

MAP-17 LOT-44<br />

Industrial Pkwy<br />

MAP-17 LOT-43<br />

MAP-17<br />

LOT-42<br />

MAP-17<br />

LOT-48<br />

MAP-17<br />

LOT-24<br />

MAP-17<br />

LOT-71<br />

MAP-U31<br />

LOT-35<br />

MAP-U31 LOT-5<br />

MAP-U31 LOT-4<br />

MAP-U31<br />

LOT-3<br />

MAP-U31<br />

LOT-209<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


MAP-U25<br />

LOT-20<br />

MAP-16 LOT-1<br />

Bailey Ln<br />

Ln<br />

B ailey<br />

MAP-U25<br />

LOT-19<br />

MAP-U25<br />

LOT-21<br />

MAP-U25<br />

LOT-18<br />

MAP-U25<br />

LOT-22<br />

MAP-U25<br />

LOT-17<br />

MAP-U25<br />

LOT-16<br />

Bailey Ln<br />

MAP-U25<br />

LOT-15<br />

MAP-U25<br />

LOT-14<br />

MAP-U25<br />

LOT-13<br />

MAP-U25<br />

LOT-1B<br />

MAP-U24<br />

LOT-44<br />

MAP-U24 LOT-6<br />

MAP-U24<br />

LOT-6A<br />

MAP-U24 LOT-5<br />

MAP-U24<br />

LOT-2A<br />

MAP-U26<br />

LOT-39<br />

MAP-U26<br />

LOT-34<br />

Marriner Rd<br />

MAP-U31<br />

LOT-5<br />

MAP-U26<br />

LOT-30<br />

Robinson Ave<br />

MAP-U26<br />

LOT-30A<br />

MAP-U31<br />

LOT-36A<br />

MAP-U26<br />

LOT-29B<br />

MAP-U26<br />

LOT-29C<br />

MAP-U26<br />

LOT-41<br />

MAP-U26<br />

LOT-25<br />

MAP-U26<br />

LOT-25A<br />

MAP-U26<br />

LOT-29A<br />

MAP-17 LOT-25<br />

MAP-U26<br />

LOT-26<br />

MAP-U26<br />

LOT-28<br />

MAP-17 LOT-6<br />

MAP-U31<br />

LOT-3<br />

MAP-U26<br />

LOT-42<br />

MAP-U26<br />

LOT-24<br />

MAP-U26 LOT-27<br />

MAP-U31<br />

LOT-207<br />

MAP-U26<br />

LOT-28A<br />

Owen St<br />

MAP-U26<br />

LOT-16<br />

MAP-U31 LOT-2<br />

MAP-U31<br />

LOT-206<br />

MAP-U26<br />

LOT-22<br />

Church Rd<br />

MAP-U26 LOT-14<br />

MAP-U31<br />

LOT-225<br />

MAP-U26<br />

LOT-46<br />

S<br />

MAP-U26<br />

LOT-13B<br />

MAP-U26<br />

LOT-12<br />

MAP-U31<br />

LOT-105<br />

MAP-U31<br />

MAP-U31<br />

LOT-239<br />

LOT-224<br />

THESE PLANS DEPICT CONCEPTUAL MAP-U31 IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

MAP-U31 LOT-4<br />

LOT-238<br />

MAP-U31<br />

MAP-U31<br />

DECISIONS HAVE BEEN MADE WITH<br />

MAP-U31<br />

MAP-U31 REGARD TO POTENTIAL PROPERTY<br />

LOT-226<br />

LOT-113<br />

ACQUISITION. LOT-208<br />

LOT-240<br />

MAP-U31<br />

LOT-237<br />

MAP-U25 LOT-1<br />

MAP-U31<br />

LOT-205<br />

MAP-U26<br />

LOT-43<br />

MAP-U31<br />

LOT-241<br />

MAP-U31<br />

LOT-204<br />

MAP-U31 LOT-1<br />

MAP-U31<br />

LOT-203<br />

MAP-U26<br />

LOT-44<br />

MAP-U26<br />

LOT-20<br />

MAP-U26<br />

LOT-13<br />

MAP-U31<br />

LOT-202<br />

MAP-U31<br />

LOT-227<br />

MAP-U26<br />

LOT-6<br />

MAP-U31<br />

LOT-201<br />

MAP-U31<br />

LOT-223<br />

MAP-U24 LOT-7<br />

MAP-U26<br />

LOT-5<br />

MAP-U26<br />

LOT-47<br />

Connector B<br />

Paul St<br />

MAP-U26 LOT-10<br />

MAP-U31<br />

LOT-12<br />

MAP-U31<br />

LOT-104<br />

MAP-U31<br />

LOT-106<br />

MAP-U24<br />

LOT-14<br />

MAP-U26 LOT-49<br />

MAP-U26 LOT-3<br />

MAP-U26<br />

LOT-15<br />

MAP-U31<br />

LOT-103<br />

MAP-U31<br />

LOT-107<br />

MAP-U31<br />

LOT-112<br />

MAP-U24 LOT-4<br />

Lavalley Ave<br />

MAP-U26 LOT-18<br />

MAP-U28<br />

LOT-107<br />

MAP-U31<br />

LOT-108<br />

MAP-U26<br />

LOT-50<br />

MAP-U26<br />

LOT-9<br />

MAP-U31<br />

LOT-111<br />

River Rd<br />

Westminster Ave<br />

MAP-U23<br />

LOT-71<br />

MAP-U28<br />

LOT-106<br />

MAP-U31<br />

LOT-116<br />

MAP-U23<br />

LOT-65<br />

MAP-U23<br />

LOT-58<br />

MAP-U28<br />

LOT-104<br />

MAP-U28<br />

LOT-88<br />

MAP-U28<br />

LOT-89<br />

MAP-U23<br />

LOT-66<br />

MAP-U23<br />

LOT-57<br />

MAP-U26<br />

LOT-7<br />

MAP-U28<br />

LOT-1A<br />

MAP-U28<br />

LOT-105<br />

MAP-U28<br />

LOT-102<br />

MAP-U28<br />

LOT-87<br />

MAP-U23<br />

LOT-62<br />

MAP-U23<br />

LOT-57A<br />

MAP-U28<br />

LOT-103<br />

MAP-U28<br />

LOT-86<br />

MAP-U24 LOT-3<br />

MAP-U23<br />

LOT-67<br />

Westminster<br />

MAP-U23<br />

LOT-56<br />

MAP-U28<br />

LOT-101<br />

MAP-U24<br />

LOT-2B<br />

MAP-U24 LOT-1<br />

MAP-U28<br />

LOT-100<br />

MAP-U23<br />

LOT-68<br />

MAP-U28<br />

LOT-84<br />

MAP-U23 LOT-55A<br />

MAP-U24<br />

LOT-2C<br />

Connector C<br />

Connector D<br />

Lower Road Rail Line<br />

MAP-U28<br />

LOT-85<br />

MAP-U23<br />

LOT-69<br />

MAP-U28<br />

LOT-99<br />

MAP-U28<br />

LOT-98<br />

MAP-U28<br />

LOT-82<br />

MAP-U28<br />

LOT-83<br />

MAP-U28<br />

LOT-97<br />

MAP-U28<br />

LOT-96<br />

MAP-U28<br />

LOT-117<br />

MAP-U23<br />

LOT-78<br />

MAP-U28<br />

LOT-80<br />

MAP-U23<br />

LOT-50<br />

MAP-U28<br />

LOT-95<br />

MAP-U28<br />

LOT-81<br />

MAP-U23 LOT-87<br />

MAP-U28<br />

LOT-94<br />

MAP-U28<br />

LOT-118<br />

MAP-U28<br />

LOT-78<br />

MAP-U23<br />

LOT-79<br />

MAP-U23<br />

LOT-48<br />

MAP-U28<br />

LOT-93<br />

MAP-U28<br />

LOT-79<br />

MAP-U28<br />

LOT-92<br />

MAP-U28<br />

LOT-119<br />

MAP-U28<br />

LOT-91<br />

MAP-U28<br />

LOT-76<br />

MAP-U28<br />

LOT-120<br />

MAP-U23<br />

LOT-47<br />

MAP-U28<br />

LOT-3<br />

Bouchard Dr<br />

MAP-U28<br />

LOT-90<br />

MAP-U28<br />

LOT-77<br />

MAP-U28<br />

LOT-74<br />

MAP-U23 LOT-83<br />

MAP-U28<br />

LOT-75<br />

MAP-U28<br />

LOT-121<br />

MAP-U28<br />

LOT-25<br />

MAP-U23<br />

LOT-46<br />

MAP-U23<br />

LOT-93<br />

MAP-U23 LOT-92<br />

MAP-U28 LOT-7<br />

MAP-U28<br />

LOT-4<br />

MAP-U28<br />

LOT-26<br />

MAP-U28<br />

LOT-48<br />

MAP-U28<br />

LOT-24<br />

MAP-U28<br />

LOT-27<br />

MAP-U28<br />

LOT-49<br />

MAP-U28<br />

LOT-47<br />

MAP-U28<br />

LOT-50<br />

MAP-U23<br />

LOT-28<br />

MAP-U23<br />

LOT-18<br />

MAP-U28<br />

LOT-6<br />

MAP-U28<br />

LOT-22<br />

MAP-U23<br />

LOT-94<br />

MAP-U28<br />

LOT-29<br />

S<br />

MAP-U23<br />

LOT-31<br />

MAP-U23<br />

LOT-30<br />

Webster St<br />

MAP-U23<br />

LOT-29<br />

MAP-U28<br />

LOT-45<br />

MAP-U23<br />

LOT-41<br />

MAP-U23<br />

LOT-32<br />

MAP-U23<br />

LOT-33<br />

Turner St<br />

MAP-U23<br />

LOT-17<br />

MAP-U28<br />

LOT-21<br />

MAP-U28<br />

LOT-8<br />

MAP-U23<br />

LOT-89<br />

MAP-U23<br />

LOT-16<br />

MAP-U28<br />

LOT-9<br />

MAP-U28<br />

LOT-31<br />

MAP-U28<br />

LOT-30<br />

MAP-U28<br />

LOT-52<br />

MAP-U28<br />

LOT-53<br />

MAP-U28<br />

LOT-167<br />

MAP-U23<br />

LOT-34<br />

MAP-U23<br />

LOT-34A<br />

MAP-U28 MAP-U28<br />

LOT-20 LOT-19<br />

MAP-U28<br />

LOT-44<br />

MAP-U28<br />

LOT-43<br />

MAP-U28<br />

LOT-32<br />

MAP-U28<br />

LOT-54<br />

MAP-U23<br />

LOT-40<br />

MAP-U28<br />

LOT-42<br />

MAP-U23<br />

LOT-37<br />

MAP-U23<br />

LOT-36<br />

MAP-U28<br />

LOT-55<br />

MAP-U23<br />

LOT-90<br />

Lombard St<br />

MAP-U23<br />

LOT-35<br />

MAP-U23<br />

LOT-15<br />

MAP-U28 LOT-14<br />

MAP-U28<br />

LOT-33<br />

MAP-U23 LOT-8<br />

MAP-U23<br />

LOT-9<br />

MAP-U28<br />

LOT-35<br />

MAP-U28<br />

LOT-34<br />

MAP-U28<br />

LOT-41<br />

MAP-U23<br />

LOT-10<br />

MAP-U23<br />

LOT-11<br />

MAP-U15<br />

LOT-117<br />

MAP-U23<br />

LOT-5<br />

Town of Topsham<br />

Androscoggin River<br />

MAP-U23<br />

LOT-3<br />

Town of Brunswick<br />

Summer St<br />

Connector E<br />

MAP-U28<br />

LOT-40<br />

MAP-U28<br />

LOT-69<br />

MAP-U23 LOT-14<br />

MAP-U28<br />

LOT-36<br />

MAP-U28<br />

LOT-39<br />

MAP-U28<br />

LOT-37<br />

MAP-U23<br />

LOT-4<br />

MAP-U28<br />

LOT-38<br />

MAP-U28<br />

LOT-73<br />

MAP-U15<br />

LOT-118<br />

MAP-U15 LOT-108<br />

MAP-U22<br />

LOT-101<br />

Connector F<br />

MAP-U15<br />

LOT-102<br />

MAP-U15<br />

LOT-104<br />

MAP-U15<br />

LOT-107B<br />

MAP-U22<br />

LOT-102<br />

MAP-U22<br />

LOT-86<br />

MAP-U15<br />

LOT-107<br />

MAP-U15 LOT-123<br />

MAP-U15<br />

LOT-119<br />

MAP-U15<br />

LOT-105<br />

MAP-U15 LOT-106<br />

MAP-U22<br />

LOT-107<br />

MAP-U22<br />

LOT-108<br />

MAP-U22<br />

LOT-104<br />

MAP-U22<br />

LOT-88<br />

MAP-U22<br />

LOT-62<br />

MAP-U22<br />

LOT-65<br />

MAP-U22<br />

LOT-96<br />

MAP-U22<br />

LOT-66<br />

MAP-U15<br />

LOT-120<br />

MAP-U15<br />

LOT-99<br />

MAP-U15<br />

LOT-116<br />

MAP-U15<br />

LOT-115A<br />

MAP-U15<br />

LOT-113A<br />

MAP-U15<br />

LOT-110<br />

MAP-U15<br />

LOT-115<br />

MAP-U15<br />

LOT-114<br />

MAP-U15<br />

LOT-113<br />

MAP-U15<br />

LOT-112<br />

MAP-U15<br />

LOT-111<br />

MAP-U22<br />

LOT-94<br />

MAP-U22<br />

LOT-89<br />

S<br />

MAP-U22<br />

LOT-68<br />

Stanwood St<br />

MAP-U22<br />

LOT-106<br />

MAP-U22<br />

LOT-59<br />

MAP-U22<br />

LOT-60<br />

MAP-U22<br />

LOT-93<br />

MAP-U15<br />

LOT-76<br />

MAP-U22<br />

LOT-92<br />

MAP-U22<br />

LOT-91<br />

MAP-U15<br />

LOT-77<br />

MAP-U15<br />

LOT-124<br />

MAP-U15 LOT-79<br />

MAP-U22<br />

LOT-58<br />

MAP-U15 LOT-81<br />

MAP-U22<br />

LOT-10<br />

MAP-U15<br />

LOT-47<br />

MAP-U15 LOT-80<br />

MAP-U22<br />

LOT-56<br />

MAP-U15<br />

LOT-78<br />

MAP-U15<br />

LOT-82<br />

MAP-U22<br />

LOT-1<br />

MAP-U22<br />

LOT-54<br />

MAP-U15<br />

LOT-53<br />

MAP-U15<br />

LOT-54<br />

MAP-U15<br />

LOT-75<br />

MAP-U15<br />

LOT-83<br />

MAP-U22<br />

LOT-19<br />

MAP-U22<br />

LOT-2<br />

MAP-U22<br />

LOT-20<br />

MAP-U22<br />

LOT-47<br />

Legend<br />

Sage Hill<br />

S<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Connector Road<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines, Crosswalks<br />

Retaining Wall<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Parcel Connector<br />

Striped Median<br />

Pavement Removal Lines<br />

Traffic Signal<br />

l<br />

0 300 600 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-14 (Sheet 2 of 2)<br />

Strategy 2B, Option 3<br />

5-Lane w/TWLTL<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


4.9 Strategy 2C – Improve Mobility along Mill Street<br />

Strategy 2C involves the evaluation of measures to improve vehicular, bicycle, and<br />

pedestrian mobility along Mill Street between the Pleasant Street/Stanwood Street<br />

intersection and the Maine Street/Mill Street interchange. Strategy 2C is primarily<br />

intended to reduce congestion and vehicle conflicts by increasing the number of<br />

travel lanes and by installing a raised median.<br />

The Study Area for Strategy 2C en<strong>com</strong>passes the Mill Street (US Route 1) corridor,<br />

beginning at Pleasant Street and extending easterly for approximately 0.45 mile to<br />

the Mill Street/Maine Street interchange ramps. The Study Area is also bounded by<br />

the Androscoggin River to the north and a residential neighborhood to the south.<br />

The Study Area is located entirely within the Town of Brunswick. Based on input<br />

from the Study Advisory Committee and feedback from the public workshops and<br />

public informational meetings, two study options were developed. The following<br />

subsections describe the features of the two Strategy 2C options.<br />

4.9.1 Option 1<br />

Option 1 (Figure 4-15) entails adding a continuous eastbound travel lane that results<br />

in two eastbound and one westbound travel lanes. This lane configuration matches<br />

the two existing eastbound and one westbound through lanes located in the<br />

depressed Mill Street section under Maine Street. The typical roadway section<br />

includes a continuous<br />

raised median,<br />

shoulders, and<br />

sidewalks through the<br />

Study Area. The raised<br />

median does not have<br />

breaks in it; therefore,<br />

left turns into and out of<br />

the side streets are<br />

prohibited in Option 1.<br />

Widening Mill Street to<br />

ac<strong>com</strong>modate the<br />

additional eastbound lane results in minor slope impacts. The Mill Street widening in<br />

the vicinity of Sage Hill worsens the already steep approach grade; therefore, the<br />

Study investigates the closing of the steep approach and instead connecting Sage Hill<br />

to Cumberland Street by a 400-foot-long connector road. Therefore, the Cumberland<br />

Street, Swett Street, and Cushing Street intersections with Mill Street be<strong>com</strong>e rightin/right-out.<br />

Summary of Options 123


Option 1 includes continuous sidewalks and/or a shared-use path that connects to<br />

the Pleasant Street and Maine Street sidewalks and the Androscoggin Brunswick-<br />

Topsham Riverwalk. The Riverwalk crosses the river on the historic Swinging Bridge<br />

pedestrian bridge.<br />

Option 1 removes the at-grade pedestrian crosswalk that crosses Mill Street at the<br />

Cushing Street intersection.<br />

Pedestrians and bicyclists<br />

instead cross the road via a<br />

proposed pedestrian<br />

overpass adjacent to the east<br />

side of the railroad bridge.<br />

A 500-foot-long shared-use<br />

path is constructed<br />

southeast of the Mill Street<br />

pedestrian overpass to<br />

connect the residential<br />

neighborhood streets to the trail and sidewalk network. The pedestrian bridge<br />

requires a 400-foot-long bicyclist and pedestrian ramp along the Androscoggin River<br />

to provide access to the bridge from street level.<br />

Option 1 also includes replacement of the existing railroad bridge over Mill Street<br />

with a longer bridge to ac<strong>com</strong>modate the wider Mill Street roadway section<br />

underneath.<br />

4.9.2 Option 2<br />

Option 2 (Figure 4-16) differs from Option 1 primarily in that Mill Street is expanded<br />

to include two through<br />

lanes in each direction.<br />

This provides lane<br />

continuity to the proposed<br />

four-lane Pleasant Street<br />

cross-section included in<br />

Strategy 2B. The Option 2<br />

four-lane design results in<br />

only a modest increase in<br />

slope impacts <strong>com</strong>pared<br />

to Option 1 because the<br />

Option 1 westbound lane<br />

width needs to be wider than one standard lane. The raised median in <strong>com</strong>bination<br />

with a single lane necessitates the wider section so that motorists have the ability to<br />

pass a disabled vehicle.<br />

Summary of Options 124


Map U01 Lot<br />

63-<br />

Map U01<br />

Lot 57-<br />

Map U01<br />

Lot 43-<br />

MAP-U23 LOT-94<br />

MAP-U15<br />

LOT-122<br />

Map U01<br />

Lot 58-<br />

Map U01<br />

Lot 62-<br />

Map U01<br />

Lot 42-<br />

Map U01<br />

Lot 59-<br />

MAP-U15<br />

LOT-117<br />

Map U01<br />

Lot 40-<br />

Map U01<br />

Lot 59-<br />

Map U01<br />

Lot 60-<br />

Map U01<br />

Lot 61-<br />

Map U01<br />

Lot 39-<br />

Map U01<br />

Lot 53-<br />

Map U01<br />

Lot 64-<br />

Map U01<br />

Lot 33-<br />

Mill St Canoe<br />

Portage<br />

MAP-U15 LOT-123<br />

MAP-U15 MAP-U15<br />

LOT-118<br />

LOT-119<br />

£¤ 1<br />

MAP-U15 LOT-102<br />

Map U01<br />

Lot 38-<br />

Map Lot 0-<br />

Map U01<br />

Lot 65-<br />

Map U01<br />

Lot 38-<br />

Map U01<br />

Lot 32-<br />

Map U01<br />

Lot 69-<br />

Map U01<br />

Lot 68-<br />

MAP-U15 MAP-U15<br />

LOT-101 LOT-100<br />

Map U01<br />

Lot 66-<br />

Map U01<br />

Lot 37-<br />

MAP-U15 LOT-120<br />

MAP-U15<br />

LOT-99<br />

Map U01<br />

Lot 74-<br />

Map U01<br />

Lot 67-<br />

Map U01<br />

Lot 36-<br />

Map U01<br />

Lot 71-<br />

Map U01<br />

Lot 70-<br />

Map U01<br />

Lot 80-<br />

Map U01<br />

Lot 72-<br />

Map U01<br />

Lot 81-<br />

MAP-U15<br />

LOT-76<br />

Map U01<br />

Lot 79-<br />

Map U01 Lot 35-<br />

Map U01<br />

Lot 77-<br />

Map U01<br />

Lot 78-<br />

Map U01<br />

Lot 76-<br />

Map U01<br />

Lot 82-<br />

Proposed Pedestrian<br />

Bridge<br />

MAP-U15<br />

LOT-124<br />

MAP-U15<br />

LOT-53<br />

MAP-U15<br />

LOT-54<br />

Map U01 Lot 83-<br />

MAP-U15<br />

LOT-47<br />

MAP-U15<br />

LOT-75<br />

Map U01<br />

Lot 85-<br />

Map U01<br />

Lot 84-<br />

MAP-U15<br />

LOT-126<br />

Sage Hill<br />

MAP-U15<br />

LOT-52<br />

MAP-U15<br />

LOT-55<br />

Map U01<br />

Lot 86-<br />

Map U01 Lot 95-<br />

MAP-U15<br />

LOT-51<br />

MAP-U15<br />

LOT-48<br />

MAP-U15<br />

LOT-56<br />

MAP-U15<br />

LOT-74<br />

MAP-U15<br />

LOT-38<br />

MAP-U15 LOT-46<br />

MAP-U15<br />

LOT-72<br />

Map U01<br />

Lot 22-<br />

MAP-U15<br />

LOT-50<br />

MAP-U15<br />

LOT-57<br />

Map U01<br />

Lot 23-<br />

MAP-U15<br />

LOT-36<br />

Map U01<br />

Lot 8-<br />

MAP-U15<br />

LOT-71<br />

MAP-U15<br />

LOT-35<br />

MAP-U15<br />

LOT-39<br />

MAP-U15<br />

LOT-49<br />

Map U01<br />

Lot 24-<br />

MAP-U15<br />

LOT-45<br />

MAP-U15<br />

LOT-58<br />

Map U01<br />

Lot 24-<br />

Androscoggin River<br />

Swinging Bridge<br />

MAP-U15<br />

LOT-40<br />

MAP-U15<br />

LOT-70<br />

MAP-U15<br />

LOT-43<br />

MAP-U15<br />

LOT-59<br />

MAP-U15<br />

LOT-28<br />

MAP-U15 LOT-26<br />

MAP-U15<br />

LOT-69<br />

MAP-U15<br />

LOT-34<br />

MAP-U15<br />

LOT-41<br />

Cumberland St<br />

MAP-U15<br />

LOT-37<br />

MAP-U15<br />

LOT-30<br />

MAP-U15<br />

LOT-29<br />

MAP-U15<br />

LOT-27<br />

MAP-U15<br />

LOT-25<br />

MAP-U15<br />

LOT-65<br />

MAP-U15<br />

MAP-U15<br />

LOT-61<br />

LOT-60<br />

Pleasant St<br />

MAP-U15<br />

LOT-68<br />

Map U01<br />

Lot 8-<br />

Swett St<br />

MAP-U15 LOT-42<br />

MAP-U15<br />

LOT-67<br />

MAP-U15 LOT-3<br />

MAP-U15 LOT-4<br />

MAP-U15 LOT-5<br />

MAP-U15 LOT-6<br />

MAP-U15 LOT-7<br />

MAP-U15 LOT-8<br />

MAP-U15<br />

LOT-24<br />

MAP-U15<br />

LOT-62<br />

MAP-U15<br />

LOT-19<br />

MAP-U15<br />

LOT-66<br />

MAP-U15<br />

LOT-98<br />

MAP-U15 LOT-97<br />

MAP-U15<br />

LOT-128<br />

MAP-U15<br />

LOT-23<br />

MAP-U15<br />

LOT-17<br />

MAP-U15<br />

LOT-15<br />

MAP-U15<br />

LOT-14<br />

MAP-U15<br />

LOT-20<br />

MAP-U15<br />

MAP-U15 LOT-64<br />

LOT-63<br />

Spring St<br />

MAP-U15<br />

LOT-22<br />

MAP-U15<br />

LOT-20A<br />

MAP-U16<br />

LOT-54<br />

MAP-U14<br />

LOT-170<br />

MAP-U15<br />

LOT-2<br />

MAP-U15<br />

LOT-16<br />

MAP-U15<br />

LOT-12<br />

MAP-U15<br />

LOT-9<br />

MAP-U15<br />

LOT-21<br />

MAP-U15<br />

LOT-33<br />

MAP-U15<br />

LOT-10<br />

MAP-U15<br />

LOT-18<br />

MAP-U16<br />

LOT-55<br />

Cushing St<br />

MAP-U15<br />

LOT-18A<br />

MAP-U16<br />

LOT-53<br />

MAP-U16<br />

LOT-56<br />

Androscoggin<br />

Brunswick-Topsham<br />

Riverwalk<br />

MAP-U14<br />

LOT-96<br />

MAP-U14<br />

LOT-95<br />

MAP-U14<br />

LOT-74<br />

MAP-U14<br />

LOT-75<br />

MAP-U14<br />

LOT-54<br />

MAP-U14<br />

LOT-55<br />

MAP-U14<br />

LOT-56<br />

MAP-U14<br />

LOT-73<br />

MAP-U14<br />

LOT-31<br />

MAP-U14 LOT-32<br />

MAP-U14<br />

LOT-34<br />

MAP-U14<br />

LOT-11<br />

MAP-U16<br />

LOT-52<br />

MAP-U14<br />

LOT-93<br />

MAP-U14<br />

LOT-33<br />

MAP-U14<br />

LOT-97<br />

MAP-U14<br />

LOT-76<br />

MAP-U14<br />

LOT-53<br />

MAP-U14<br />

LOT-57<br />

MAP-U14<br />

LOT-35<br />

MAP-U14<br />

LOT-30<br />

MAP-U14<br />

LOT-13<br />

MAP-U16<br />

LOT-51<br />

MAP-U14<br />

LOT-98<br />

MAP-U14<br />

LOT-72<br />

MAP-U14<br />

LOT-36<br />

MAP-U14<br />

LOT-88<br />

MAP-U14<br />

MAP-U14 LOT-69<br />

MAP-U14 LOT-70<br />

LOT-71<br />

MAP-U14<br />

LOT-77<br />

MAP-U14<br />

LOT-52<br />

MAP-U14<br />

LOT-58<br />

MAP-U14<br />

LOT-89<br />

MAP-U14<br />

LOT-99<br />

MAP-U14<br />

LOT-29<br />

MAP-U14<br />

LOT-51<br />

MAP-U14<br />

LOT-28<br />

MAP-U14<br />

LOT-15<br />

MAP-U14<br />

LOT-100<br />

MAP-U14<br />

LOT-78<br />

High St<br />

MAP-U14<br />

LOT-59<br />

MAP-U14<br />

LOT-37<br />

MAP-U14<br />

LOT-8<br />

MAP-U14<br />

LOT-27<br />

MAP-U14<br />

LOT-16<br />

State Highway Mill St<br />

MAP-U14<br />

LOT-50<br />

MAP-U16<br />

LOT-49<br />

MAP-U14<br />

LOT-87<br />

MAP-U14<br />

LOT-101<br />

Oak St<br />

MAP-U14<br />

LOT-60<br />

MAP-U14<br />

LOT-68<br />

MAP-U14<br />

LOT-79<br />

MAP-U14<br />

LOT-26<br />

MAP-U14<br />

LOT-38<br />

MAP-U14<br />

LOT-6<br />

MAP-U14<br />

LOT-49<br />

MAP-U14<br />

LOT-17<br />

MAP-U14<br />

LOT-86<br />

MAP-U14<br />

LOT-67<br />

MAP-U14<br />

LOT-80A<br />

MAP-U14<br />

LOT-61<br />

Cumberland St<br />

MAP-U14<br />

LOT-39<br />

Dunning St<br />

MAP-U14<br />

LOT-102<br />

MAP-U14<br />

LOT-25<br />

MAP-U14<br />

LOT-5<br />

MAP-U14<br />

LOT-18<br />

MAP-U16<br />

LOT-48<br />

MAP-U14<br />

LOT-66<br />

MAP-U14<br />

LOT-47<br />

MAP-U14<br />

LOT-85<br />

MAP-U14<br />

LOT-103<br />

MAP-U14<br />

LOT-80B<br />

MAP-U14<br />

LOT-62<br />

MAP-U14<br />

LOT-40<br />

MAP-U14<br />

LOT-46<br />

MAP-U14<br />

LOT-172<br />

MAP-U14<br />

LOT-63A<br />

MAP-U14<br />

LOT-23<br />

MAP-U14<br />

LOT-24<br />

MAP-U14<br />

LOT-19<br />

Mill St<br />

MAP-U14<br />

LOT-81<br />

MAP-U14<br />

LOT-41<br />

MAP-U14<br />

LOT-1B<br />

MAP-U14<br />

LOT-132<br />

MAP-U14<br />

LOT-104<br />

MAP-U14<br />

LOT-65A<br />

MAP-U14<br />

LOT-45<br />

MAP-U14<br />

LOT-83<br />

MAP-U14<br />

LOT-82<br />

MAP-U14<br />

LOT-63<br />

MAP-U14<br />

LOT-22<br />

MAP-U14<br />

LOT-83A<br />

MAP-U14<br />

LOT-21<br />

MAP-U14<br />

LOT-105<br />

MAP-U14<br />

LOT-64<br />

MAP-U14<br />

LOT-44<br />

MAP-U14<br />

LOT-43<br />

MAP-U14<br />

LOT-65B<br />

MAP-U14 LOT-2<br />

MAP-U14 LOT-1A<br />

Bow St<br />

MAP-U14 LOT-20<br />

MAP-U16 LOT-47<br />

MAP-U14<br />

LOT-133<br />

MAP-U13<br />

LOT-46<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

MAP-U16 DECISIONS LOT-50 HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY MAP-U16<br />

ACQUISITION.<br />

LOT-45<br />

Union St<br />

MAP-U14<br />

LOT-122<br />

MAP-U14<br />

LOT-123<br />

MAP-U14<br />

LOT-107<br />

MAP-U13<br />

LOT-5<br />

MAP-U13<br />

LOT-8<br />

MAP-U13<br />

LOT-30<br />

MAP-U13<br />

LOT-30A<br />

MAP-U13<br />

LOT-31<br />

MAP-U13<br />

LOT-47<br />

MAP-U13<br />

LOT-48<br />

MAP-U13<br />

LOT-49<br />

MAP-U13<br />

LOT-50<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Bike Path<br />

Proposed Connector Road<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines<br />

Proposed ROW<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Existing Path<br />

l<br />

0 200 400 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-15<br />

Strategy 2C, Option 1<br />

Mill St 3 Lanes with Median<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


MAP-U23 LOT-94<br />

MAP-U23<br />

LOT-90<br />

Map U01<br />

Lot 57-<br />

Map U01<br />

Lot 43-<br />

Map U01<br />

Lot 63-<br />

MAP-U15<br />

LOT-122<br />

Map U01<br />

Lot 58-<br />

Map U01<br />

Lot 62-<br />

Map U01<br />

Lot 42-<br />

Map U01<br />

Lot 59-<br />

MAP-U15<br />

LOT-117<br />

Map U01<br />

Lot 40-<br />

Map U01<br />

Lot 59-<br />

Map U01<br />

Lot 60-<br />

Map U01<br />

Lot 61-<br />

Map U01<br />

Lot 39-<br />

Map U01<br />

Lot 53-<br />

Map U01<br />

Lot 64-<br />

Map U01<br />

Lot 33-<br />

Map U01<br />

Lot 38-<br />

Map Lot 0-<br />

Map U01<br />

Lot 65-<br />

Map U01<br />

Lot 38-<br />

Map U01<br />

Lot 75-<br />

Map U01<br />

Lot 69-<br />

Map U01<br />

Lot 68-<br />

Map U01<br />

Lot 32-<br />

Mill St Canoe<br />

Portage<br />

MAP-U15 LOT-123<br />

MAP-U15 MAP-U15<br />

LOT-118 LOT-119<br />

£¤ 1<br />

Map U01<br />

Lot 66-<br />

Map U01<br />

Lot 37-<br />

Map U01<br />

Lot 74-<br />

Map U01<br />

Lot 70-<br />

Map U01<br />

Lot 67-<br />

Map U01<br />

Lot 36-<br />

MAP-U15 LOT-120<br />

Map U01<br />

Lot 71-<br />

Map U01<br />

Lot 80-<br />

Map U01<br />

Lot 72-<br />

Map U01<br />

Lot 81-<br />

MAP-U15<br />

LOT-76<br />

Map U01<br />

Lot 79-<br />

Map U01 Lot 35-<br />

Map U01<br />

Lot 77-<br />

Map U01<br />

Lot 78-<br />

Map U01<br />

Lot 76-<br />

Map U01<br />

Lot 82-<br />

Proposed Pedestrian<br />

Bridge<br />

MAP-U15<br />

LOT-124<br />

MAP-U15<br />

LOT-53<br />

MAP-U15<br />

LOT-54<br />

Map U01<br />

Lot 93-<br />

Map U01 Lot 83-<br />

MAP-U15<br />

LOT-47<br />

MAP-U15<br />

LOT-75<br />

Map U01<br />

Lot 85-<br />

Map U01<br />

Lot 84-<br />

MAP-U15<br />

LOT-126<br />

Sage Hill<br />

MAP-U15<br />

LOT-52<br />

MAP-U15<br />

LOT-55<br />

Map U01 Lot 95-<br />

Map U01<br />

Lot 86-<br />

MAP-U15<br />

LOT-51<br />

MAP-U15<br />

LOT-48<br />

MAP-U15<br />

LOT-56<br />

MAP-U15<br />

LOT-74<br />

MAP-U15<br />

LOT-38<br />

MAP-U15 LOT-46<br />

MAP-U15<br />

LOT-72<br />

Map U01<br />

Lot 22-<br />

MAP-U15<br />

LOT-50<br />

MAP-U15<br />

LOT-57<br />

Map U01<br />

Lot 23-<br />

MAP-U15<br />

LOT-36<br />

Map U01<br />

Lot 8-<br />

MAP-U15<br />

LOT-71<br />

MAP-U15<br />

LOT-35<br />

MAP-U15<br />

LOT-39<br />

MAP-U15<br />

LOT-49<br />

Map U01<br />

Lot 24-<br />

MAP-U15<br />

LOT-45<br />

MAP-U15<br />

LOT-58<br />

Map U01 Lot 9-<br />

Map U01<br />

Lot 24-<br />

Androscoggin River<br />

Swinging Bridge<br />

MAP-U15<br />

LOT-40<br />

MAP-U15<br />

LOT-70<br />

MAP-U15<br />

LOT-43<br />

MAP-U15<br />

LOT-59<br />

MAP-U15<br />

LOT-28<br />

MAP-U15 LOT-26<br />

MAP-U15<br />

LOT-69<br />

MAP-U15<br />

LOT-34<br />

MAP-U15<br />

LOT-41<br />

Cumberland St<br />

MAP-U15<br />

LOT-37<br />

MAP-U15<br />

LOT-30<br />

MAP-U15<br />

LOT-29<br />

MAP-U15<br />

LOT-25<br />

MAP-U15<br />

LOT-65<br />

MAP-U15<br />

LOT-27<br />

MAP-U15<br />

MAP-U15<br />

LOT-61<br />

LOT-60<br />

MAP-U15<br />

LOT-68<br />

Map U01<br />

Lot 8-<br />

Pleasant St<br />

Swett St<br />

MAP-U15<br />

LOT-24<br />

MAP-U15 LOT-42<br />

MAP-U15<br />

LOT-67<br />

MAP-U15 LOT-3<br />

MAP-U15 LOT-4<br />

MAP-U15 LOT-5<br />

MAP-U15 LOT-6<br />

MAP-U15 LOT-7<br />

MAP-U15<br />

LOT-62<br />

MAP-U15 LOT-8<br />

MAP-U15<br />

LOT-19<br />

MAP-U15<br />

LOT-66<br />

MAP-U15<br />

LOT-98<br />

MAP-U15 LOT-97<br />

MAP-U15<br />

LOT-128<br />

MAP-U15<br />

LOT-23<br />

MAP-U15<br />

LOT-17<br />

MAP-U15<br />

LOT-15<br />

MAP-U15<br />

LOT-14<br />

MAP-U15<br />

LOT-20<br />

MAP-U15<br />

MAP-U15 LOT-64<br />

LOT-63<br />

Spring St<br />

MAP-U15<br />

LOT-22<br />

MAP-U15<br />

LOT-20A<br />

MAP-U16<br />

LOT-54<br />

MAP-U14<br />

LOT-170<br />

MAP-U15<br />

LOT-2<br />

MAP-U15<br />

LOT-16<br />

MAP-U15<br />

LOT-12<br />

MAP-U15<br />

LOT-9<br />

MAP-U15<br />

LOT-21<br />

MAP-U15<br />

LOT-18<br />

MAP-U15<br />

LOT-33<br />

MAP-U15<br />

LOT-10<br />

MAP-U16<br />

LOT-55<br />

Cushing St<br />

MAP-U15<br />

LOT-18A<br />

MAP-U16<br />

LOT-53<br />

MAP-U14<br />

LOT-95<br />

MAP-U14<br />

LOT-74<br />

Androscoggin<br />

Brunswick-Topsham<br />

Riverwalk<br />

MAP-U14<br />

LOT-96<br />

MAP-U14<br />

LOT-75<br />

MAP-U14<br />

LOT-54<br />

MAP-U14<br />

LOT-55<br />

MAP-U14<br />

LOT-56<br />

MAP-U16<br />

LOT-52<br />

MAP-U14<br />

LOT-73<br />

MAP-U14<br />

LOT-31<br />

MAP-U14<br />

LOT-34<br />

MAP-U14<br />

LOT-93<br />

MAP-U14 LOT-32<br />

MAP-U14<br />

LOT-33<br />

MAP-U14<br />

LOT-11<br />

MAP-U14<br />

LOT-97<br />

MAP-U14<br />

LOT-76<br />

MAP-U14<br />

LOT-53<br />

MAP-U14<br />

LOT-57<br />

MAP-U14<br />

LOT-35<br />

MAP-U14<br />

LOT-30<br />

MAP-U14<br />

LOT-13<br />

MAP-U16<br />

LOT-51<br />

MAP-U14<br />

LOT-98<br />

MAP-U14<br />

LOT-72<br />

MAP-U14<br />

LOT-52<br />

MAP-U14<br />

LOT-88<br />

MAP-U14<br />

MAP-U14 LOT-69<br />

MAP-U14 LOT-70<br />

LOT-71<br />

MAP-U14<br />

LOT-77<br />

MAP-U14<br />

LOT-58<br />

MAP-U14<br />

LOT-36<br />

MAP-U14<br />

LOT-89<br />

MAP-U14<br />

LOT-99<br />

MAP-U14<br />

LOT-29<br />

MAP-U14<br />

LOT-51<br />

MAP-U14<br />

LOT-28<br />

MAP-U14<br />

LOT-15<br />

MAP-U16<br />

MAP-U14<br />

LOT-100<br />

MAP-U14<br />

LOT-78<br />

High St<br />

MAP-U14<br />

LOT-59<br />

MAP-U14<br />

LOT-37<br />

MAP-U14<br />

LOT-8<br />

MAP-U14<br />

LOT-50<br />

MAP-U14<br />

LOT-27<br />

MAP-U14<br />

LOT-16<br />

MAP-U16<br />

LOT-49<br />

State Highway Mill St<br />

MAP-U14<br />

LOT-87<br />

MAP-U14<br />

LOT-101<br />

Oak St<br />

MAP-U14<br />

LOT-60<br />

MAP-U14<br />

LOT-68<br />

MAP-U14<br />

LOT-79<br />

MAP-U14<br />

LOT-49<br />

MAP-U14<br />

LOT-26<br />

MAP-U14<br />

LOT-38<br />

MAP-U14<br />

LOT-6<br />

MAP-U14<br />

LOT-17<br />

MAP-U14<br />

LOT-86<br />

MAP-U14<br />

LOT-67<br />

MAP-U14<br />

LOT-80A<br />

MAP-U14<br />

LOT-61<br />

Cumberland St<br />

MAP-U14<br />

LOT-39<br />

Dunning St<br />

MAP-U14<br />

LOT-102<br />

MAP-U14<br />

LOT-25<br />

MAP-U14<br />

LOT-5<br />

MAP-U14<br />

LOT-18<br />

MAP-U16<br />

LOT-48<br />

MAP-U14<br />

LOT-66<br />

MAP-U14<br />

LOT-47<br />

MAP-U14<br />

LOT-80B<br />

MAP-U14<br />

LOT-62<br />

MAP-U14<br />

LOT-40<br />

MAP-U14<br />

LOT-85<br />

MAP-U14<br />

LOT-103<br />

MAP-U14<br />

LOT-46<br />

MAP-U14<br />

LOT-172<br />

MAP-U14<br />

LOT-63A<br />

MAP-U14<br />

LOT-23<br />

MAP-U14<br />

LOT-24<br />

MAP-U14<br />

LOT-19<br />

Mill St<br />

MAP-U14<br />

LOT-81<br />

MAP-U14<br />

LOT-41<br />

MAP-U14<br />

LOT-1B<br />

MAP-U14<br />

LOT-132<br />

MAP-U14<br />

LOT-104<br />

MAP-U14<br />

LOT-65A<br />

MAP-U14<br />

LOT-45<br />

MAP-U14<br />

LOT-83<br />

MAP-U14<br />

LOT-82<br />

MAP-U14<br />

LOT-63<br />

MAP-U14<br />

LOT-22<br />

MAP-U14<br />

LOT-83A<br />

MAP-U14<br />

LOT-21<br />

MAP-U14<br />

LOT-64<br />

MAP-U14<br />

LOT-44<br />

MAP-U14<br />

LOT-43<br />

MAP-U14 LOT-2<br />

MAP-U14 LOT-1A<br />

Bow St<br />

MAP-U14 LOT-20<br />

MAP-U16 LOT-47<br />

MAP-U14<br />

LOT-105<br />

MAP-U14<br />

LOT-65B<br />

MAP-U14<br />

LOT-133<br />

MAP-U13<br />

LOT-5<br />

MAP-U13<br />

LOT-8<br />

MAP-U13<br />

LOT-30<br />

MAP-U13<br />

LOT-30A<br />

MAP-U13<br />

LOT-31<br />

MAP-U13<br />

LOT-46<br />

MAP-U13<br />

LOT-47<br />

MAP-U13<br />

LOT-48<br />

MAP-U13<br />

LOT-49<br />

LOT-50 THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

MAP-U16<br />

LOT-45<br />

Union St<br />

Legend<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Proposed Bike Path<br />

Proposed Connector Road<br />

Proposed Sidewalk<br />

Proposed Paved Driveway<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Lane Lines<br />

Proposed ROW<br />

New Building (Since time of photo)<br />

Demolished Building<br />

Existing Path<br />

l<br />

0 200 400 Feet<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-16<br />

Strategy 2C, Option 2<br />

Mill St 4 Lanes with Median<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


4.10 Strategy 3 – Rail Spur to the NASB<br />

Strategy 3 considers the feasibility of providing a rail spur from the MaineDOT<br />

Rockland Branch Railroad into the NASB. The intent of the spur is to provide direct<br />

freight railroad access to the redeveloped NASB. The primary focus of this<br />

evaluation is to determine the most logical means and layout for connecting a rail<br />

spur to the NASB. South of Bath Road, numerous possible track layouts can be<br />

ac<strong>com</strong>modated, pending Strategy 1 roadway layouts and final redevelopment plans<br />

for NASB facilities. Strategy 1 en<strong>com</strong>passes proposed roadways into the NASB<br />

property, which likely have implications for both layout and vertical placement of<br />

proposed tracks south of Bath Road. The existing elevation of the Rockland Branch<br />

Railroad is approximately 10 feet lower than the surface of the adjacent Bath Road. In<br />

both options, this renders grade separation – with the tracks passing beneath a<br />

proposed Bath Road overpass – more feasible than when Bath Road passes beneath<br />

the tracks.<br />

Two route options were developed for the spur, and each provides rail access to the<br />

NASB in proximity to Hangar No. 6. The two route options consider crossing Bath<br />

Road either at grade or via a grade separation where the rail spur crosses beneath<br />

Bath Road, resulting in a total of four rail-spur options. The primary difference<br />

between the two route options is the origination of the spur on the Rockland Branch<br />

Railroad and the route to Hangar No. 6 on the NASB. Conceptual cost estimates were<br />

developed to identify the capital infrastructure investment necessary to build each<br />

route option in either an at-grade or grade-separated condition beneath Bath Road.<br />

4.10.1 Options 1 and 1A<br />

Options 1 and 1A begin<br />

approximately 200 feet east of the<br />

existing at-grade crossing of the<br />

Rockland Branch Railroad and<br />

Jordan Avenue (Figures 4-17 and<br />

4-18). From the junction with the<br />

Rockland Branch Railroad, the rail<br />

spur proceeds east and then<br />

southeast, crossing Bath Road via<br />

either a grade-separated (Option 1)<br />

or at-grade (Option 1A) crossing. The rail spur continues in a southerly direction,<br />

terminating behind existing Hangar No. 6.<br />

The primary advantage of this route option is the direct access to the NASB core area,<br />

which minimizes the need for heavy site-clearing prior to construction. Option 1<br />

offers ample length to reach the existing surface elevations on NASB property if the<br />

rail spur travels beneath Bath Road, as it would for a grade-separated crossing.<br />

Summary of Options 127


The primary challenge with Option 1 is the proximity of where it crosses Bath Road<br />

relative to a proposed T-intersection that is currently part of the Strategy 1 proposals.<br />

In Option 1, with a grade-separated crossing for the intersection of the rail spur and<br />

Bath Road, the rail spur crosses beneath Bath Road roughly halfway between Jordan<br />

Avenue and the proposed T-intersection, both of which are at-grade intersections.<br />

There appears to be limited distance along Bath Road to ramp up and down for the<br />

overpass before meeting grade for Jordan Avenue and the proposed T-intersection<br />

at-grade intersections on either end. Therefore, a grade-separated crossing for the<br />

intersection of the rail spur with Bath Road may be difficult to ac<strong>com</strong>modate.<br />

Additional challenges for Options 1 and 1A include sharp-curvature geometry and a<br />

conflict with an existing airport taxiway on NASB property. An at-grade crossing of<br />

an airport taxiway is not practical; therefore, this issue must be resolved with further<br />

study by adjusting the track alignment and/or reconfiguring existing taxiways to<br />

avoid the spur. The cost estimate does not include any costs associated with<br />

reconfiguring the taxiways.<br />

4.10.2 Options 2 and 2A<br />

The route for Options 2 and 2A begins approximately 1,300 feet east of the existing<br />

at-grade industry crossing leading to Dragon Cement (Figures 4-19 and 2-20). From<br />

its junction with the Rockland Branch Railroad, the rail spur proceeds east and then<br />

southeast, crossing Bath Road via either a grade-separated (Option 2) or at-grade<br />

(Option 2A) crossing. The rail<br />

spur continues in a<br />

southwesterly direction,<br />

paralleling the existing tree<br />

line adjacent to the NASB jetfuel<br />

tank-storage site and<br />

terminating behind existing<br />

Hangar No. 6.<br />

The primary advantage of<br />

Option 2 is the distance along<br />

Bath Road that is provided<br />

between the grade-separated crossing with the rail spur and the at-grade intersection<br />

of the roadway entrance to the existing Merrymeeting Plaza Shopping Center. This<br />

distance is ample and renders a grade-separated crossing between the rail spur and<br />

Bath Road more feasible than in Option 1.<br />

The primary challenge associated with Options 2 and 2A is the circuitous route that<br />

the proposed rail spur needs to access the NASB. Additional <strong>com</strong>plications also may<br />

result from constructing the rail spur through undeveloped forest.<br />

Summary of Options 128


Town of Brunswick, Maine<br />

MAP-U04<br />

LOT-9A<br />

MAP-U04<br />

LOT-9B<br />

MAP-U04 LOT-9<br />

1<br />

£¤ Androscoggin River<br />

MAP-40 LOT-6<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6A<br />

MAP-41<br />

LOT-6B<br />

MAP-41<br />

LOT-6C<br />

Former Site of<br />

Merrymeeting Park<br />

Legend<br />

MAP-U04 LOT-8<br />

MAP-41<br />

LOT-5B<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

MAP-40 LOT-4<br />

Dragon Cement<br />

MAP-41<br />

LOT-13D<br />

MAP-41<br />

LOT-11<br />

Proposed Travel Way<br />

Proposed Bridge<br />

Jordan Av<br />

MAP-U04 LOT-14<br />

MAP-U04 LOT-3<br />

MAP-40 LOT-5<br />

MAP-41<br />

LOT-2B<br />

MAP-41 LOT-2A<br />

MAP-41 LOT-6<br />

Merrymeeting Plaza<br />

Proposed At-Grade Crossing<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

MAP-40 LOT-1<br />

MAP-40 LOT-8<br />

Proposed Paved Driveway<br />

MAP-40<br />

LOT-1A<br />

UV24<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-1<br />

MAP-41 MAP-41<br />

LOT-2 LOT-3A MAP-41 LOT-3<br />

MAP-41 LOT-4<br />

MAP-41 LOT-9<br />

BATH RD<br />

MAP-41 LOT-5<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8A<br />

MAP-41 LOT-8<br />

UV 24<br />

Proposed Grass Slope<br />

Proposed Railroad Spur Centerline<br />

Proposed ROW<br />

Existing Androscoggin River Multi-Use Path<br />

PERIMETER ROAD<br />

MAP- LOT-<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

l<br />

0 400 800 Feet<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Hanger #6<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-17<br />

Strategy 3, Option 1<br />

Western Connection<br />

Grade-Separated<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


Town of Brunswick, Maine<br />

MAP-U04<br />

LOT-9A<br />

MAP-U04<br />

LOT-9B<br />

MAP-U04 LOT-9<br />

1<br />

£¤ Androscoggin River<br />

MAP-40 LOT-6<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6A<br />

MAP-41<br />

LOT-6B<br />

MAP-41<br />

LOT-6C<br />

Former Site of<br />

Merrymeeting Park<br />

Legend<br />

MAP-U04 LOT-8<br />

MAP-41<br />

LOT-5B<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

MAP-40 LOT-4<br />

MAP-41<br />

LOT-11<br />

Proposed Travel Way<br />

MAP-U04 LOT-14<br />

MAP-U04 LOT-3<br />

Jordan Av<br />

Dragon Cement<br />

MAP-40 LOT-5<br />

MAP-41<br />

LOT-2B<br />

MAP-41 LOT-2A<br />

MAP-41 LOT-6<br />

Merrymeeting Plaza<br />

MAP-41<br />

LOT-13D<br />

Proposed Bridge<br />

Proposed At-Grade Crossing<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

MAP-40 LOT-1<br />

MAP-40 LOT-8<br />

Proposed Paved Driveway<br />

MAP-40<br />

LOT-1A<br />

UV24<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-1<br />

MAP-41 MAP-41<br />

LOT-2 LOT-3A MAP-41 LOT-3<br />

MAP-41 LOT-4<br />

MAP-41 LOT-9<br />

MAP-41 LOT-5<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8A<br />

MAP-41 LOT-8<br />

UV 24<br />

Proposed Grass Slope<br />

Proposed Railroad Spur Centerline<br />

Proposed ROW<br />

Existing Androscoggin River Multi-Use Path<br />

BATH RD<br />

PERIMETER ROAD<br />

MAP- LOT-<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

l<br />

0 400 800 Feet<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Hanger #6<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-18<br />

Strategy 3, Option 1A<br />

Western Connection<br />

At-Grade<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


Town of Brunswick, Maine<br />

1<br />

£¤ Androscoggin River<br />

MAP-41<br />

LOT-6A<br />

MAP-41 LOT-6C<br />

MAP-40 LOT-6<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6B<br />

Former Site of<br />

Merrymeeting Park<br />

MAP-41 LOT-9A<br />

Legend<br />

MAP-U04 LOT-8<br />

MAP-40 LOT-4<br />

MAP-41<br />

LOT-5B<br />

MAP-41 LOT-11<br />

Railroad<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Dragon Cement<br />

Proposed Bridge<br />

Jordan Av<br />

MAP-U04<br />

LOT-14<br />

MAP-U04 LOT-3<br />

MAP-40 LOT-1<br />

MAP-40 LOT-8<br />

MAP-40 LOT-5<br />

MAP-41<br />

LOT-2B<br />

MAP-41 LOT-2A<br />

MAP-41 LOT-6<br />

Merrymeeting Plaza<br />

MAP-41 LOT-13D<br />

MAP-41<br />

LOT-10<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Proposed Track<br />

MAP-40<br />

LOT-1A<br />

UV24<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-1<br />

MAP-41<br />

MAP-41<br />

LOT-3A<br />

LOT-2 MAP-41 LOT-4<br />

MAP-41 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8A<br />

MAP-41 LOT-8<br />

UV 24<br />

Proposed ROW<br />

Existing Androscoggin River Multi-Use Path<br />

BATH RD<br />

MAP-41 LOT-5<br />

PERIMETER ROAD<br />

MAP- LOT-<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

l<br />

0 400 800 Feet<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Hanger #6<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-19<br />

Strategy 3, Option 2<br />

Eastern Connection<br />

Grade-Separated<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


Town of Brunswick, Maine<br />

1<br />

£¤ Androscoggin River<br />

MAP-40 LOT-6<br />

MAP-41<br />

LOT-5A<br />

MAP-41<br />

LOT-6A<br />

MAP-41<br />

LOT-6B<br />

MAP-41 LOT-6C<br />

Former Site of<br />

Merrymeeting Park<br />

MAP-41 LOT-9A<br />

Legend<br />

Railroad<br />

MAP-U04 LOT-8<br />

MAP-40 LOT-4<br />

MAP-41<br />

LOT-5B<br />

MAP-41 LOT-11<br />

Existing Conservation Land<br />

Parcel Boundary<br />

Proposed Travel Way<br />

Proposed Bridge<br />

MAP-U04<br />

LOT-14<br />

Jordan Av<br />

MAP-U04 LOT-3<br />

MAP-40 LOT-1<br />

MAP-40 LOT-8<br />

Dragon Cement<br />

MAP-40 LOT-5<br />

MAP-41<br />

LOT-2B<br />

MAP-41 LOT-2A<br />

MAP-41 LOT-6<br />

Merrymeeting Plaza<br />

MAP-41 LOT-13D<br />

MAP-41<br />

LOT-10<br />

Proposed At-Grade Crossing<br />

Proposed Raised Island<br />

Proposed Paved Shoulder<br />

Proposed Grass Slopes<br />

Proposed Railroad Spur Centerline<br />

MAP-40<br />

LOT-1A<br />

UV24<br />

MAP-40<br />

LOT-2<br />

BATH RD<br />

MAP-40 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-1<br />

MAP-41<br />

MAP-41<br />

LOT-3A<br />

LOT-2 MAP-41 LOT-4<br />

MAP-41 LOT-3<br />

ROCKLAND BRANCH RAILINE<br />

MAP-41 LOT-8A<br />

MAP-41 LOT-8<br />

UV 24<br />

Proposed ROW<br />

Existing Androscoggin River Multi-Use Path<br />

BATH RD<br />

MAP-41 LOT-5<br />

PERIMETER ROAD<br />

MAP- LOT-<br />

NAVAL AIR STATION<br />

BRUNSWICK<br />

l<br />

0 500 1,000<br />

THESE PLANS DEPICT CONCEPTUAL IDEAS AND ARE SUBJECT TO CHANGE. NO<br />

DECISIONS HAVE BEEN MADE WITH REGARD TO POTENTIAL PROPERTY<br />

ACQUISITION.<br />

Hanger #6<br />

Transportation Feasibility Study<br />

Redevelopment of Naval Air<br />

Station Brunswick<br />

Figure 4-20<br />

Strategy 3, Option 2A<br />

Eastern Connection<br />

At-Grade<br />

Brunswick & Topsham Maine<br />

Sources: Town of Brunswick Public Works Department, Town of Topsham<br />

Planning Department, MaineDOT Bureau of Transportation Systems Planning, Maine GIS


4.11 Other Roadway Modification Ideas<br />

As the Feasibility Study progressed, various ideas for modifying the roadway system<br />

were suggested. These suggestions were voiced at public informational meetings,<br />

public workshops, or through the feedback link on the Study website. Each<br />

suggestion was considered in the initial screening process. However, for various<br />

reasons (e.g., failing to meet the purpose and need, falling outside the initially<br />

defined strategies, project cost, and project impact), these ideas were not advanced to<br />

the detailed-evaluation phase. Nevertheless, these ideas could be given further<br />

consideration in the future. Four of the ideas are described in this section.<br />

4.11.1 Maine Street/US Route 1 Interchange<br />

Left-turn movements from US Route 1 northbound and southbound onto Maine<br />

Street in Brunswick are currently prohibited. This left-turn prohibition is not only<br />

confusing to motorists; the prohibition is also problematic as southbound-destined<br />

motorists who are unable to turn onto Maine Street turn left onto Cushing Street,<br />

thereby impacting the residential neighborhood. Additionally, motorists destined for<br />

Topsham who are prohibited from turning onto Maine Street northbound travel<br />

through downtown Brunswick by way of Pleasant Street.<br />

As part of a separate study effort, the MaineDOT is evaluating options to address<br />

this left-turn problem. As an immediate action, the MaineDOT is proceeding with a<br />

project to reconfigure the US Route 1 southbound off-ramp at the intersection with<br />

Maine Street so as to allow left-turn movements. The planned modifications, which<br />

include the installation of traffic-signal control, are expected to be in place by 2011.<br />

In addition to this immediate action, this separate study considered potential longterm<br />

solutions such as a roundabout at the southbound ramp and a single-pointurban<br />

interchange (SPUI). The SPUI would ac<strong>com</strong>modate both southbound and<br />

northbound left-turn movements. Construction of the SPUI requires the relocation of<br />

the US Route 1 northbound on-ramp from its current location off of Mason Street to a<br />

location immediately adjacent to US Route 1 and tight to the interchange.<br />

4.11.2 New Interchange on I-295 at River Road<br />

In an effort to reduce the level of traffic congestion on Pleasant Street, it was<br />

suggested that the construction of a new interchange on I-295 at River Road be<br />

considered. The thinking was that motorists traveling between I-295 and River Road<br />

west of I-295 unnecessarily travel along Pleasant Street. Construction of a new<br />

interchange at this location would provide motorists traveling to and from the west a<br />

direct connection to I-295, thereby reducing the traffic volume on Pleasant Street.<br />

Summary of Options 133


Results of the preliminary screening suggest that less than 4 percent of the traffic<br />

traveling along Pleasant Street, west of River Road, travels to and from River Road;<br />

therefore, any reduction in traffic on Pleasant Street associated with River Road trips<br />

would be minimal. Additionally, River Road is currently classified as a collector<br />

street and would need to be upgraded to an arterial roadway to be provided direct<br />

connection to I-295. Given that land use along River Road is mostly residential,<br />

whereas Pleasant Street is mostly <strong>com</strong>mercial, any diversion of traffic from Pleasant<br />

Street to River Road could adversely impact businesses on Pleasant Street by<br />

diverting customers away and residents on River Road by increasing regional<br />

through traffic. For this reason, this idea was not advanced to the detailed-evaluation<br />

phase.<br />

4.11.3 Depressed Mill Street<br />

In an effort to better connect the riverfront area along Mill Street to the residential<br />

neighborhoods and downtown Brunswick, it was suggested that Mill Street be<br />

lowered - essentially converting Mill Street to a tunnel section. As a tunnel, Mill<br />

Street and its associated high-volume and high-speed traffic would pass through the<br />

area along its existing alignment – the only difference being that the roadway would<br />

be below grade. With the highway and the traffic below grade, the land above the<br />

tunnel could be recaptured for civic and <strong>com</strong>munity activities such as a riverfront<br />

park or other uses. The important feature of this idea is that the traffic would be<br />

removed (i.e., it would be underground) and the land above the tunnel would<br />

reconnect the riverfront with the local neighborhood and the downtown. This idea<br />

has the support of residents in the area because a petition with more than 100<br />

signatures was submitted.<br />

Results of the preliminary screening suggested that although the benefit of<br />

connecting the riverfront to the downtown and the local neighborhood would be<br />

tremendous, the cost to construct such a project is extremely high – well in excess of<br />

$100 million. For this reason, the idea was not advanced to the detailed-evaluation<br />

phase.<br />

4.11.4 Convert Pleasant Street to Two-Way<br />

The section of Pleasant Street between Mill Street and Maine Street in Brunswick is<br />

currently restricted to one-way traffic in the eastbound direction. This one-way<br />

operation ac<strong>com</strong>modates motorists entering the downtown but not those exiting. The<br />

current one-way operation also makes it difficult for residents of the area to travel<br />

westbound toward I-295. To address this problem, it was suggested that this section<br />

of Pleasant Street be converted to a two-way operation.<br />

Results of the preliminary screening suggested that with the existing and projected<br />

future traffic volume demand along Pleasant Street, the conversion to a two-way<br />

operation would cause substantial delays and congestion at the Pleasant Street/Mill<br />

Summary of Options 134


Street intersection. However, if the functional classification of the Pleasant<br />

Street/Mill Street corridor is downgraded in <strong>com</strong>bination with increasing the<br />

throughput capacity of the Coastal Connector and sufficient regional through traffic<br />

can be diverted to the Coastal Connector, it may be possible in the future to<br />

reconsider this idea.<br />

Summary of Options 135


Summary of Options 136


5<br />

Evaluation of Options<br />

5.1 Evaluation Criteria<br />

When considered in the context of the existing transportation system and<br />

environmental resources described in Chapters 2 and 3, review of the conceptual<br />

engineering plans described in Chapter 4 allows <strong>com</strong>parison of the relative benefits<br />

and impacts of each strategy and option. The methodologies and criteria used in<br />

conducting such an evaluation are described in this chapter, along with results of the<br />

analysis.<br />

5.1.1 Addressing Purpose and Need<br />

As discussed in Chapter 1, the Purpose and Need Statement defines which possible<br />

options are reasonable, prudent, and practicable. Thus, an evaluation of whether a<br />

particular strategy or option meets the Study purpose and need is an important<br />

element of the Feasibility Study. Table 5.1-2 provides guidance on how well each<br />

Study strategy and option satisfies the objectives of the Purpose and Need Statement.<br />

Following are the five questions asked in the matrix to assist in determining whether<br />

the Study objectives are met:<br />

How well does the option…<br />

Improve mobility<br />

Enhance safety<br />

Encourage multimodal mobility<br />

Ac<strong>com</strong>modate NASB travel demands<br />

Dovetail with <strong>com</strong>munity goals<br />

These questions were asked of each Study strategy and option on review of the<br />

existing crash trends in the Study Area, the 2035 DHV No Action and Build trafficoperational<br />

analysis results, and local planning initiatives and long-term plans. The<br />

questions were answered using a color-coding system that establishes green as<br />

substantially meeting the objective, yellow as moderately meeting the objective, and<br />

red as minimally or failing to meet the objective.<br />

Conclusions 137


5.1.2 Traffic Operations<br />

As previously discussed in Subsection 2.2.2, traffic operations usually are defined<br />

through LOS, which also is generally described in that subsection. Typically,<br />

feasibility and planning<br />

studies prepared for transportation infrastructure improvement projects strive to<br />

achieve LOS C or LOS D traffic operations under Build conditions. However,<br />

whereas the Towns of Brunswick and Topsham and the MaineDOT seek to<br />

encourage multimodal transportation use and reduce single-occupancy vehicles in<br />

the Study Area, this Feasibility Study and its improvement options attempt to<br />

balance the need for adequate roadway capacity by promoting TDM. Therefore, it<br />

was determined that the traffic-operations criteria for this Study could consider LOS<br />

E or LOS F operations as acceptable under Build conditions if the LOS under the<br />

specific option strongly promotes TDM for travel in the Study Area.<br />

5.1.3 Transportation Demand Management<br />

An evaluation was conducted to determine the percentage of trip reduction that<br />

could be achieved in the Study Area by implementing various levels of TDM<br />

programs. The TDM evaluation in this Feasibility Study was not conducted as a<br />

standalone Build option; it is doubtful that TDM measures alone can reduce vehicle<br />

trips to the extent that they address existing levels of congestion currently<br />

experienced in the Study Area corridors and anticipated future demands on the<br />

roadways with redevelopment of the NASB. More important, given the expressed<br />

<strong>com</strong>mitment of the local <strong>com</strong>munities to a multimodal approach of addressing<br />

transportation needs as opposed to relying solely on the continued construction of<br />

new and wider roadways, TDM actions are not considered as an either/or alternative<br />

but rather as actions that should be implemented as aggressively as possible –<br />

regardless of the implementation of other physical modifications to the<br />

transportation system.<br />

For this reason, a series of sensitivity analyses was conducted assuming various<br />

model inputs. The results were used to conduct a supplemental traffic-operational<br />

analysis of the Feasibility Study strategies and options to understand the level of<br />

operational improvement that could be achieved by implementing an aggressive<br />

areawide TDM program.<br />

The Environmental Protection Agency (EPA) COMMUTER Model Version 2 [1] was<br />

used to approximate the effect of TDM on the Study Area. Sensitivity analyses were<br />

performed for the following three separate employment populations:<br />

<br />

[1] COMMUTER Version 2.0 release from U.S. Environmental Protection Agency.<br />

Conclusions 138


the employment population for the redeveloped NASB as a site-specific analysis<br />

the 2009 employment population for the Towns of Brunswick and Topsham as<br />

both site-specific and areawide analyses<br />

the 2009 employment population for the Brunswick LMA as an areawide<br />

analysis<br />

The TDM measures outlined in Chapter 4 were included under all analysis scenarios;<br />

however, two model inputs were adjusted under the various employment scenarios<br />

to understand the range of TDM reduction that could be achieved. The first model<br />

input tested is the “Employer-Support Programs” level, which the first COMMUTER<br />

model defined as follows:<br />

Level 0: No program<br />

Level 1: Provision of information activities plus a quarter-time transportation<br />

coordinator<br />

Level 2: Level 1 plus in-house matching services for carpool and vanpool, workhours<br />

flexibility, or bicycle parking and shower activities<br />

Level 3: Level 2 plus a half-time transportation coordinator plus preferential<br />

parking for carpool and vanpool, on-site transit pass sales, or secure bicycle<br />

parking and local infrastructure improvements for bicycle travel<br />

Level 4: Level 3 plus a full-time transportation coordinator plus additional<br />

financial and technical support for carpool and vanpool, guaranteed ride home,<br />

or workplace promotional activities<br />

The three population groups considered in the TDM evaluation considered<br />

Employer-Support Program Levels 2 and 4. GOMAINE serves as the transportation<br />

coordinator for the Brunswick/Topsham area; therefore, regardless of whether<br />

individual employers have their own transportation coordinator, the application of<br />

the Level 4 Employer-Support Program is appropriate for the evaluation.<br />

The second COMMUTER model input adjusted for analysis purposes is parking<br />

costs that contemplate higher parking rates charged for single-occupancy vehicles<br />

than for carpool or vanpool vehicles. The two scenarios evaluated to test the<br />

sensitivity of higher parking costs for single-occupancy vehicles included increases of<br />

$1 and $2 per day.<br />

Section 5.2 discusses results of the TDM evaluation for each strategy and option<br />

evaluated.<br />

Conclusions 139


5.1.4 Cost Estimates<br />

Planning-level cost estimates (FY 2010 dollars) were generated for each option and<br />

presented in the evaluation matrix (see Table 5.1-1). The cost elements include<br />

construction, right-of-way acquisition, and construction engineering. The derived<br />

cost estimates are shown as a range to account for the potential costs of unknown<br />

elements.<br />

Construction Cost Estimates<br />

Identifying an order-of-magnitude construction cost estimate for the five strategies<br />

first entailed the <strong>com</strong>pletion of planning-level study concepts that denote the design<br />

elements based on stakeholder input and that meet the overall project purpose and<br />

need. The Feasibility Study concepts were <strong>com</strong>pleted using 2006 true-color, highresolution<br />

aerial-photography base information provided by the Towns of Brunswick<br />

and Topsham. Additional aerial mapping was derived from 2009 color aerial<br />

photography provided by the National Agricultural Imagery Program.<br />

Topographical data, collected in November 2006 as 2-foot interval contour lines,<br />

were provided by the MaineGIS. The Study concepts were <strong>com</strong>pleted by using the<br />

available imagery and mapping and then supplementing this information with field<br />

reconnaissance and a <strong>com</strong>pilation of previous construction plans and documents<br />

from the MaineDOT and the <strong>com</strong>munities of Brunswick and Topsham.<br />

The Study concepts reflect a level of design that includes development of planninglevel<br />

plans, profiles (when necessary), typical roadway cross sections, and critical<br />

cross sections that establish a footprint for each strategy and option, which then<br />

serves as the basis for preparing a planning-level construction cost estimate.<br />

Preparation of the order-of-magnitude construction cost estimate for each strategy<br />

and option included the following process:<br />

Prepare a list of assumptions regarding how the estimate would be developed.<br />

Define appropriate unit prices to develop an opinion of construction costs.<br />

Prepare roadway typical standards, as necessary, to identify a cost-per-mile<br />

estimate for each roadway type.<br />

Complete preliminary <strong>com</strong>puter-model runs, as necessary, to develop order-ofmagnitude<br />

earthwork quantities<br />

Complete order-of-magnitude roadway quantity takeoffs for significant<br />

construction items (e.g., clearing, grubbing, loam, guard rail, and overhead<br />

signs).<br />

Identify anticipated retaining wall locations; estimate length and height.<br />

Identify bridge costs on per-square-foot cost basis; estimate bridge span length<br />

and width.<br />

Identify signal locations and associated system costs.<br />

Conclusions 140


The estimate worksheet 21 identifies key cost items, including the following:<br />

roadway length and typical section used to develop cost<br />

bicycle path length and typical section used to develop cost<br />

guard rail<br />

retaining walls and bridges<br />

clearing and grubbing<br />

loam and seed<br />

earthwork (i.e., excavation and embankment volumes)<br />

drainage and miscellaneous item percentages<br />

maintenance of traffic and uniform officers percentages<br />

general interchange and intersection lighting<br />

signal costs<br />

water-quality and pollution-control items<br />

number of detention basins<br />

mobilization<br />

overhead sign structures<br />

construction engineering and contingencies<br />

Right-of-Way Cost Estimates<br />

Establishing order-of-magnitude cost estimates for ROW acquisition needs for the<br />

five strategies first involved establishing the existing property and ROW<br />

boundaries. Information pertaining to ROW and property in the Study Area was<br />

obtained from 2008 and 2009 GIS parcel mapping, including assessment records<br />

provided by the Towns of Brunswick and Topsham, respectively. Using the<br />

construction impact footprint developed for each strategy and option where<br />

additional ROW acquisitions would be necessary, new ROW boundaries were<br />

developed to establish the potential property acquisitions needed to construct and<br />

maintain the proposed improvement. By <strong>com</strong>paring the proposed ROW needs for<br />

each option with the existing ROW boundaries, the areas of land and building<br />

acquisitions were established.<br />

The estimated costs of the takings and acquisitions impacts for each option were<br />

based on the values of real property contained in the assessment database for the two<br />

<strong>com</strong>munities. Assessed value does not necessarily reflect the actual purchase price<br />

that might be achieved through a negotiated transaction for each potentially<br />

<br />

Conclusions 141


impacted property. However, using this data provides for a consistent valuation<br />

across all properties being considered. Therefore, it offers a reasonable surrogate to a<br />

more detailed property-appraisal process that would be conducted in a future project<br />

phase.<br />

The potential property acquisitions were divided into two primary categories: partial<br />

and full. The land values for partial takings were based on an average value per acre<br />

of land for all properties expected to be impacted by the option being evaluated. For<br />

full takings, which involve the <strong>com</strong>plete acquisition of land and/or buildings, the<br />

total assessed property value contained in the assessment database was used to<br />

estimate the impact. The assessment ratio of properties in Topsham reportedly was<br />

close to 100 percent at the time of this analysis; therefore, the estimated cost impacts<br />

of Topsham properties may reflect more closely potential purchase prices. However,<br />

according to the Town of Brunswick assessor, the assessment ratio of real property<br />

was estimated at only 60 percent of market value, which means that potential<br />

acquisition costs for project options in Brunswick could be significantly higher than<br />

the estimates provided.<br />

5.1.5 Environmental Evaluation – Resources and Methods<br />

Understanding the potential impacts on environmental and social resources is<br />

another important element of the Feasibility Study. To review these issues, an<br />

impact analysis of each option was conducted.<br />

As described in Chapter 2, available GIS data for the Study Area were obtained<br />

from various state agencies, MaineGIS, and the local level. In addition, existing<br />

environmental information was verified and updated in the field based on a<br />

reconnaissance-level effort. Information pertaining to ROW and property in the<br />

Study Area was obtained by 2008 and 2009 GIS parcel mapping, including<br />

assessment records, provided by the Towns of Brunswick and Topsham,<br />

respectively.<br />

Potential impacts then were calculated using a GIS overlay analysis, in which the<br />

footprint of each roadway option was overlaid onto the various environmental<br />

resources. Table 5.1-2 summarizes the metrics used to evaluate these resources.<br />

Impacts presented in this Feasibility Study must be interpreted cautiously. First,<br />

only direct impacts were considered. However, certain resources (i.e., historic<br />

buildings and historic districts) can be affected indirectly. Second, all identified<br />

impacts are preliminary estimates because they are based on preliminary rough<br />

grading without site-specific survey contours or detailed engineering. Third,<br />

resource mapping relies primarily on landscape-level environmental data rather<br />

than detailed site-specific studies that would be required during a formal NEPA<br />

or permit evaluation. The impacts, however, are still useful and appropriate for<br />

<strong>com</strong>paring the relative impacts of options within a strategy.<br />

Conclusions 142


Table 5.1-1. Environmental Evaluation Metrics<br />

Resource/Impact<br />

Wetlands<br />

Water Quality<br />

Floodplains<br />

Aquifer<br />

Farmland<br />

Rare, Threatened, Endangered Species/Habitat<br />

Parkland & Recreation<br />

ROW Displacement<br />

Historic/Archeological Resources<br />

Hazardous Waste<br />

Construction Cost<br />

ROW Cost<br />

Estimated Annual Tax Loss<br />

Metric<br />

Acres of Dredge/Fill<br />

Number of Stream Crossings<br />

Acres of New Pavement<br />

Acres of New Pavement<br />

Acres of Disturbance<br />

Acres of Disturbance<br />

Acres of Disturbance<br />

Within the Proposed Project Footprint<br />

Acres of Full Acquisition<br />

Acres of Partial Acquisition<br />

Number of Known Archeological Sites<br />

Number of Standing Potential Structures<br />

Within the Proposed Project Footprint<br />

2010 Dollars<br />

2010 Dollars<br />

2010 Dollars<br />

5.2 Options Evaluation<br />

This section summarizes evaluation results for each strategy and option considered<br />

in this Feasibility Study, as well as evaluation results for the No Action Option.<br />

Figure 5-1 shows the 2035 DHV LOS for each option. Table 5.1-2 tabulates impacts<br />

and costs of each option and provides a green, yellow, or red rating to demonstrate<br />

how well each option meets the objectives of the Study.<br />

Section 5.2.2 describes the potential effect of the various TDM measures on peak<br />

traffic demands (i.e., DHV) in the Study Area. As discussed in Chapter 4,<br />

supplemental analyses were performed for each Build Option considering the<br />

implementation of an aggressive TDM program in the Study Area and region. The<br />

level of improvement in traffic operations associated with the TDM reduction in<br />

DHV is described for each applicable Build Option.<br />

5.2.1 No Action<br />

The No Action Option is the continuation and perpetuation of the existing<br />

transportation infrastructure in the Study Area. Therefore, the No Action analysis<br />

scenario does not consider any physical roadway or intersection improvements in the<br />

Study Area (except those previously discussed in Chapter 3). However, it assumes<br />

that traffic volumes will continue to grow to the design year 2035, including<br />

redevelopment of the NASB and Topsham Annex. As shown in Figure 5-1, the No<br />

Action Option results in the substantial degradation of traffic operations at eight of<br />

the Study Area signalized intersections along State Route 196, Pleasant Street, and<br />

Conclusions 143


Bath Road. The following signalized intersections are all expected to experience 2035<br />

DHV demands that exceed existing capacity:<br />

State Route 196 and US Route 201<br />

State Route 196 and Village Drive/Community Way<br />

Pleasant Street and Church Street<br />

Pleasant Street and River Road/Webster Street<br />

Pleasant Street and Mill Street/Stanwood Street<br />

Bath Road and Federal Street/Sills Drive<br />

Bath Road and Merrymeeting Plaza<br />

Bath Road and US Route 1 Ramps/Gurnet Road<br />

Of these eight intersections, four are projected to operate at LOS F and three at LOS E<br />

under the 2035 DHV condition.<br />

In addition to the signalized intersections, several of the unsignalized Study Area<br />

intersections are projected to substantially deteriorate under the No Action Option.<br />

Poor traffic operations under 2009 existing conditions will continue to degrade at the<br />

unsignalized intersections of US Route 201 and Canam Drive, US Route 201 and<br />

Eagles Way, Maine Street and the US Route 1 southbound off-ramp, and Maine<br />

Street and Mason Street. In addition, at the intersection of State Route 196 and the US<br />

Route 1 southbound on-ramp, unsignalized left turns from State Route 196 to the onramp<br />

are projected to degrade from LOS B under 2009 existing conditions to LOS E<br />

under 2035 DHV conditions.<br />

5.2.2 Travel Demand Management<br />

The TDM sensitivity analysis suggests that the implementation of moderate<br />

measures (i.e., Employer-Support Program Level 2 and $1/day increase in parking<br />

costs for single-occupancy vehicles) could result in a 1 to 4 percent reduction in peakhour<br />

traffic volume demands in the Study Area for all three employment populations<br />

considered. However, with the implementation of the more aggressive program (i.e.,<br />

Employer-Support Program Level 4 and $2/day increase in parking costs for singleoccupancy<br />

vehicles), the percent reduction could range from 13 to 16 percent.<br />

Noting the strong local- and state-level <strong>com</strong>mitment for promoting TDM in the Study<br />

Area and the region, the supplemental analyses conducted for each of the applicable<br />

Build Options applied a reduction factor of 10 percent to all local traffic, which is<br />

defined for the purpose of this evaluation as all 2035 DHVs except regional through<br />

traffic on US Route 1 and State Route 196. Adjusting for the split of regional through<br />

traffic versus local traffic on these two corridors results in an effective reduction<br />

factor ranging from 6 to 8 percent for the US Route 1 and State Route 196 corridors.<br />

Again, all other movements were reduced by 10 percent.<br />

Conclusions 144


TABLE 5.1-2 Evaluation Matrix (Build Options Only)<br />

Conclusions 146


5.2.3 Build Options<br />

A traffic-operations analysis, similar to the analysis of existing conditions, was<br />

conducted for the future 2035 DHVs. The analyses were conducted for each Build<br />

option considered for each Strategy.<br />

5.2.3.1 Strategy 1 – Direct Access to US Route 1<br />

Transportation Operations<br />

As described in Chapter 4, Strategy 1 considers three interchange options to improve<br />

direct access to and from US Route 1 and the NASB: Option 1 is the trumpet/loop<br />

interchange; Option 2 is the flyover interchange; and Option 3 is the split-diamond<br />

interchange.<br />

The results of the operational analyses show that each ramp movement at US Route 1<br />

(i.e., merge, diverge, and weave movements) for Options 1 and 2 operate at LOS D or<br />

better. The southbound on-ramp merge movement for both options shows an LOS D<br />

operation with all other ramp movements operating at LOS C or better.<br />

All ramp movements for Option 3 operate at LOS C or better. Additionally, the four<br />

signalized intersections located on the two connector roadways for Option 3 operate<br />

at LOS B<br />

or better. The aggressive TDM program results in modest improvement for all<br />

movements with all three options. However, for most intersections and ramp<br />

movements, the LOS is unchanged.<br />

It is important that the US Route 1 southbound off-ramp to the Coastal Connector<br />

interchange is projected to operate at LOS F by 2035. With implementation of an<br />

aggressive TDM program, the operation improves to LOS E. Nevertheless,<br />

consideration should be given – perhaps in a future planning study – to<br />

reconfiguring the interchange so that the Coastal Connector and the segment of US<br />

Route 1 north of the Connector are aligned as the highway mainline and the segment<br />

of US Route 1 southwest of the Connector being subordinate. Incidentally, this type<br />

of reconfiguration is consistent with the idea of encouraging regional through traffic<br />

to use the Coastal Connector in Topsham rather than Pleasant Street in Brunswick.<br />

The idea of directing regional through traffic to the Coastal Connector was suggested<br />

by many people throughout the public input process.<br />

All three options result in reduced traffic volume demands along Bath Road and<br />

Gurnet Road, which improves traffic operations. The intersection at Bath Road and<br />

Merrymeeting Plaza is projected to improve from LOS E under the No Action<br />

condition to LOS C for each of the three options - with and without the<br />

implementation of TDM. Similarly, the intersection at Bath Road and US Route<br />

Conclusions 147


1/Gurnet Road is projected to improve from LOS F to LOS C and the intersection of<br />

Gurnet Road and Forrestal Drive/Lee’s Tire is projected to improve from LOS C to<br />

LOS B.<br />

In general, each of the three options either moderately or substantially meets the five<br />

study objectives. As for the objectives of “improving mobility” and “ac<strong>com</strong>modating<br />

NASB travel demands,” Option 3 is rated as moderately meeting the objectives as<br />

<strong>com</strong>pared to Options 1 and 2, which are rated as substantially meeting them. Options<br />

1 and 2 provide direct free-flow ramps as <strong>com</strong>pared to Option 3, which includes a<br />

series of traffic-signal–controlled intersections.<br />

Environmental Impacts<br />

The locations of the proposed interchanges providing direct access from US Route 1<br />

into the NASB for Options 1 and 2 occupy the same general area. Therefore, these<br />

two options affect similar environmental resources but differ slightly due to different<br />

footprints associated with each. However, Option 3 is located closer to Cooks Corner<br />

(i.e., to the east relative to Options 1 or 2); therefore, it affects a different set of<br />

environmental resources, which are discussed in the following subsections.<br />

Environmental Resources<br />

Option 1 and 2 would both impact a large scrub-shrub/forested wetlands, located<br />

just west of the Merrymeeting Plaza on State Route 24 (i.e., Bath Road). Additionally,<br />

the “trumpet/loop” portion of Option 1 would be located on the north side of<br />

US Route 1, impacting a second emergent wetlands system. Potential impacts to<br />

wetlands for Strategy 1 range from 1.2 acres (Option 3) to 4.0 acres (Option 1).<br />

Stream-crossing impacts range from one stream crossing associated with Option 1 to<br />

three stream crossings associated with Option 3.<br />

The primary measure for water quality used in this Feasibility Study is the number of<br />

new impervious surfaces associated with the construction of each option (i.e.,<br />

measured as the number of acres of new pavement). Option 1 has the largest project<br />

footprint of the three options evaluated and therefore would have a slightly larger<br />

impact on water quality than Option 2 or 3. However, potential water-quality<br />

impacts can be managed through the use of appropriate water quality best<br />

management practices (BMPs) including stormwater detention and treatment<br />

structures. Such measures would be designed if any of the options is selected for<br />

advancement to preliminary design.<br />

All options for Strategy 1 would impact the floodplains with Option 1 having the<br />

greater impact on these resources than Options 2 and 3. The “trumpet/loop”<br />

footprint of Option 1 would be located primarily within the Zone AE floodplain<br />

associated with the Androscoggin River. This is one of the more notable impacts<br />

associated with any of the proposed options and would require discussion with<br />

resource agencies such as the Maine DEP and the U.S. Army Corps of Engineers<br />

Conclusions 148


(USACE) if it is selected for advancement to preliminary design. The conceptual<br />

engineering <strong>com</strong>pleted as part of this Study allows for neither calculation of the<br />

volume of floodplain fill nor a hydraulic analysis of potential effects on the river.<br />

Nevertheless, the proposed footprint of the project within the 100-year floodplain is<br />

relatively substantial for Option 1 (3.8 acres) <strong>com</strong>pared to Option 2 (1.9 acres) and<br />

Option 3 (1.5 acres).<br />

All of the options in Strategy 1 would impact portions of the aquifer associated with<br />

the Androscoggin River, ranging from about 4.4 to 6.2 acres depending on the<br />

option.<br />

Options 1 and 2 would impact identified habitat of several rare, threatened, or<br />

endangered species located at the northern terminus of the NASB runways.<br />

Options 1 and 2 both impact approximately 1.6 acres of upland sandpiper (Bartramia<br />

longicauda, a state-threatened bird) and grasshopper sparrow (Ammodramus<br />

savannarum, a state-endangered bird) habitat. These two species depend on the<br />

presence of open grasslands for their continued existence. Additionally, Option 1<br />

would impact 2.9 acres of Inland Wading Bird and Waterfowl Habitat located on the<br />

north side of US Route 1. Option 3 avoids these impacts.<br />

Right-of-Way Impacts<br />

Option 1 would affect the largest amount of privately owned land (33.0 acres),<br />

consisting of the full acquisition of two properties totaling 11.6 acres and an<br />

additional partial acquisition of 10 properties on 21.4 acres. Option 2 would require<br />

the full acquisitions needed for Option 1 but fewer partial acquisitions, totaling 14.6<br />

acres.<br />

One of the impacts associated with the acquisition of ROW is the removal of land<br />

from taxable status. This effect is similar for all three options in Strategy 1: impacts to<br />

the Town of Brunswick range from an estimated $15,200 annual tax loss for Option 2<br />

to about $21,400 for Option 3.<br />

Cultural Resources<br />

In general, previously disturbed areas in this area retain minimal archeological<br />

sensitivity except for the former Merrymeeting Park, which would be impacted by<br />

Options 1 and 2. No archeological studies concerning investigations at the Park were<br />

provided by MHPC. Further research into previous studies connected with the Park<br />

should be <strong>com</strong>pleted to determine if archeological features are likely to occur within<br />

the interchange option. Areas not previously disturbed outside of the Park vicinity<br />

also may contain archeological sensitivity. A 1996 study by Louis Berger Associates<br />

indicates that small upland sites are likely to occur landward of the Androscoggin<br />

River in locations near headwater streams or on wetlands margins. Such locations<br />

appear to occur in all three options, as follows: Options 1 and 2, south of US Route 1<br />

and north of the Rockland Branch Railroad; Option 3, south of Bath Road on the east<br />

side of the NASB.<br />

Conclusions 149


In terms of standing structures, the area does not contain any buildings or structures<br />

that are more than 45 years old, except for what appears to be a fragment of a wood<br />

bridge railing within the site of the former Merrymeeting Park north of US Route 1.<br />

The area is characterized by more recently constructed <strong>com</strong>mercial developments<br />

and trailer parks. \<br />

5.2.3.2 Strategy 2A - Improved Mobility along State<br />

Route 196 and US Route 201<br />

Transportation Operations<br />

Strategy Area 2A involves roadway improvements to three distinct areas and<br />

evaluates five improvement scenarios, as follows:<br />

I-295 southbound on-ramp (Option 1)<br />

State Route 196/US Route 201 intersection and widening improvements (Options<br />

2, 2A, 3, and 3A)<br />

US Route 201 intersection and roadway improvements at the Topsham Annex<br />

(Options 4 and 5)<br />

Option 1 consists of installing a traffic signal on State Route 196 at the I-295<br />

southbound ramp. The option also involves extending the length of the existing State<br />

Route 196 westbound left-turn lane. The purpose of this option is to safely and<br />

efficiently ac<strong>com</strong>modate motorists turning left onto the I-295 southbound ramp. With<br />

this option in place, operations are projected to improve from LOS E under the No<br />

Action unsignalized condition to LOS A. The option substantially meets each<br />

Feasibility Study objectives except encouraging multimodal mobility.<br />

Option 2 consists of the construction of a two-lane roundabout at the State Route<br />

196/US Route 201 intersection. The concept of the roundabout was developed and<br />

evaluated at this intersection because it was believed – as a suggested at the public<br />

workshop – that it would efficiently process the heavy east-west Coastal Connector<br />

traffic flow while simultaneously introducing a traffic-calming effect that would<br />

reduce travel speeds and, as a result, enhance the safe and efficient movement of<br />

pedestrians and bicyclists. However, results of the operational analyses show the<br />

westbound approach (i.e., motorists entering the roundabout from the Coastal<br />

Connector) operating at LOS F. Additionally, the aggressive TDM program would<br />

reduce the volume of traffic at the roundabout, but the westbound approach would<br />

still operate at LOS F.<br />

Options 3 and 3A consist of grade-separating the Coastal Connector/US Route 201<br />

intersection by having the Coastal Connector bridge over US Route 201. Access to US<br />

Route 201 from the Coastal Connector would be provided by way of connector<br />

Conclusions 150


oadways located on the northeast and southeast quadrants of the intersection. The<br />

connector roadway on the northeast quadrant intersects US Route 201 opposite 5th<br />

Street, whereas the southeast quadrant connector roadway intersects US Route 201 at<br />

Monument Place.<br />

Results of the operational analyses show that the two signalized intersections<br />

(Option 3) operate at LOS C. The connector roadway intersection opposite 5th Street<br />

would improve to LOS B, whereas the intersection opposite Monument Place would<br />

remain at LOS C with the aggressive TDM program. The two roundabout<br />

intersections (Option 3A) operate at LOS E. However, with the aggressive TDM<br />

program, both roundabout intersections improve to LOS C. Options 3 and 3A each<br />

substantially meet the objectives of improving mobility, enhancing safety,<br />

ac<strong>com</strong>modating NASB travel demands, and dovetailing with <strong>com</strong>munity goals, but<br />

only moderately meet the objective of encouraging multimodal mobility.<br />

Option 4 calls for widening the Coastal Connector to four lanes. As a result, traffic<br />

operations at the signalized intersection of the Coastal Connector and Village<br />

Drive/Community Way are projected to improve from LOS F under the No Action<br />

condition to LOS B with and without the aggressive TDM. Option 4 substantially<br />

meets the objectives of improving mobility, enhancing safety, ac<strong>com</strong>modating NASB<br />

travel demands, and dovetailing with <strong>com</strong>munity goals but only moderately meet<br />

the objective of encouraging multimodal mobility.<br />

Option 5 involves the realignment of Canam Drive and Old Augusta Road to form a<br />

single four-way signalized intersection with US Route 201 that serves as the primary<br />

access to the redeveloped Topsham Annex. This new intersection would provide<br />

access to properties with redevelopment potential that are located on the west side of<br />

US Route 201; it also would provide a connection to Route 196 – potentially at the<br />

Topsham Fair Mall intersection. Under this option, the new signalized intersection is<br />

projected to operate at LOS C with and without aggressive TDM as <strong>com</strong>pared to the<br />

LOS F operation for motorists exiting an unsignalized Canam Drive under the No<br />

Action scenario. Similar to Options 3, 3A, and 4, Option 5 substantially meets the<br />

objectives of improving mobility, enhancing safety, ac<strong>com</strong>modating NASB travel<br />

demands, and dovetailing with <strong>com</strong>munity goals but only moderately meets the<br />

objective of encouraging multimodal mobility.<br />

Environmental Impacts<br />

Options 2 and 2A have a relatively smaller footprint than Options 3 and 3A due to<br />

the proposed connector roads on new alignment associated with Options 3 and 3A.<br />

Thus, Options 3 and 3A would have greater impact on natural and socioeconomic<br />

resources. The project footprint for these two options is similar in size, with an<br />

additional 15.5 and 14.2 acres of new pavement required for Options 3 and 3A,<br />

respectively. Option 4 also involves additional roadway width, although this<br />

additional footprint would be located along the existing State Route 196 (Coastal<br />

Connector).<br />

Conclusions 151


Limited environmental resources are located adjacent to US Route 201. Thus, the<br />

roadway improvements associated with Option 5 would have a minor impact on<br />

them, primarily associated with the proposed realignment of the US Route 201/Old<br />

Augusta Road intersection and a new connector road linking US Route 201 and<br />

Canam Drive. The relative impacts of these options are discussed in the following<br />

subsections.<br />

Environmental Resources<br />

Intersection and roadway improvements for Option 1 are limited to the existing<br />

ROW of State Route 196 (Lewiston Road) and therefore would have negligible<br />

impacts to environmental resources.<br />

Wetlands impacts associated with Options 2 and 2A would be relatively minor, with<br />

Option 2 requiring about 1.3 acres of wetlands impact (including four stream<br />

crossings) and Option 2A totaling less than 0.1 acre (only one stream crossing).<br />

Construction of the connector roads for Options 3 and 3A would require additional<br />

wetlands filling associated with a perennial stream that receives flow from a<br />

stormwater ditch originating at Mt. Ararat High School. (Additional wetlands<br />

impacts would result from the widening of the State Route 196 Coastal Connector to<br />

four lanes [i.e., Option 4]). The area of wetlands impact for the two options would be<br />

almost identical, with Options 3 and 3A resulting in 2.5 and 2.6 acres of impact,<br />

respectively. Additionally, both options would require as many as 13 stream<br />

crossings impacting a total of as much as quarter-mile of stream channel. Option 4<br />

would impact approximately 1.3 acres, or approximately 50 percent fewer wetlands<br />

than Options 3 and 3A.<br />

Approximately 0.2 acre of forested wetlands and emergent ditch would be impacted<br />

by the realignment of intersection with US Route 201 and Old Augusta Road (Option<br />

5). Only the northern edge of the wetlands would be impacted by construction;<br />

minimal impact is expected because most of the wetlands is located to the south.<br />

Impacts to streams are not anticipated.<br />

There are no floodplains located in the Strategy 2A Study Area. The eastern portion<br />

of the Strategy 2A Study Area is underlain by a sand and gravel aquifer. The<br />

widening associated with State Route 196 (Option 4) would impact approximately 4.8<br />

acres of this aquifer.<br />

Options 3 and 3A would both impact 4.1 acres of prime farmland soils, as designated<br />

by the NRCS, and approximately 10.5 acres of farmland soil of statewide importance.<br />

Of the 4.1 acres of impact to prime farmland soils, 3.6 acres would be associated with<br />

the widening of State Route 196. Impacts to prime farmland soils would be<br />

minimized by Option 2, whereas only 1.6 acres of farmland soil of statewide<br />

importance would be impacted. A large mowed field located east of the existing<br />

Conclusions 152


intersection of US Route 201 and Old Augusta Road would be impacted by Option 5,<br />

resulting in approximately 3.5 acres of farmland soil of statewide importance<br />

impacted.<br />

Clothed sedge and dry land sedge are known to occur on both sides of the utility<br />

corridor located south of Eagle’s Way. Less than 0.1 acre would be impacted by<br />

Options 2, 2A, 3, and 3A. Options 1, 4, and 5 do not impact this resource.<br />

Right-of-Way Impacts<br />

None of the options require full acquisition of any parcels in this Strategy. However,<br />

the connector road associated with Options 3 and 3A would require several acres of<br />

partial acquisitions, in addition to the ROW needed for the two new intersections on<br />

US Route 201. A total of approximately 9.1 acres of partial acquisition on 33<br />

properties is required for Option 3. Option 3A would require slightly more<br />

acquisition, 9.2 acres, on 31 privately owned parcels. Property acquisitions are<br />

relatively smaller in Options 2 and 2A, in which approximately 2.5 and 1.5 acres of<br />

partial acquisitions are required, respectively.<br />

The location of the northern connector road for both Option 3 and Option 3A<br />

requires a small acquisition of the Mount Ararat Baseball Fields, which represents an<br />

impact that would require further review pursuant to Section 4(f) of the USDOT Act.<br />

No other impacts to public parks or recreational facilities would result from any of<br />

the other options.<br />

Cultural Resources<br />

A limited number of detailed archeological studies have been undertaken in this<br />

strategy Study Area. The <strong>com</strong>pleted studies were conducted primarily on the<br />

Topsham Fairgrounds and along the Androscoggin River. It is anticipated that at<br />

least two potential sensitivity areas for archeological resources exist for new<br />

construction in Options 2, 2A, 3, and 3A.<br />

A small number of standing structures 45 years or older are located in the vicinity of<br />

Strategy 2A and may be impacted by one or more option. Although none of the<br />

buildings appear to be National Register–eligible, none has been previously<br />

inventoried on MHPC forms. The structures are mainly single-family residential and<br />

date from c. 1870 to c. 1925.<br />

Located south of the intersection of Main Street and Lewiston Road are a small ca.<br />

1880 front-gable house on Second Street and a one-story brick and concrete post<br />

office building at 101 Main Street, which dates to 1962 and would be impacted by<br />

Options 2, 2A, 3, and 3A. The post office displays a typical design of those from the<br />

early 1960s with a one-story, flat-roofed rectangular form, cutaway corner with<br />

recessed entry, and multipane rectangular windows.<br />

Conclusions 153


Neither building appears to be National Register–eligible; however, each property<br />

would be inventoried on MHPC inventory forms for National Register evaluation if<br />

they are affected by future projects pursued as a result of this Feasibility Study.<br />

Option 5 requires the acquisition of approximately 4.8 acres of ROW to realign the<br />

intersection and the connector road. The majority of the ROW acquisition would<br />

affect a farm <strong>com</strong>plex at the intersection of US Route 201 and Old Augusta Road,<br />

which en<strong>com</strong>passes a ca. 1870 Italianate house and several outbuildings, including<br />

an English barn surrounded by open rolling land. The house has been altered by the<br />

application of vinyl siding and large dormers and the barn is partially sheathed with<br />

asphalt shingles, which diminishes the possibility of the <strong>com</strong>plex being eligible for<br />

the National Register. Nevertheless, this property is potentially historic and may<br />

require additional study. Although no preexisting archeology surveys have been<br />

<strong>com</strong>pleted in the area affected by Option 5, at least two areas sensitive for<br />

archeological resources would be impacted.<br />

5.2.3.3 Strategy 2B – Improve Mobility along Pleasant<br />

Street<br />

Transportation Operations<br />

The focus of Strategy 2B is to improve the efficient movement of traffic, provide<br />

access to businesses, and decrease automobile dominance along the Pleasant Street<br />

corridor. The three basic options include a traffic-calming boulevard (Option 1), an<br />

urban boulevard (Option 2), and a five-lane cross-section (Option 3). All three<br />

options include secondary connector roadways (i.e., access management) that<br />

provide a connection to one of the major intersections along the corridor, thereby<br />

allowing left-turn movements at these controlled locations. Additionally, a variation<br />

of Options 1 and 2 (i.e., Options 1A and 2A) considers relocating the River Road<br />

intersection to the west side of the Hyundai dealership, forming a four-way<br />

intersection with the fourth leg providing access to property on the south side of<br />

Pleasant Street. Option 3 evaluates a five-lane cross section that includes two<br />

through-travel lanes in each direction and a center two-way left-turn lane.<br />

All three options call for a roundabout at the intersection of US Route 1 and the Exit<br />

28 Connector, which is projected to operate at LOS C and improving to LOS B with<br />

the aggressive TDM program. All three options also call for the installation of a<br />

signal at the intersection of Pleasant Street and Range Road, which is projected to<br />

operate at LOS A. Last, all three options include a signalized intersection at Pleasant<br />

Street and Mill Street/Stanwood Street; this intersection is projected to operate at<br />

LOS C <strong>com</strong>pared to LOS F under the No Action condition.<br />

At the intersection of Pleasant Street and Church Street, Option 1 calls for the<br />

implementation of a roundabout, which is projected to operate at LOS F but<br />

improving to LOS D with the aggressive TDM program. Options 2 and 3 call for<br />

Conclusions 154


etaining a signalized intersection at this location, which is projected to operate at<br />

LOS D or better <strong>com</strong>pared to LOS F under No Action.<br />

Similar to the Church Street intersection, Option 1 calls for a new roundabout at the<br />

intersection of Pleasant Street and River Road/Webster Street, whereas Options 2<br />

and 3 call for retaining traffic-signal control. The roundabout is projected to operate<br />

at LOS E but improve to LOS D with the aggressive TDM program. The signalized<br />

intersection is projected to operate at LOS C for both Options 2 and 3 with and<br />

without TDM.<br />

Options 1 and 1A substantially meet the objectives of improving mobility, enhancing<br />

safety, ac<strong>com</strong>modating NASB travel demands, and dovetailing with <strong>com</strong>munity<br />

goals but only moderately meet the objective of encouraging multimodal mobility.<br />

Options 2 and 2A meet the objectives at a similar level except for dovetailing with<br />

<strong>com</strong>munity goals, which was rated as moderately meeting that objective. Option 3,<br />

the five-lane cross-section, substantially improves mobility and substantially<br />

ac<strong>com</strong>modates NASB travel demand, moderately enhances safety, but only<br />

minimally encourages multimodal mobility and dovetails with <strong>com</strong>munity goals.<br />

Environmental Impacts<br />

Strategy 2B, which is defined by the Pleasant Street (US Route 1) corridor from Exit<br />

31 to Mill Street, currently exists as an urbanized landscape with limited natural<br />

resources present in the strategy area. The footprints associated with Options 1 and 2<br />

are identical along Pleasant Street, except at the intersections of Church Road and<br />

River Road, where Option 1 calls for roundabouts and Option 2 calls for traffic<br />

signals. Option 3 requires the least amount of new pavement (i.e., 7.8 acres) and<br />

causes the least environmental impact.<br />

Environmental Resources<br />

As previously mentioned, limited natural resources exist in the strategy area, and<br />

those present are located along the margins of the Study Area. For example, based on<br />

current concept plans and current mapping, wetlands and stream impacts are<br />

expected to be negligible.<br />

The potential water-quality impacts are similar among all options because each<br />

requires a similar amount of new pavement, ranging from 7.8 acres (Option 3) to 9.2<br />

acres (Option 2A). All of the options would similarly impact two areas of Zone AE<br />

floodplains associated with two unnamed perennial streams, totaling 0.2 acre.<br />

Furthermore, each option would impact a similar amount of the sand and gravel<br />

aquifer, ranging from 3.9 acres (Option 3) to 5.7 acres (Options 1A and 2A).<br />

More important, there are a substantial number of potential hazardous-material sites<br />

present within the corridor that would need to be considered as part of the<br />

construction for any option. Each option could impact at least 10 known hazardousmaterial<br />

sites, many of them underground petroleum tanks. Although each site<br />

Conclusions 155


would warrant further investigation during final design to minimize health and<br />

safety risks, it is expected that the research would determine that most of them pose<br />

no substantial risk.<br />

Right-of-Way Impacts<br />

The urbanized landscape associated with Pleasant Street means that construction<br />

within this corridor would result in greater ROW acquisition costs and affect a larger<br />

population than any of the other strategies. All of the options require full acquisition<br />

of approximately 5.5 acres of private property. Additional partial ROW acquisition is<br />

needed, ranging from 1.5 acres (Option 1) to 1.7 acres (Option 3). Options 1A and 2A,<br />

both of which involve the relocation of River Road, have the greatest <strong>com</strong>bined<br />

impact on ROW acquisition. The corresponding loss of tax base is estimated to range<br />

from $32,000 to $81,000.<br />

Cultural Resources<br />

No known archeology sites exist within the corridor, and it is not anticipated that<br />

any sensitive archeology areas would be affected by any of the options. However,<br />

Strategy Area 2B contains approximately 10 potentially historic structures, primarily<br />

located along the south side of Pleasant Street. Option 1 takes two former houses at<br />

113 and 115 Pleasant Street, which now serve as offices. The building located at 113<br />

Pleasant Street is a ca. 1915 four-square house; 115 Pleasant Street is a side-gable,<br />

four-bay house with a central chimney that may date to the early 19th century or<br />

even earlier, but the windows and front entrance appear to have been altered. The<br />

Paul Street/Turner Street connector road south of Pleasant Street in all four options<br />

runs through the rear of three parcels containing older buildings (i.e., 133 Pleasant<br />

Street, a more recent motel structure with two ca. 1870 houses in the rear; 139<br />

Pleasant Street, a ca. 1940s single-family house; and 141 Pleasant Street, a ca. 1890<br />

front-gable house with a rear shed). The small ca. 1920 bungalow at 6 Robinson<br />

Avenue would be acquired for the Owen Street connector between Church Road and<br />

Pleasant Street in all options except Option 3.<br />

The area in which the Westminster Avenue connector will be built (proposed in all<br />

four options) to connect River Road and Pleasant Street contains smaller residences<br />

that date from the 1870s through the 1920s, along with more recently constructed<br />

houses. No potentially historic buildings would be acquired for the connector road.<br />

The Lombard Street connector, Pleasant Street, and Stanwood Street on the west side<br />

of this portion of the Study Area would be located adjacent to 15 Lombard Street, a<br />

single-family residence that appears to date to the 1950s. Lombard Street north of this<br />

house contains early 20th-century bungalows as well as mid-20 th -century singlefamily<br />

houses.<br />

An inventory of all buildings older than 45 years would be required to fully<br />

understand potential impacts to historic structures, although it is not anticipated that<br />

any of these properties are NRHP–eligible.<br />

Conclusions 156


5.2.3.4 Strategy 2C – Improve Mobility along Mill Street<br />

Transportation Operations<br />

Options 1 and 2 for Strategy 2C examine a three- and a four-lane median divided<br />

cross section for Mill Street, respectively. The three-lane option consists of two<br />

northbound travel lanes and one southbound travel lane separated by a raised-center<br />

median. The four-lane option provides two northbound and two southbound travel<br />

lanes. From a traffic-operational perspective, the four-lane section (Option 2) is<br />

needed to process the projected DHVs. Anything other than the four-lane section will<br />

result in substantial delay. However, throughout the public-input process,<br />

considerable <strong>com</strong>ments suggested that regional through traffic should be encouraged<br />

to use the Coastal Connector. The thinking is that to encourage the redistribution of<br />

traffic to the Coastal Connector will necessitate motorists experiencing substantial<br />

delay.<br />

Option 1 substantially meets the objective of enhancing safety but only moderately<br />

meets the objectives of improving mobility, encouraging multimodal mobility,<br />

ac<strong>com</strong>modating NASB travel demands, and dovetailing with <strong>com</strong>munity goals.<br />

Option 2 substantially meets the objectives of improving mobility, enhancing safety,<br />

and ac<strong>com</strong>modating NASB travel demands but only moderately meets the objectives<br />

of encouraging multimodal mobility and dovetailing with <strong>com</strong>munity goals.<br />

Environmental Impacts<br />

Strategy 2C, located along the Mill Street urban corridor, is bounded by high-density<br />

residential development to the south and east and the Androscoggin River to the<br />

north. The primary natural resource located in this strategy area is the Androscoggin<br />

River and its associated floodplains. Socioeconomic resources include an adjacent<br />

residential neighborhood, potential historical resources, recreational facilities, and<br />

private property. The two options developed for this strategy are similar in terms of<br />

alignment and overall footprint.<br />

Environmental Resources<br />

Both options avoid wetlands and stream crossings and neither would impact<br />

aquifers, farmland soils, or threatened or endangered species. The two options add<br />

approximately 1.5 acres of new impervious surface, and both would impact about 0.2<br />

acre of the Zone AE floodplains by widening the overall cross section of Mill Street.<br />

No other impacts to natural resources are anticipated.<br />

Right-of-Way<br />

The Mill Street canoe portage, a property located at the corner of Mill Street and<br />

Pleasant Street, would be impacted by the slope limits of each option but would<br />

remain functional. This impact is anticipated to be less than 0.1 acre, occurring<br />

Conclusions 157


immediately adjacent to the north side of Mill Street. The proposed ROW for both<br />

options is identical, requiring the acquisition of about 0.9 acre of new ROW. The tax<br />

implications are relatively minor and are estimated at $4,500 for both options.<br />

Cultural Resources<br />

From an archeological perspective, it is anticipated that the entire area may be<br />

sensitive for archeological resources due to the proximity of the Androscoggin River.<br />

A series of smaller older houses, dating mainly from the mid-19th to the early 20th<br />

century, line the south side of Mill Street west of Union Street to Cumberland Street.<br />

These houses were neither previously inventoried or listed in the NRHP nor are they<br />

within the Village Review District. It is anticipated that three of the structures may be<br />

impacted by the widening associated with Options 1 and 2.<br />

Along Mill Street, west of Cushing Street in the Village Review District, the<br />

demolition and construction of any landscape structure (e.g., sidewalks, retaining<br />

walls, and intersection improvements) are subject to MHPC review.<br />

The Androscoggin River Railroad Bridge, a through truss bridge located on the<br />

Lewiston Lower Branch Rail Line, needs to be inventoried because the bridge is<br />

likely to be eligible for the NRHP. Proposed modifications to the entry to the bridge<br />

from US Route 1 also need to be reviewed by the MHPC. In addition, the building at<br />

U15, Lot 3 (i.e., 73 Mill Street, which is a full acquisition) needs to be inventoried, but<br />

it is not likely to be NRHP-eligible.<br />

5.2.3.5 Strategy 3 – Rail Spur to NASB<br />

Strategy 3 entails construction of a new rail connection from the existing Rockland<br />

Branch Railroad to the NASB. Portions of the Study Area for this strategy overlap<br />

with Strategy 1, and the two strategies affect some of the same resources. Two<br />

locations for the possible future rail connection were investigated: a western and an<br />

eastern alignment. Additionally, at-grade and grade-separated options were<br />

considered for each alignment.<br />

Options 1 and 2, which call for grade-separated crossings, substantially meet the<br />

objectives of improving mobility, encouraging multimodal mobility, ac<strong>com</strong>modating<br />

NASB travel demands, and dovetailing with <strong>com</strong>munity goals but only moderately<br />

meet the objective of enhancing safety. Options 1A and 2A, which call for at-grade<br />

intersections, substantially meet the objectives of encouraging multimodal mobility,<br />

ac<strong>com</strong>modating NASB travel demands, and dovetailing with <strong>com</strong>munity goals but<br />

only moderately meet the objective of improving mobility and minimally meet the<br />

objective of enhancing safety.<br />

Conclusions 158


Environmental Impacts<br />

Environmental Resources<br />

Both alignments avoid impacts to wetlands, streams, and rivers, and no hazardousmaterial<br />

sites were found in the footprint of the proposed rail alignments. Neither<br />

alignment requires a substantial amount of new pavement, which would limit the<br />

potential for future stormwater impacts. However, the open fields at the northern<br />

end of the NASB runways contain habitat for two protected bird species that depend<br />

on open grasslands: the state-threatened upland sandpiper and state-endangered<br />

grasshopper sparrow. Understanding the potential impacts to these species is an<br />

important issue if Strategy 3 is selected for advancement. Because the western<br />

options affect more of this grassland habitat, it is expected that Options 1 and 1A<br />

would have a greater effect on these species. Additionally, the western options<br />

would have more potential impact to the sand and gravel aquifer found in this area.<br />

Right-of-Way<br />

The western options (Options 1 and 1A) require slightly more ROW acquisition than<br />

the eastern options (Options 2 and 2A), estimated at approximately 7 acres or about 6<br />

acres, respectively. Most of this ROW impact would occur to land currently within<br />

the NASB, with some minor strip takings along Bath Road (i.e., State Route 24). For<br />

this reason, the tax-loss implications of this strategy are quite limited because NASB<br />

property has not previously been on the tax rolls. No park or recreation areas would<br />

be affected.<br />

Cultural Resources<br />

No standing structures would be directly affected by either rail-connection option;<br />

therefore, the potential for impacts to historic buildings is very low. However, as<br />

discussed for Strategy 1, previous archeological studies established a number of<br />

historic and prehistoric archeological sites in this area. Additional field surveys of the<br />

area of potential impact would need to be conducted to adequately understand<br />

potential effects to archeological resources that may result from the construction of<br />

the rail connection.<br />

Airspace Obstruction Analysis<br />

Strategy 3 Options 1, 1A, 2, and 2A, which provide direct freight rail-spur access to<br />

the NASB, were examined to determine if they had any impact to the NASB airspace<br />

for Runways 19R and 19L. Options 1 (grade-separated) and 1A (at-grade) are located<br />

approximately 700 feet east of Runway 19 and fall within the controlling airspace<br />

obstruction departure surface. Options 2 (grade-separated) and 2a (at-grade) are<br />

located approximately 0.5 mile farther east of Runway 19L and out of the direct<br />

influence of the NASB runway obstruction departure surface and not subjected to<br />

any further evaluation. Options 1 and 1A were evaluated to identify potential<br />

conflicts in the form of obstructions, hazards to air navigation, and air-service<br />

limitations that may arise from bringing rail service into the airport. Option 1, as<br />

Conclusions 159


proposed, raises the elevation of Route 24, thereby creating a higher roadway and<br />

subsequent vehicle profile with the railroad passing under Route 24. Option 1A<br />

crosses Route 24 at-grade with a higher rail-vehicle profile, bringing both options<br />

closer to the NASB airspace for Runway 19L.<br />

Federal Aviation Regulations (FAR) Part 77, Obstructions Affecting Navigable Airspace,<br />

requires notice to be filed to the FAA for proposed structures meeting certain criteria.<br />

If obstruction standards are not exceeded, the FAA issues a Determination of Does<br />

Not Exceed (DNE) or a Determination of No Hazard (DNH). If obstruction standards<br />

are exceeded, the FAA issues a Notice of Presumed Hazard (NPH), which notifies<br />

the sponsor that the structure would exceed obstruction standards, lists the height to<br />

which the structure should be lowered so as not to exceed obstruction standards, and<br />

finally advises that if the sponsor wishes to pursue the originally requested height,<br />

further aeronautical study by the FAA is necessary to determine hazard status.<br />

A preliminary evaluation was <strong>com</strong>pleted to determine if the development of an<br />

Option 1 or Option 1A rail spur into the NASB would exceed obstruction standards<br />

and, if so, whether it would constitute a hazard to air navigation. The preliminary<br />

evaluation reviewed the geometric configuration of the imaginary surfaces for<br />

Runway 19L as defined in FAR §77.25, generally referred to as Part 77 imaginary<br />

surfaces. These surfaces were obtained from a draft copy of the 19L Inner Approach<br />

Surfaces plan dated October 2, 2009, and provided by the MaineDOT. Utilizing the<br />

Runway 19L existing runway configuration and based on available contour<br />

elevations, both Option 1 and Option 1A top-of-obstruction elevation heights did not<br />

penetrate the Part 77 horizontal surface height (i.e., 40:1 departure surface). For<br />

Option 1, the obstruction elevation is approximately 94 feet whereas the<br />

corresponding Part 77 surface elevation is approximately 109 feet (-15 feet). For<br />

Option 1A, the rail-vehicle obstruction elevation is approximately 90 feet, falling<br />

below the Part 77 surface elevation of approximately 101 feet (-11 feet). However, the<br />

analysis is preliminary and does not consider the arrangement of rail within the<br />

NASB or how the future redevelopment of the NASB will be classified as<br />

obstructions to air navigation by the FAA. It would be subject to further aeronautical<br />

study to determine potential hazards to air navigation.<br />

Conclusions 160


6<br />

Conclusions<br />

The purpose of this Feasibility Study is to determine the nature and extent of<br />

transportation enhancements aimed at improving mobility and access in support of<br />

the redevelopment of the NASB. Five specific needs or strategies were previously<br />

identified for evaluation. These needs were provided to the MaineDOT by the<br />

Governor’s Advisory Council and formulated through the previous NASB Reuse<br />

Master Plan study efforts conducted by the MRRA. The five needs are as follows:<br />

‣ Provide direct access to US Route 1 from the NASB.<br />

‣ Improve mobility along State Route 196 (Coastal Connector) from Interstate-<br />

295 (I-295) (Exit 31) to US Route 1, including the State Route 196/US Route<br />

201 intersection and US Route 201 north to Old Augusta Road.<br />

‣ Improve mobility between I-295 (Exit 28) along Pleasant Street and Maine<br />

Street in Brunswick to State Route 123.<br />

‣ Improve mobility along Mill Street in Brunswick from Pleasant Street to State<br />

Route 196.<br />

‣ Extend the existing rail spur into the NASB.<br />

To be successful, the proposed transportation solutions also must dovetail with the<br />

near- and long-term goals of the <strong>com</strong>munities of Brunswick and Topsham, which<br />

include minimizing NASB-related trips through downtown Brunswick and<br />

residential districts and maintaining and enhancing livable <strong>com</strong>munities. To achieve<br />

this objective, the study applied a context sensitive planning approach, which<br />

consisted of:<br />

‣ Balancing safety, mobility, <strong>com</strong>munity, and environmental goals.<br />

‣ Applying flexibility in the application of standards.<br />

‣ Maintaining a multimodal mindset.<br />

‣ Incorporating aesthetics into the decision process.<br />

‣ Involving the public early and continuously.<br />

Based on results of the evaluation and extensive public input, the following<br />

overarching plan elements were identified:<br />

‣ Improve the safe and efficient movement of vehicular traffic through access<br />

management.<br />

‣ Reduce the dominance of vehicular traffic by introducing traffic calming.<br />

Conclusions 161


‣ Encourage multimodal mobility through enhanced pedestrian and bicyclist<br />

ac<strong>com</strong>modations and through the support of public transportation.<br />

‣ Limit the need to continually increase roadway capacity by the<br />

implementation of aggressive TDM strategies and by the willingness to<br />

accept some level of traffic congestion on the roadway system.<br />

The range of multimodal transportation options considered in this Feasibility Study<br />

includes highway, rail, bicycle, and pedestrian options in Brunswick and Topsham.<br />

In addition, the Study examines the potential effect of travel demand on Study Area<br />

roadways associated with the implementation of various levels of Transportation<br />

Demand Management (TDM) measures.<br />

Given the expressed <strong>com</strong>mitment of the local <strong>com</strong>munities to a multimodal approach<br />

to addressing transportation needs in favor of solely relying on the continued<br />

construction of new and wider roadways, TDM actions are presented in this Study<br />

not as an either/or alternative but rather as actions that should be implemented as<br />

aggressively as possible – regardless of the implementation of other physical<br />

modifications to the roadway system.<br />

With regard to the interchange options that were evaluated to provide a direct<br />

connection between the NASB and US Route 1, the results - at a planning level -<br />

suggest that although each option does have impacts, the concept of constructing a<br />

new direct-connection interchange is feasible. However, the pursuit of this strategy<br />

would likely require the preparation of an Environmental Impact Statement or an<br />

Environmental Assessment as a provision of the National Environmental Policy Act<br />

(NEPA) of 1969. The NEPA study would examine the project options and impacts in<br />

greater detail and also entail additional in-depth public involvement. Given that this<br />

improved access is critical to the redevelopment of the NASB reaching its full<br />

potential, the general public support of this strategy voiced during the Feasibility<br />

Study, and the time needed to conduct such an in-depth study, the MaineDOT<br />

should consider pursuing this strategy as an early-action item. Project funding<br />

should be programmed prior to the initiation of the NEPA study.<br />

With regard to the strategies to improve mobility along the Coastal Connector,<br />

Pleasant Street, and Mill Street, consensus still must be reached on a fundamental<br />

question: whether the functional characteristics of these three principal arterials<br />

should be changed so as to encourage through traffic to use the Coastal Connector.<br />

This sentiment was voiced by many throughout the Feasibility Study’s publicparticipation<br />

process. If the decision is to encourage regional through traffic to use<br />

the Coastal Connector and as a result reclassify (i.e., downgrade) Pleasant Street and<br />

Mill Street, then options such as the widening of the Coastal Connector to a uniform<br />

four lanes and grade-separating the Route 196/Route 201 intersection should be<br />

pursued early, followed by the traffic-calming options considered for Pleasant Street.<br />

These options also may require NEPA action.<br />

.<br />

Conclusions 162


Because the secondary connector roadways, which <strong>com</strong>prise an important<br />

<strong>com</strong>ponent of the Pleasant Street access-management plan, are likely to be<br />

implemented over time as properties along the corridor redevelop, the full<br />

implementation of the Pleasant Street modifications may be phased and take many<br />

years. However, installation of the gateway roundabout at the Exit 28 Connector/US<br />

Route 1 intersection could be considered early on. This action would serve to begin<br />

the transition of the Pleasant Street corridor from its current automobile-dominant<br />

character to a corridor that ac<strong>com</strong>modates multiple modes of travel, including the<br />

movement of pedestrians.<br />

Other physical roadway modifications that could be considered for early<br />

implementation include the following:<br />

‣ Installation of the traffic signal and the lengthening of the left-turn lane at the<br />

intersection of Route 196 and the I-295 Exit 31 southbound on-ramp.<br />

‣ Construction of the pedestrian overpass of Mill Street.<br />

‣ Depending on timing of the redevelopment of the Topsham Annex,<br />

realignment of Canam Drive and Old Augusta Road to form a single fourway<br />

signalized intersection on State Route 201.<br />

Ultimately the decision as to which of the alternatives will be advanced for<br />

additional study or for implementation will involve further discussion between the<br />

MaineDOT and the Towns of Brunswick and Topsham. Nevertheless, the Study<br />

Advisory Committee, in its final Advisory Committee meeting, discussed project<br />

priorities and suggested the following as high priority actions.<br />

‣ Advance the Strategy 1 interchange alternatives for providing direct<br />

connection between the NASB and US Route 1 for additional study as a<br />

provision of the National Environmental Policy Act (NEPA). The NEPA<br />

study would examine the alternatives and impacts in greater detail. The<br />

study would also include additional in-depth public involvement.<br />

‣ Conduct a temporary test program to evaluate modifications to highway<br />

directional signage along I-295. The purpose of this “pilot” program would<br />

be to test the effectiveness of signage directing regional through traffic to the<br />

Coastal Connector (Exit 31) while encouraging the use of Exit 28 by motorists<br />

destined to businesses in Brunswick. It will be important to involve and gain<br />

the support of the Pleasant Street business <strong>com</strong>munity prior to initiating the<br />

“pilot” program.<br />

‣ Advance the widening of the Coastal Connector, recognizing that additional<br />

consideration as to the preferred solution for the Route 196/Route 201<br />

intersection will still need to take place.<br />

Conclusions 163


Appendix A<br />

Upon review of the study findings, the Brunswick Town Council, the Topsham Board of<br />

Selectmen, and the Midcoast Regional Redevelopment Authority each adopted a<br />

resolution endorsing certain transportation improvements, related to the<br />

redevelopment of the Naval Air Station Brunswick, in Topsham and Brunswick, ME.<br />

Copies of each of the adopted resolutions is provided in this Appendix A<br />

Appendix A


Appendix B<br />

Throughout the study, the public has been asked to submit their thoughts and<br />

<strong>com</strong>ments through the project website, by mail, or by submitting <strong>com</strong>ment forms at<br />

project public meetings.<br />

The submitted public <strong>com</strong>ments are provided in this Appendix B<br />

Appendix B


From: wwilkoff@gwi.net<br />

Sent: Saturday, August 29, 2009 8:47 PM<br />

To: Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I am a member of the Bicycle and Pedestrian Advisory Committee to the Brunswick Town Council. I attended the<br />

first public meeting and plan to attend the others and work shops. I have several concerns. The first is that the Route<br />

1 interchange should include a high quality bicycle and pedestrian bike access to the existing Androscoggin<br />

Bike/Pedestrian path. By high quality I mean one that is safe and accessible for the cyclist of average ability and<br />

experience. The bicycle access to the Rte 196 bypass at the other end of the bike path is not of high quality. It forces<br />

one into fast traffic on a turn. Most cyclists familiar with the area will choose to ride on the pedestrian sidewalk<br />

which is much safe, but this obviously causes conflict with pedestrians. My second concern is that study should look<br />

closely and consider bicycle and pedestrian access (again high quality) at all of the proposed access points to the<br />

Base that were spelled out in the original master plan. Again thanks for listening. Will Wilkoff, Brunswick<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: mrb@smemaine.<strong>com</strong><br />

Sent: Monday, August 31, 2009 1:32 PM<br />

To: Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Please add me to your mailing list. Mark Bergeron<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: chrisbak52@yahoo.<strong>com</strong> [mailto:chrisbak52@yahoo.<strong>com</strong>]<br />

Sent: Thursday, September 03, 2009 11:26 PM<br />

To: Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

One issue your study might look at why has been a lot of demand for industrial and <strong>com</strong>mercial zoned land in west<br />

Brunswick, but relatively little interest in east Brunswick - including at the base property. People are being paid a lot<br />

of money to create “pipe dreams” about all the jobs that will be located at the base, but so far that hasn’t turned out<br />

to be the reality. I have wondered if possibly the traffic delays on Route 1 through Brunswick may be a contributing<br />

factor to employers preference for west Brunswick. Also I don’t see any need for this new base entrance. There used<br />

to be thousands of people working on the base and that was a problem at rush hour on Route 24, but now there don't<br />

seem to be any problems surrounding traffic access to the base. Instead of some base entrance what we really need is<br />

improvements to Route 1 through Brunswick, including making it a limited access highway. Chris Baker<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: nwheel@sus<strong>com</strong>-maine.net [mailto:nwheel@sus<strong>com</strong>-maine.net]<br />

Sent: Saturday, September 05, 2009 5:50 PM<br />

To: Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I certainly hope that any road improvements will include bicycle paths in as many parts of Brunswick as possible.<br />

We have noticed a big increase in interest in cycling as a mode of transportation along our road (the Durham Road),<br />

yet it is very dangerous with no paved path for bicycles. Including bike paths along our major arteries would be key<br />

to making this a bike-friendly town. Think big and think future! Thank you. Genie Wheelwright<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

1


From: missysdad@hotmail.<strong>com</strong> [mailto:missysdad@hotmail.<strong>com</strong>]<br />

Sent: Friday, September 11, 2009 7:16 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Have you ever thought of making the coastal connector into a loop Instead of it ending at route 1, extend it as far as<br />

bath road with an exit for both directions of bath road and a new exit to access the base property. The loop could go<br />

back around to route 1 and perhaps include an exit to main street or federal street as well. This means that the base<br />

would now be very accesesible from I295 while eliviating some of the traffic from pleasant street if people took the<br />

196 exit on I295 and got to town using the coastal connector. 90% of all your pleasant street traffic <strong>com</strong>es from the<br />

I295 exit so why not give people an easy option. Michael Laverdiere<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: Rex Harrison<br />

To: Beth Brogan ; Jim McCarthy<br />

Cc: Marty Kennedy ; Anna Breinich ; Gary Brown<br />

Sent: Monday, September 14, 2009 3:22 PM<br />

Subject: Re: BNAS reuse transportation study<br />

Hello again,<br />

Thank you Beth for responding to my request to forward my message concerning the reuse of the BNAS property.<br />

I don't mind my message being included in the Opinion Page of The Times Record, but I would request Jim<br />

McCarthy that you leave out my personal health information. I don't mind having my piece edited to shorten the<br />

content but please please don't change my sense of cooperation and the inclusion of many different ideas, no matter<br />

their thought.<br />

To Marty Kennedy, Anna Breinich and Gary Brown, you see my full message (slightly revised from my original<br />

version sent to Beth.) I hope my thoughts can/will be included with all the others to make a sound decision for the<br />

benefit of the entire region.<br />

Again, my thoughts and prayers go out to everyone involved and I wish you much success.<br />

V/R<br />

Rex J. Harrison<br />

----- Original Message -----<br />

From: "Beth Brogan" <br />

To: "Rex Harrison" ; "Jim McCarthy" <br />

Sent: Monday, September 14, 2009 11:16 AM<br />

Subject: Re: BNAS reuse transportation study<br />

> Hi Rex,<br />

> Thanks for sharing your thoughts. I will certainly keep your e-mail for<br />

> background material as I cover this in the future.<br />

> I've also forwarded it to Jim McCarthy, our Opinion Page editor, for<br />

> consideration as a Commentary on our Opinion Page.<br />

> <strong>Final</strong>ly, I'll give you the e-mail address of the lead consultant working<br />

> on the transportation study. His name is Marty Kennedy at Vanasse Hangen<br />

> Brustlin: mkennedy@<strong>VHB</strong>.<strong>com</strong>.<br />

2


You might also forward your thoughts to Director of Planning Anna<br />

> Breinich (abreinich@brunswickme.org) and/or Town Manager Gary Brown<br />

> (gbrown@brunswickme.org) both of whom are on the advisory board to the<br />

> study.<br />

><br />

> Thanks again,<br />

> Beth Brogan<br />

><br />

> Rex Harrison wrote:<br />

>> Hello Beth,<br />

>><br />

>> My name is Rex J. Harrison and I live in Bath. I am writing<br />

>> in reference to your article, "BNAS reuse transportation study calls<br />

>> for public input," in /The Times Record/ newspaper, Friday, August 28,<br />

>> 2009 (it was very well written.)<br />

>><br />

>> My reason for writing you is that hopefully you can/will<br />

>> forward this message to the Maine Department of Transportation,<br />

>> Midcoast Regional Redevelopment Authority (MRRA) and other involved<br />

>> agencies.<br />

>><br />

>> I am rated as 100% disabled by the VA and recently learned<br />

>> that I now have Parkinson's Disease as well. I do not do well in<br />

>> public, thus my writing you this message. I create a distraction<br />

>> detrimental to public meetings. So I ask that you please do what you<br />

>> can to forward these ideas. Also, please forgive me in advance for<br />

>> being so long winded with my descriptions. One of my many drawbacks<br />

>> in life.<br />

>><br />

>> I do not expect all of these ideas to be used 100% as stated,<br />

>> or not even at all. I do hope though, that if these ideas are not<br />

>> used as written that they might jog someone else's gray matter to use<br />

>> them to <strong>com</strong>e up with a better idea. The more ideas the better.<br />

>><br />

>> I also read the Thursday, September 4, 2009 article and am encouraged by<br />

>> what I read. Again, my ideas are offered freely and hopefully someone<br />

>> else can build upon them. I just hope I'm not too late.<br />

>><br />

>> Over the last couple of years, I've read that several traffic issues<br />

>> (among other things) include:<br />

>><br />

>> 1. Growing traffic pressure on the Cooks Corner intersection.<br />

>> 2. Growing traffic pressure on Brunswick's Pleasant Street.<br />

>> 3. The need for a new entrance to the BNAS property that also<br />

>> connects to Rt 1 and I-295.<br />

>> 4. The need for rail service to be extended in/onto the BNAS property.<br />

>> 5. An alternate route from Main Street in Topsham and Rt 1 to Rt 196.<br />

>> 6. How to entice businesses to move onto the BNAS property.<br />

>><br />

>> I'd like to say these are not the only traffic issues the<br />

>> state of Maine has with this geographic area. I think I can offer a<br />

>> solution that could offer a viable solution to all these issues, and more.<br />

>><br />

>> First, I think we have a safety issue that is bigger than any<br />

>> of these other problems. I love Parkview Hospital and the way it's<br />

>> laid out. It has a separate entrances for emergency vehicles and<br />

3


everyday traffic for doctor visits and hospital visitors. I also love<br />

>> Mid-Coast Hospital but I think the engineers who designed the traffic<br />

>> flow must have been smoking something funny! The hospital has but one<br />

>> main entrance and a smaller entrance that goes through a residential<br />

>> area. The majority of the traffic has to enter at the main entrance<br />

>> on the Old Bath Road and follow a winding road that leads to the<br />

>> medical office building(s.) The Emergency Room is located on the far<br />

>> side of the parking lot. I understand the winding road will enable<br />

>> more medical-type building lots to be sold and developed. But I'd<br />

>> hate to be the person in an ambulance who's had a stroke or heart<br />

>> attach and needs "every available second" in the Emergency Room.<br />

>> Not only is the hospital grounds a negative factor, but any emergency<br />

>> vehicle heading to Mid-Coast has to travel on the Old Bath Road from<br />

>> Bath, and deal with the traffic congestion at Cooks Corner whether<br />

>> they <strong>com</strong>e from the West, off Rt 1 or from Harpswell. Oh yeah, they<br />

>> could also be <strong>com</strong>ing from the Old Brunswick Road. All of these<br />

>> vehicles also get caught up in the traffic at the two stop lights in<br />

>> front of WalMart and Lowes.<br />

>><br />

>> My first point though, is to say that the entire region that<br />

>> depends on Mid-Coast Hospital (as opposed to Parkview) has a potential<br />

>> calamity on their hands. If someone should die on the way to the<br />

>> hospital because they got caught up in heavy traffic, that would be<br />

>> horrible. But what would happen if there was a huge accident, such as<br />

>> a train derailment or business emergency like a fire or chemical<br />

>> explosion What would those traffic jams around Cooks Corner mean to<br />

>> you then. And who wants to be the person who is in the<br />

>> emergency vehicle in heavy traffic Emergencies don't just happen to<br />

>> the guy next door, they could happen to any and everyone - from<br />

>> Wiscasset to Lisbon, from Bailey's Island to Bowdoinham. They could be<br />

>> a visiting dignitary, a tourist or anyone of the town counselors or<br />

>> selectmen from Bath, Brunswick or Topsham - or they could be just an<br />

>> ordinary citizen.<br />

>><br />

>> My second point is that creating a new connection to Rt 1 onto<br />

>> the BNAS property is a little short-sighted. All you will be doing by<br />

>> adding a new connection is add to the already congested problems of<br />

>> Rt 1 North into Brunswick (Pleasant Street) and the Topsham Bypass.<br />

>><br />

>> My third point is that there is more money available now than<br />

>> there ever has been or likely will be for decades to <strong>com</strong>e. The State<br />

>> of Maine needs to take advantage of the fact that we had road projects<br />

>> ready for construction the day the stimulus money was released. The<br />

>> state <strong>com</strong>pleted those projects to the delight of the relevant<br />

>> authorities. There's money available, but only if we get our act<br />

>> together with proposals for more road work. Planners and Developers,<br />

>> please don't drag your feet and loose out on the unique monetary<br />

>> incentive. Study hard but quickly, make your call, then make it<br />

>> work. You won't be able to please everyone, but delaying things and<br />

>> loosing out on federal funding is ludicrous.<br />

>><br />

>> My proposal for a viable solution will help solve these three<br />

>> points I've made. In reverse order, there is plenty of money<br />

>> available to do everything I will mention. An added plus to the<br />

>> State's argument is that not only do we have new projects ready to go,<br />

>> but we are also dealing with the redevelopment of the BNAS property,<br />

4


and the things it could pay for.<br />

>><br />

>> Next (in reverse order) my suggestion would give the entire<br />

>> region an extra means to get on/off I-295, greatly reduce the traffic<br />

>> flow on Pleasant Street, give yet another entrance/exit to the BNAS<br />

>> property, and take even more pressure off the Cooks Corner<br />

>> intersection. Bonuses would be a quicker traffic pattern to points<br />

>> North on Rt 1 - and - more development possibilities down the road.<br />

>> This might also help by extending and developing the other side to Rt 196.<br />

>><br />

>> /<strong>Final</strong>ly, my proposals;/<br />

>><br />

>> (A.) On Rt 1, where the old Bath Lumber property is located<br />

>> on the Old Bath Road, just past of golf driving range in East<br />

>> Brunswick, there is part of the old lumber business that's never been<br />

>> sold or developed since that business closed - how long ago now I'm<br />

>> sure John Morse would love to get rid of it, even if by eminent<br />

>> domain. Across the Old Bath Road, There is a small patch of woods and<br />

>> a Jeep dealership that closed (not the VW part, just the Jeep<br />

>> portion.) On the other side (West side) of Rt 1 is part of a mobile<br />

>> home park. I've never been allowed to look at the topo maps South of<br />

>> Rt 1, but I'd think the state could build a new overpass on Rt 1, into<br />

>> the old Bath Lumber property, past the car dealership and past the<br />

>> Northeast side of Mid-Coast Hospital, directly next to the Emergency<br />

>> Room (again, for EVERYBODY'S benefit). That new road could connect<br />

>> to an improved Harding Rd.<br />

>><br />

>> (B.) On I-295, at mile 24, improve the on/off ramp heading<br />

>> North to include on/ff ramps heading South. Connect that road to (an<br />

>> improved) Pleasant Hill Road. Following the Pleasant Hill Road East<br />

>> towards Brunswick, just past the Woodside Road, build a new road that<br />

>> connects the Pleasant Hill Road to Maquoit Road, and (the new road)<br />

>> continues on to Mere Point Road, where it would merge with Middle Bay<br />

>> Road. This road would continue on to Rt 123 and the existing entrance<br />

>> of the BNAS property in the Southwest corner corner of said property.<br />

>> This road should continue East, over to Rt 24, (it could also connect to<br />

>> existing roads leading into the BNAS property) where it would connect<br />

>> to a new road that connects Rt 24 (just North of Ward Circle) to a new<br />

>> four way (vice the existing three-way) intersection of Meadows Road,<br />

>> Thomas Point Road and Adams Road. This proposed road extends to I-295<br />

>> and Rt 1 to the West and connects to Rt 24 on the East. It could also<br />

>> have intersections with the majors roads just South of Brunswick.<br />

>> Adams Road would be improved to connect to the new road that passes<br />

>> the East side of Midcoast Hospital and the new intersection on the Old<br />

>> Bath Road that connects to the new overpass (as mentioned in "A" above.)<br />

>><br />

>> (C.) Theoretically, a driver heading to Bath with no intention of stopping<br />

>> for anything in Brunswick (<strong>com</strong>muters and delivery trucks) and<br />

>> beyond, could exit I-295 on this new bypass, drive past the Southern<br />

>> End of the BNAS property, cross Rt 24 and connect with Rt 1 North just<br />

>> past the hospital on it's Northeast side. I know a lot of fishermen<br />

>> would love a route like this. They're just traveling from points<br />

>> along the mid-coast to Portland, and back. You can also add the<br />

>> <strong>com</strong>muters from the North who are heading to Portland and back. I<br />

>> don't know but that a quick study or survey of <strong>com</strong>muters would be<br />

>> beneficial. You might want to ask if the <strong>com</strong>muters drive separately,<br />

5


carpool, mass transit, or other. Where they start their journey, make<br />

>> connections (such as meeting a car pool) and get off for work. Also<br />

>> the general time frame. Do they ever stop along the way What are<br />

>> your shopping habits before and after work In what general part of<br />

>> which town do you stop to shop or run errands Same goes for filling<br />

>> up the vehicle.<br />

>> Some means need to be made available if the options to these questions<br />

>> don't fit a person's situation. Create an "other" option and a short<br />

>> space for written information.<br />

>><br />

>> Another survey could be taken among all businesses in the<br />

>> mid-coast region, large and small. They could identify the areas they<br />

>> service and the most traveled routes their patrons take (note the side<br />

>> streets, as well as the main arteries they follow.) Time-frames would<br />

>> also be useful.<br />

>><br />

>> The idea is to create a time-lapse view that goes<br />

>> along with a surveyed-view of traffic patterns and bottle-necks. If<br />

>> there is a bottleneck and traffic <strong>com</strong>es to a stop, what is it that<br />

>> clears the bottleneck.<br />

>><br />

>> This survey could be quickly put together, posted on the<br />

>> internet and advertized to the general population. No names need be given,<br />

>> so more people should be willing to<br />

>> take the survey. The results could be <strong>com</strong>piled automatically. Looking<br />

>> at a map gives a good perspective of a situation, but adding the human<br />

>> elements/patterns helps the engineers in their planning process.<br />

>><br />

>> (D.) A new on/off ramp on Rt 1, one that is closer to<br />

>> Brunswick, could also be developed, but I'd build it far enough East<br />

>> as to bypass the airstrip. Otherwise the new road would have to be<br />

>> looped all the way around the airstrip. As for a railroad spur, there<br />

>> was one (and could be re-engineered to make it functional again) just West<br />

>> of the existing main gate into the BNAS property. Older maps will<br />

>> confirm the existence of this old railroad spur. If enough r/r<br />

>> traffic <strong>com</strong>es to pass, then look into an overpass so the r/r spur<br />

>> doesn't interfere with Old Bath Rd traffic.<br />

>><br />

>> (E.) Actually, if the railroad was hauling strictly freight<br />

>> to and from the North, a railroad spur could be built along the new<br />

>> I-295 bypass road at mile 24, that feeds off the existing railroad line from<br />

>> Freeport, before it reaches Brunswick (proper,) and let it run into<br />

>> the BNAS property, then connect to the railroad line on the Old Bath<br />

>> Road again. I would not, however, ever delete the railroad line that<br />

>> runs through Brunswick. Heck, why not have a new spur as I just<br />

>> explained, and refurbish the older spur as I described in Item D, above.<br />

>><br />

>> (F.) I fully agree with the idea of using the Rt 201<br />

>> overpass to create a new on/off ramp to I-295 (the Southbound on-ramp<br />

>> is already built,) and shortly after build a new road from Rt 201 to<br />

>> Rt 196. I would suggest improving the Meadow and Ward roads, maybe<br />

>> even running the new portion all the way into Lisbon Falls, and then<br />

>> let the new road connect to Rt 196 there, maybe at the RT 9 intersection.<br />

>><br />

>> (G.) To entice businesses to move onto the BNAS property, how<br />

>> about taking a novel approach. Since this property is being given<br />

6


FREE to the region, how about doing the region's veterans a BIG<br />

>> favor. First, a little background. If a person were to visit each<br />

>> neighboring town, they would find a different mix of buildings for<br />

>> military and other fraternal organizations. One town may have a VFW<br />

>> hall, another might have an American Legion hall. Others might be<br />

>> fortunate to have each and sometimes more than one. The point is,<br />

>> none of the towns within this affected region has the same mix of<br />

>> meeting halls for veterans. In fact, some groups have to rent space<br />

>> from another organization.<br />

>><br />

>> Why not GIVE a piece of property (possibly with an existing building)<br />

>> to the region's veterans, to allow them to <strong>com</strong>e together to use and maintain<br />

>> this facility for all of their uses. The Disabled American Vets (DAV,)<br />

>> American Veterans (AMVETS,) VFW and Legion (etc.) could all form a<br />

>> <strong>com</strong>mittee to determine how the facility will be run (maybe a different group<br />

>> get to use the facility on a given night each month, etc.) It gives all regional<br />

>> members a place to meet with their prospective groups, if their groups don't<br />

>> already have a meeting hall. This facility could also be used by<br />

>> training guardsmen and reserves if necessary.<br />

>><br />

>> I would also suggest this meeting hall be placed in close<br />

>> proximity to a new Commissary */AND/* Exchange (Navy Exchange - Post<br />

>> Exchange - whatever.) There will be plenty of training guardsmen and<br />

>> reserves, along with retired military personnel who would use these<br />

>> facilities if located close to each other.<br />

>><br />

>> What is the tradeoff for the region "If you build it, they<br />

>> will <strong>com</strong>e." If these military types described earlier have a reason<br />

>> to <strong>com</strong>e on the BNAS property, they will undoubtedly pass by any new<br />

>> businesses. Any developer is looking for traffic to flow past a new<br />

>> business. These military types, especially the retired military type,<br />

>> have a ready source of in<strong>com</strong>e to shop. What a great way to start<br />

>> drawing potential customers. Word of mouth, and<br />

>> within a month you'll have all sorts of people shopping there. That's<br />

>> the draw factor the will entice other businesses to move.<br />

>> Businesses of all kinds, not just industrial or shopping centers.<br />

>><br />

>> One last request to the engineers. If you improve an existing<br />

>> road or build a new road, (re)engineer the base of the roads to take<br />

>> heavier loads. These roads need to last a long time and they would<br />

>> surely take on a very heavy work-load. These trucks and heavy<br />

>> equipment surely tear up our roads - but I don't blame them. We need<br />

>> these heavier types of vehicles and what they bring to us. The trick is<br />

>> to engineer a road in the beginning to take these heavy loads, even to<br />

>> higher standards than what is currently called for by existing federal<br />

>> weight limit standards. Also, look to the future when you build these<br />

>> new roads. Undoubtedly there will <strong>com</strong>e new development along any new<br />

>> stretch of road. Build enough lanes (the first time) to ac<strong>com</strong>modate<br />

>> turning traffic, etc. (Do it right the first time!)<br />

>><br />

>> In conclusion, I would say that the affected roads, streets,<br />

>> intersections, r/r crossings, highway overpasses already in existance<br />

>> - they all have been used hard and need attention. If new or<br />

>> alternate routes are created, still, go back and make necessary<br />

>> upgrades to the previous routes (Pleasant Street, etc.) One last<br />

>> piece of advice - no matter which plan is adopted for each issue, the<br />

7


decision makers are going to faced with the "not in my back yard"<br />

>> people. I'm including some valuable properties and sensitive issues<br />

>> with what goes on at the BNAS property. These affected people have<br />

>> legitimate arguments, but negotiate with them and make things happen.<br />

>> Once you have one or two property owners <strong>com</strong>e around to your way of<br />

>> thinking, the others will fall in line quickly. If court dates are<br />

>> necessary, push them through with all of the influence you can muster.<br />

>><br />

>> One final thought - if the region could indeed tap the Federal<br />

>> government for enough funds to make these proposals - (LOOK HOW<br />

>> MANY JOBS WOULD BE INVOLVED - AND - HOW MUCH NEW<br />

>> SPACE WOULD BE OPENED UP FOR FUTURE DEVELOPMENT,<br />

>> possibly for a new industrial park! Please expidite your decision making<br />

>> process so you can apply for federal monies before it is all taken!<br />

>><br />

>> Thank you for giving the public a voice in these matters.<br />

>> Again, I'm sorry for the long-windedness but it's hard to describe<br />

>> these things in one or two paragraphs. This Parkinson's makes typing<br />

>> this a very hard and tiring effort - please try to understand and not<br />

>> cut off my suggestions because they are so late, please Good luck<br />

>> and God bless you in your efforts. I pray for all of you.<br />

>><br />

>> Thank you as well, Beth. Please keep up your good work with<br />

>> The Times Record.<br />

>><br />

>> Rex J. Harrison<br />

>> 8 Aspen Lane<br />

>> Bath, ME 04530-2200<br />

>><br />

>> 207-443-3749<br />

>><br />

>> rjharr@gwi.net <br />

From: stibbettspe@sus<strong>com</strong>-maine.net [mailto:stibbettspe@sus<strong>com</strong>-maine.net]<br />

Sent: Thursday, November 05, 2009 1:40 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I am currently on the Brunswick Downtown Master Plan Update Committee. One of the key focus point in our<br />

current work is pedestrian and bicycle safety along Maine Street. The safety of the downtown for pedestrians is<br />

extremely important if we are going to make it a viable, walkable <strong>com</strong>mercial downtown. I would appreciate it if a<br />

member of your study team would visit with our <strong>com</strong>mittee to discuss our concerns and how they might impact the<br />

Base study. Stephen W. Tibbetts, PE<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: cglewis@me.<strong>com</strong><br />

Sent: Thursday, January 14, 2010 10:37 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Hi – the study process document speaks to aviation reuse and non-aviation reuse. Wondering if you can confirm that<br />

at least some portion of NAS is most likely to be converted to civilian aviation as of this point in time Thanks,<br />

Courtland Lewis<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

8


From: emartz@gwi.net [mailto:emartz@gwi.net]<br />

Sent: Saturday, January 16, 2010 10:00 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Reopen Coombs Road from route 24 to route 123 so that Harpswell residents can drive to Brunswick without going<br />

through Cook's Corner. Opening this road was in the original plan for nasb but has not been mentioned since. The<br />

road goes to or through the nasb golf course. Opening it for traffic will be simple and inexpensive act. Please reopen<br />

the road as soon as possible and please include it in your next report. please respond. Thanks. ELSA MARTZ<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

On Jan 25, 2010, at 1:07 PM, dflaherty@flahertyrealty.<strong>com</strong> wrote:<br />

Chris Mann the email link for you on the website isn't functioning. I own property at 113-115 Pleasant and have<br />

been attending the meetings. I support the use of Turner, Paul and other streets as option to reduce congestion. Two<br />

other thoughts for consideration.1.) No left turn onto River Road. Instead with signage direct traffic to turn right<br />

onto Lombard, right onto Turner, right onto Webster thus bringing cars back to the existing light. 2.)Brunswick<br />

Planning spent a lot of time on the new Tim Horton and Dunkin Donuts with much discussion on no left turns. They<br />

prohibited no lefts but what got built allows cars to circumvent the intent. David Flaherty<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: fred.horch@gmail.<strong>com</strong><br />

Sent: Wednesday, February 17, 2010 12:17 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Please add me to your mailing list. Thanks! -Fred Fred Horch<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: hasshen@myfairpoint.net<br />

Sent: Tuesday, March 30, 2010 10:35 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I attended the 3/30/10 meeting and have a couple of <strong>com</strong>ments. If you do consider a traffic circle at the north end of<br />

the Mill St./Maine intersection, has thought been given to the additional amount of traffic that will have to make the<br />

left turn onto Mill from Pleasant I do not know what the traffic counts are that are now using Pleasant & Maine to<br />

get to Topsham but would think it would be quite high. Also I would re<strong>com</strong>mend prohibiting left turns from Mill<br />

onto the "Black Bridge" and left turns onto Mill From the "Black Bridge". I still feel that Mill St. needs to be<br />

widened to 4 lanes in ant event and the intersection be modified to allow two lanes of traffic to turn left onto Mill<br />

from Pleasant. Why do you show the possible rail connection to the nasb right in line with the end on the runways I<br />

like your concept of roundabouts along Pleasant St. How do this work with trailor trucks Your presentation tonight<br />

was excellent. Harold B. Hutchinson Former Town Engineer and Public Works Director of Brunswick. Harold B.<br />

Hutchinson<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

9


From: cwiercinski@sitelinespa.<strong>com</strong><br />

Sent: Tuesday, April 1, 2010 11:40 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Good Morning Marty.... I enjoyed your presentation on Tuesday night and offer the following <strong>com</strong>ments for your<br />

consideration. As a local Civil design consultant over the last 20 years, we have be<strong>com</strong>e particularly familiar with<br />

the traffic conditions on Pleasant Street. We have been involved in many of the newer projects and obtained<br />

approvals at the Planning Board with particular concern on the impact and safety of left hand turns. I see three key<br />

areas to be addressed and recognize, as you pointed out, that these areas and others impact each other and need to be<br />

considered together. The intersection of Stanwood, Pleasant and Mill. The adjacent properties are underutilized and<br />

would be converted to better use in a better economy. This is anticipated. I don't think a round-about would work<br />

there but I may be wrong. I would suggest that Stanwood be widened to 2 lanes outbound to improve the left turn<br />

capacity. Mill Street Southbound should be improved to be free flowing. I would investigate the practicality of<br />

returning Pleasant Street to 2-way eastward to St John's Church. I think this would remove many left turns that now<br />

pass through the NW neighborhood to get to their desired destination. As part of this intersection upgrade, the<br />

concept of the Turner/Paul bypass is obvious. It can be built in stages as property owners support. In addition to<br />

providing access to the area, it will facilitate increased property values and development in a mixed use zone<br />

bounded by the railroad tracks. Maine, Mill and Mason Intersection. I liked the idea of the round-about on the Maine<br />

Street bridge but assume that the property impact will render this idea too expensive. I do believe that the left hand<br />

turns to Maine Street be reinstituted if at all possible. Church Road/Pleasant Street intersection and outer Pleasant<br />

Street... I have no expertise in the capacity of a round-about but support the idea at Church to facilitate the left<br />

turning traffic for local businesses. I also liked your idea of a transition round-about westerly to calm traffic and<br />

reduce highway speeds. I would expect that this would be larger in size and perhaps address the S-curve switchback<br />

to old Route 1/Freeport Road. Good luck in your analysis and I will look forward to your progress. Charles<br />

Wiercinski<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: willvan@sus<strong>com</strong>-maine.net<br />

Sent: Monday, April 26, 2010 5:42 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Attended March 30 Public meeting and have these thoughts at this time: 1) dealing with disfunctional/unsafe<br />

problems locations and ac<strong>com</strong>odating future demand is a huge undertaking in a region characterized by difficult<br />

topography and marginally functional existing infrastructure 2) the plan will work only if all the several strategies<br />

work, since by themselves each stragety will do little to ac<strong>com</strong>plish goals. Accordingly, the success of<br />

implementation will be gauged by the lowest level of success of any single strategy. 3) the idea of limiting/removing<br />

access to Rt. 196/Coastal Connector is fabulous and gives us the opportunity to un-do all the wrongs there in the<br />

number of controlled intersections. 3) Even if all the strategies are implemented successfully, the overall solution<br />

may not work well unless other modes are major players, especially rail and mass transit (bus and rail) as well as<br />

bicycle and pedestrian. 4) Even if all the above are successful, a major new infrastructure project may be necessary<br />

so as to lower vehicles-per-day usage over existing routes. 5) Providing greater mobility over existing routes while<br />

maintaining a pleasant, pedestrian-friendly, quiet ambience will be challenging and will require all the latest design<br />

tricks and tools. I have great concern about having my <strong>com</strong>munity turned into a transportation hub with all the<br />

attendant blight, noise and reduced quality of life. Thank you. Keep up the good work. -Will William Van Twisk<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: Tina <br />

Sent: Wednesday, May 26, 2010 9:11 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

10


Hello Marty,<br />

You can reach me after 5:15pm either Thursday or Friday, or Tuesday, 6/1 after 4:30. You can reach me at 207-729-<br />

5535. I look forward to hearing from you.<br />

If you are not available at those times I was wondering if you could provide me with an arial photo that doesn't cut<br />

off Stanwood St. The one that was published in the Times Record on 5/25, stops just shy of my street. If that is not<br />

possible, a more detailed description of the proposal.<br />

The last time this idea of a side street was proposed there were two scenarios. The first was to run a road parallel the<br />

the railroad tracks that would connect up to Turner St. I'm not exactly sure as I'm still looking for the paper I had<br />

saved. The second scenario, and much more alarming to me, was one that would be either thru my property or my<br />

next door neighbors at 14 Stanwood St. or close by. I would like to know which scenario is being proposed now or if<br />

a newer one has been proposed that I'm unaware of.<br />

Any help you can give me before the June 2nd meeting would be much appreciated.<br />

Thank you!<br />

Edith Baldwin<br />

16 Stanwood St.<br />

Brunswick, ME 04011<br />

207-729-5535<br />

----- Original Message -----<br />

From: Kennedy, Marty<br />

To: bookchick@gwi.net<br />

Cc: carol morris<br />

Sent: Tuesday, May 25, 2010 9:09 PM<br />

Subject: RE: Brunswick Naval Air Station website form submittal<br />

Ms. Baldwin,<br />

If you provide me you phone number and a time when it would be good for me to call, I would be happy to call you<br />

to answer any questions that you might have.<br />

Marty<br />

Martin F. Kennedy, P.E.<br />

Regional Manager- Northern New England<br />

603.644.0888 x2502<br />

www.vhb.<strong>com</strong><br />

From: bookchick@gwi.net [mailto:bookchick@gwi.net]<br />

Sent: Tuesday, May 25, 2010 6:05 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I live on Stanwood St. From the photos that I've seen, I cannot see where the proposed road that you are indicating<br />

would be on Stanwood st. Is it by the railroad tracks or further up the street I live on 16 Stanwood and received<br />

something a few years ago about possibly having the road very close to my house. Please send me what information<br />

you can so that I will be more informed when I attend the meeting on June 2nd. Thank you. Edith Baldwin<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

11


From: mar-e_trebilcock@msad51.org [mailto:mar-e_trebilcock@msad51.org]<br />

Sent: Saturday, May 29, 2010 4:51 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

As a resident of Topsham Crossing on Crabtree Drive, which abuts the coastal connector (rte 196) I am very<br />

concerned with how you will further develop this bypass. This is a residential area, and I believe it is important to<br />

consider this fact as you proceed with plans for traffic flow through the area. Central to my concerns are safety for<br />

my children and noise from the traffic on the road. I think any plan should consider how these concerns will be<br />

addressed for residents of our neighborhood. Mar-E Trebilcock<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: Steve Weems [slweems@gmail.<strong>com</strong>]<br />

Sent: Sunday, May 30, 2010 1:07 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Martin --<br />

Thanks for the courtesy of a personal reply. I kind of figured it was intentional, and I appreciate your <strong>com</strong>ments<br />

about the number of meetings. I'll definitely be there, and hope the challenge of being in two places at once can be<br />

mastered! As a trustee of MRRA, I have a burning interest in both events.<br />

Steve Weems<br />

POLARIS ASSOCIATES<br />

(207) 725-7282 (Brunswick office)<br />

(207) 772-5356, ext 118 (Portland office)<br />

(207) 751-9437 (Cell)<br />

slweems@gmail.<strong>com</strong> (Email)<br />

On Sun, May 30, 2010 at 12:03 PM, Kennedy, Marty wrote:<br />

Mr. Weems,<br />

The meeting was scheduled that way on purpose. The thinking behind it was that because there have been so many<br />

public meetings on different studies in town, it’s just not fair to continually ask the public to give up their valuable<br />

time to attend these types of meetings. Also, because both these studies are related to the redevelopment of the<br />

NASB, having them on the same night would provide the public the opportunity to talk with both study teams and to<br />

feel some level of <strong>com</strong>fort that both study teams are receiving the same <strong>com</strong>munity input.<br />

I hope you can attend and thank you for taking the time to share your thoughts.<br />

Martin F. Kennedy, P.E.<br />

Regional Manager- Northern New England<br />

From: slweems@gmail.<strong>com</strong> [mailto:slweems@gmail.<strong>com</strong>]<br />

Sent: Sunday, May 30, 2010 11:34 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

12


Was the scheduling of the June 2 meeting, to overlap the meeting on the Einvironmental Impact Statement (EIS)<br />

intentional or inadvertent I think it is unfrotunate, and hope you will schedule another informational meeting prior<br />

to the final meeting(s). Steve Weems<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: galenv@sus<strong>com</strong>-maine.net [mailto:galenv@sus<strong>com</strong>-maine.net]<br />

Sent: Thursday, June 03, 2010 2:18 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Thank you Mr. Kennedy for the presentation you put on at the Brunswick J.H. last evening. Most of the proposed<br />

solutions to Brunswick's traffic patterns made a lot of sense to me. My only <strong>com</strong>ment is on the Pleasant St. and Mill<br />

St. suggestions. I agree with the 3 main intersection and service roads on Pleasant St. I suggest installing 4 lanes on<br />

Mill St. Barriers could be placed to isolate the adjoining neighborhoods. I've seen barriers in other states that are<br />

decorated with images or etchings that make them aesthetically pleasing. I am also in favor of the bike paths and<br />

sidewalks but cars are not going away and the business folks along this way, of which I am not, want and need the<br />

traffic. Please make this corridor a priority. Galen Violette, 161 McKeen St., Brunswick Galen Violette<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: johnandlinda@sus<strong>com</strong>-maine.net [mailto:johnandlinda@sus<strong>com</strong>-maine.net]<br />

Sent: Thursday, June 03, 2010 5:10 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

We attended the June 2 meeting and found the study to be both informative and thorough. Despite not having cost<br />

and timeframe data, the alternatives were clearly delineated. Thanks. Our greatest concern is that planning for<br />

Pleasant/Mill Streets seems dependent on those roads being a conduit for ongoing traffic heading north/south inside<br />

Maine and beyond the state. As a result, the plan is way too <strong>com</strong>plex and probably going to be a BIG drain on those<br />

who pay for the changes (ultimately the taxpayers of Brunswick, ME and the feds (in short, us!) After the Topsham<br />

Coastal Connector was built, we had thought nonlocal traffic would be routed that way from 295 to Northern<br />

locations such as Bath or Bar Harbor. And, with your grade separation alternative plan for Route 196 (and maybe<br />

some work on the exit/entrance into Topsham Mall) plus the widening of 196 to 2 lanes in each direction, it seems<br />

even more like the way to move nonlocal traffic. IWe favor having the "Coastal Connector" signage on 295 changed<br />

to indicate Exit 31 ONLY (not also including Brunswick signage as a coastal connector route N/S) we believe there<br />

will be far less traffic. Therefore, we support far fewer upgrades to Pleasant Street, and keeping Mill Street 2<br />

lanes...perhaps with pedestrian upgrades to help pedestrians cross Mill to access the river. In order to ac<strong>com</strong>modate<br />

concerns of merchants on Pleasant, we favor designating Exit 28 as "Business Route - Brunswick" to encourage<br />

travelers who aren't racing to destinations N/S to swing onto Pleasant and then on to downtown. Currently, we<br />

suspect very few Pleasant Street drivers from out of the area actually go into town! Damariscotta has used this<br />

"business route" designation to great effect! We regularly decide whether to stop in town or zoom on past. With<br />

regard to loosing shoppers, even as the Brunswick roads are now configured, we can't imagine many travelers on<br />

5/7/9 hour trips to Maine are going to stop to poke around shops en route just because they are barreling through<br />

town. We'd also favor adding a turn lane in the middle of Pleasant Street to improve access to businesses and,<br />

simultaneously, stop annoying everyone who gets stuck as a northbound car tries to turn into Dunkin or Mulberry<br />

Cottage. We do not favor rotaries as a means to control traffic, and would not like to see 5 or so signals/rotaries used<br />

in such a short stretch of road. Get rid of some of the through traffic, and we don't think these "improvements" are<br />

really necessary. <strong>Final</strong>ly, we would like to see greater alternative transportation such as biking around town, but feel<br />

there are already many Brunswick routes that work (McKeen, Pleasant Hill, etc.) without trying to convert Route 1<br />

for that purpose. We look forward to watching the progress as NASB/area property evolves. Thanks again for<br />

keeping us current on your plans. John and Linda O'Connell<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

13


From: Chris Baker, Harpswell [chrisbak5u@myfairpoint.net]<br />

Sent: Friday, June 04, 2010 1:58 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Please ignore my first email. I would like to see Exit 28 on I-295 reconfigured and a 4-lane limited access solution<br />

proposed from there to Mill St. Such a solution would make the base property much more attractive to employers<br />

because it would be readily available to <strong>com</strong>muters from I-295. Also over the decades, economic growth in both<br />

Bath and Woolich has be<strong>com</strong>e stunted because of the lack of a limited access road through Brunswick to I-295.<br />

However wasting more funds on Pleasant St., as your firm has proposed, makes no sense because the parochial<br />

Brunswick Town Council keeps permitting more businesses there. Also the Times Record reported that an owner of<br />

a business along Route 1 (Pleasant St.) <strong>com</strong>plained about a potential “loss of business” from your firm’s proposals<br />

for Pleasant St. In fact, DOT has a long history with such <strong>com</strong>plaints and they shouldn’t preclude any of your firm’s<br />

proposals.<br />

Thank you,<br />

Chris Baker, Harpswell<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: brunswickautorecycling@yahoo.<strong>com</strong> [mailto:brunswickautorecycling@yahoo.<strong>com</strong>]<br />

Sent: Friday, June 04, 2010 3:18 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

In my opinion putting an off ramp thur 2 businesses that brings in business is a bad idea and should not be done.<br />

Here @ brunswick auto recycling we do alot of good for the city.The ramp needs to be put further down to make it<br />

easyer to get to the hospital and fire department.So they don't have to go through cooks corner. We also save<br />

brunswick money because we allow the fire department to do there training here at no cost.We also help the low<br />

in<strong>com</strong>e familys that can't afford new parts. We also accept use oil, batterys, and tires. There has been a junkyard<br />

here since the 50's it would be devastating to the <strong>com</strong>munity and to our family that has fought to get this junkyard.<br />

My future and my childrens relly on this business. My husband has been here since 1995 when he was 18 years old<br />

this is the only thing he knows. So I would suggest other options that would be beneficial to city. Please consider<br />

other opions. Thank you Paula Letourneau PAULA LETOURNEAU<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: sweber@bowdoin.edu [mailto:sweber@bowdoin.edu]<br />

Sent: Saturday, June 05, 2010 11:26 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I like the pleasant street improvements since I don't foresee this area being a pedestrian, bicycle destination anyway.<br />

But overall, I thought your presentation was too automobile focused and I question the models as to whether a direct<br />

link from US-1 to the base will be even necessary. I also re<strong>com</strong>mend removing the State Highway 24 designation on<br />

Bath Rd. and Maine St. and instead rerouting route 24 along the bypass from where it <strong>com</strong>es in on Middlesex Rd.<br />

and along US. 1 from where the bypass <strong>com</strong>es in to the Cooks Corner exit. This would ease the unnecessary<br />

congestion on Bath Rd. and down Maine St., which shoud instead be narrower and allow safer and more convenient<br />

access to pedestrians and cyclists. Scott Weber<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

-----Original Message-----<br />

From: Scott F. Weber [mailto:sweber@bowdoin.edu]<br />

14


Sent: Sunday, June 06, 2010 4:14 PM<br />

To: Kennedy, Marty<br />

Cc: cmorris@morris<strong>com</strong>m.net; Mann, Chris A<br />

Subject: RE: Brunswick Naval Air Station website form submittal<br />

Hi Mr. Kennedy,<br />

I thank you very much for the informative presentation Wednesday evening. I personally believe adding direct<br />

connectivity to the base from Route-1 and visa versa would be a plus given the congestion (and I find the trumpet<br />

interchange most appealing), but I think more <strong>com</strong>munity input is needed before a decision be made, plus cost<br />

projections.<br />

Best Regards,<br />

Scott Weber<br />

________________________________________<br />

From: Kennedy, Marty [mkennedy@<strong>VHB</strong>.<strong>com</strong>]<br />

Sent: Sunday, June 06, 2010 7:15 AM<br />

To: Scott F. Weber<br />

Cc: cmorris@morris<strong>com</strong>m.net; Mann, Chris A<br />

Subject: RE: Brunswick Naval Air Station website form submittal<br />

Mr. Weber,<br />

Thank you for attending last week’s meeting and for your thoughtful <strong>com</strong>ments. Please clarify one point for me. In a<br />

previous <strong>com</strong>ment, you stated that you liked the trumpet interchange connecting Route 1 to the Base. However, in<br />

this <strong>com</strong>ment, you question whether the direct connection to the Route 1 is even necessary. Am I misinterpreting<br />

your statements<br />

Thanks again,<br />

Marty<br />

Martin F. Kennedy, P.E.<br />

Regional Manager- Northern New England<br />

603.644.0888 x2502<br />

www.vhb.<strong>com</strong><br />

From: sweber@bowdoin.edu [mailto:sweber@bowdoin.edu]<br />

Sent: Saturday, June 05, 2010 11:26 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I like the pleasant street improvements since I don't foresee this area being a pedestrian, bicycle destination anyway.<br />

But overall, I thought your presentation was too automobile focused and I question the models as to whether a direct<br />

link from US-1 to the base will be even necessary. I also re<strong>com</strong>mend removing the State Highway 24 designation on<br />

Bath Rd. and Maine St. and instead rerouting route 24 along the bypass from where it <strong>com</strong>es in on Middlesex Rd.<br />

and along US. 1 from where the bypass <strong>com</strong>es in to the Cooks Corner exit. This would ease the unnecessary<br />

congestion on Bath Rd. and down Maine St., which shoud instead be narrower and allow safer and more convenient<br />

access to pedestrians and cyclists. Scott Weber<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: pbgalvin@yahoo.<strong>com</strong> [mailto:pbgalvin@yahoo.<strong>com</strong>]<br />

Sent: Sunday, June 06, 2010 6:09 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

15


I thought that the Topsham Coastal Connector, formerly known as the Bath/Brunswick By-Pass, was supposed to<br />

alleviate the traffic situation on Rte 1 (Pleasant and Mill Streets) in Brunswick. What happened DOT or the Town<br />

allowed too many curb cuts and the by-pass became a local road! As a temporary measure the signs on 295 have to<br />

be changed to reflect the fact that Rte I through Brunswick is NOT THE ONLY GATEWAY TO THE COAST OR<br />

RTE 1. Depending upon where one is headed Boothbay or Rockand or Bar harbor, etc. other exits from 295 can be<br />

used to head North.( For example through the Topsham exit or the Augusta Exit to name two exits.) Signs to this<br />

effect should be placed before the Brunswick exit. The Brunswick sign should read simply Bath/Brunswick and<br />

Route 1. Nothing about the coast Route. The overhead sign should read Topsham, Rockland and points North via<br />

Coastal Route I. Please review the signage in Brunswick and stop listening to the business on Pleasant street who<br />

scream that they will go out business if any car is diverted from Pleasant Street. Pamela Galvin<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: brunswickautorecycling@yahoo.<strong>com</strong> [mailto:brunswickautorecycling@yahoo.<strong>com</strong>]<br />

Sent: Monday, June 07, 2010 1:02 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I OWN BRUNSWICK AUTO RECYCLING AT 117 BATH RD.BRUNSWICK ME.AND DONT WANT TO SEE<br />

A RAMP THROUGH MY YARD FROM RT1 TO THE BASE. I DONT FEEL THIS WOULD BE FOR THE<br />

PEOPLE OF BRUNSWICK AS MUCH AS IT WOULD BE FOR FEDX.THIS HAS BEEN A SALVAGE YARD<br />

HELPING THE PEOPLE OF BRUNSWICK AND SUROUNDING TOWNS FOR ABOUT AS LONG AS THE<br />

BASE HAS BEEN THERE IF NOT EVEN LONGER.NOW THE BASE IS CLOSING AND FEDX IS COMMING<br />

IN THEY FEEL THE NEED OF A RAMP THROUGH MY SALVAGE YARD.MYSELF AND HUNDREDS OF<br />

OTHER PEOPLE THINK THIS YARD IS MORE HELPFUL TO THE PEOPLE OF BRUNSWICK AND<br />

SUROUNDING TOWNS THAN A RAMP FOR FEDX. WHAT REALY GETS MYSELF AND OTHER PEOPLE<br />

UP SET IS THAT THE RAMP COULD GO DOWN THE ROAD A FEW HUNDRED YARDS AND NOT<br />

AFFECT ANYONE.DISCOUNT TIRE AND AUTOMETRICS WHO ARE OUT FRONT OF US WOULD ALSO<br />

BE AFECTED BY THIS RAMP FOR FEDX UNLESS IT WAS DOWN THE ROAD CLOSER TO<br />

MERRYMEETING PLAZA OR IT COULD GO TO THE OTHER SIDE OF COOKS CORNER WHERE IT<br />

WOULD BE BETTER FOR THE HOSPITAL AND THE FIRE DEPARTMENT SO THEY WOULD NOT HAVE<br />

TO GO THROUGH COOKS CORNER WITH EMERGENCY VEHICALS. WE ALL KNOW TIME CAN SAVE<br />

A LIFE. WE DO ALOT FOR THE COMUNITY FROM TAKING USED OILS TO BATTERIES TO TIRES TO<br />

SCRAP CARS/TRUCKS AND OTHER SCRAP OFF THE STREETS AND DISPOSING OF PROPERLY. WE<br />

ALSO DONATE ALOT TO THE TOWN FROM CASH FOR FIRE/RESCUE TO POLICE TO STATE POLICE.<br />

WE ALSO DONATE CARS TO FIRE/RESCUE TO TRAIN WITH JAWS OF LIFE TO PUTTING OUT FIRES<br />

RIGHT HERE ON THE PROPERTY FOR FREE AS MANY AS THEY HAVE ASKED FOR.WE ALSO<br />

DONATE TO VOC.SCHOOLS.WE ALSO DONATE CRASHED CARS TO GO ON DISPLAY TO HELP MAKE<br />

PEOPLE UNDERSTAND NOT TO DRINK AND DRIVE.WE DO ALOT FOR THE COMUNITY HERE AND<br />

WE WANT TO STAY! THE PEOPLE I TALK TO WANT US HERE AS WELL! I THINK THE RAMP<br />

SHOULD GO SOME PLACE ELS! SHAWN LETOURNEAU<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: DeWitt Kimball [mailto:dewitt.kimball@gmail.<strong>com</strong>]<br />

Sent: Tuesday, June 08, 2010 11:04 AM<br />

To: sbenjamin@mainecollaborativeplanning.<strong>com</strong> forwarded to Marty Kennedy<br />

Subject: RE: Brunswick Naval Air Station website form submittal<br />

Hello Mr. Benjamin,<br />

I want to thank you for the June 2nd road change presentation. It really helped to see the plans and listen to the<br />

audience’s input. There is a lot at stake with the potential modifications. With such a significant project,<br />

16


neighborhoods will be impacted, green space lost, and there is the potential increase in traffic associated problems,<br />

including smog and noise.<br />

For me to form an opinion based on information, rather than my own knee jerk bias, I need more data. You<br />

mentioned that 26,000 cars per day go down Pleasant Street during the peak travel times of the year. It would be<br />

very helpful if you could supply information on how many of those cars continue to Maine Street and how many bypass<br />

Brunswick and head north via Mill Street. I was told by a DOT employee that 24,000 cars go down Mill Street<br />

each day during the peak travel times. If that is the case, it seems that the vast majority of the traffic on Mill Street<br />

may by-pass traffic which could be handled better with the improved Coastal Connector in Topsham.<br />

More specific information will help me see if the proposed Mill Street upgrades are just providing a better conduit<br />

for people to go north, or for people to visit Brunswick.<br />

Best Wishes,<br />

DeWitt Kimball<br />

Complete Home Evaluation Services LLC<br />

www.CompleteHomeEvaluations.<strong>com</strong><br />

Email: dewitt@CompleteHomeEvaluations.<strong>com</strong><br />

Office: 207.729.8400<br />

Cell: 207.831.5634<br />

From: Pamela Galvin [mailto:pbgalvin@yahoo.<strong>com</strong>]<br />

Sent: Tuesday, June 08, 2010 8:18 PM<br />

To: Kennedy, Marty<br />

Subject: RE: Brunswick Naval Air Station website form submittal<br />

Marty,<br />

I just drove up from Portland and paid careful attention to the signs. There are five signs that have the Route 1<br />

logo and Coastal Route next to it.<br />

On all but one of the four signs which read Brunswick Bath are the words Coastal Route not listed.<br />

No wonder Pleasant Street and Mill Streets are clogged with traffic particularly in the summer months. Tourists<br />

must think this is the only way to drive up the coast.<br />

The Freeport exit sign reads Freeport and the Route 1 logo. Why doesn't this sign state Coastal Route<br />

Please just stop thinking about changing the signage and DO IT, if only on a temporary basis to see if something<br />

this simple could relieve the congestion on Brunswick's Route 1.<br />

Thank you for listening,<br />

Pam Galvin<br />

From: lolly@theamconveyors.<strong>com</strong> [mailto:lolly@theamconveyors.<strong>com</strong>]<br />

Sent: Thursday, June 10, 2010 4:45 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I read the article following June 2nd meeting and want to emphasis as did others that you are not opening up the idea<br />

of "mobility" to non-car options. When you have such an opportunity, be forward thinking. Don't keep cutting off<br />

alternative modes of transport (walking, biking etc), build them into the model. You will be famously applauded<br />

years down the road and the whole <strong>com</strong>munity will be enhanced- their spirits, their health and their property values.<br />

Make Brunswick more "livable" , more fun. Have you seen how many people are trying to make a switch from oil<br />

dependency transport or to healthy habits. Not talking side walks and bike lanes but an independent path that links<br />

the town and is widely accessible from home and work. Don't wait until someone gets hit by a car- put it in the plan<br />

now. need help- think Swedish model watching with great interest and hope and in memory of Willie Neal LLG<br />

lolly garrec<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

17


From: charris@tidewater.net<br />

Sent: Friday, June 11, 2010 8:28 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Cc: Margo Knight; Benet Pols; Nancy Randolph; Vicky Marr; Suzan Wilson<br />

Subject: Brunswick Naval Air Station website form submittal<br />

A million dollars for the study as presented in the 6/4 Forecaster There must be more than what is presented there,<br />

or on the website. Roundabouts on Pleasant Street leave me skeptical, but open given more information. Four lanes<br />

on Mill Street is a no brainer. It would require the acquisition of just a couple of properties. There was a <strong>com</strong>ment<br />

made that this improvement would "...sell our souls...". The improvement would be relatively simple and<br />

inexpensive <strong>com</strong>pared to cloverleaf and trumpet interchanges. My soul will be untainted. What is the big problem<br />

with 201/196 We are never going to build our way out of minor delays. Keeping in mind huge Federal and State<br />

budget shortfalls, we need to put up with minor delays at peak hours. A direct connection to NASB from Route 1 is<br />

in order, but given the potential cost, and "soul selling" property takes that will be required, it may be better to just<br />

realign the current main entrance. Eliminating the current entrance. and providing a major signal controlled<br />

intersection with attendant turn lanes across from Merrymeeting Plaza (Shaw's) would provide simplified access,<br />

and separate the distance between signals. Perhaps a more <strong>com</strong>plex scheme could take some <strong>com</strong>mercial properties<br />

along the railroad tracks in order to add additional lane capacity from the Cooks Corner intersection.<br />

Jonathan Harris<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: gorbs@sus<strong>com</strong>-maine.net<br />

Sent: Tuesday, June 22, 2010 4:41 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Cc: Margo Knight; Benet Pols; Nancy Randolph; Vicky Marr; Suzan Wilson<br />

Subject: Brunswick Naval Air Station website form submittal<br />

just back from vacation and wham with plan for our house on westminster ave. it seems all of the plans will affect us<br />

at 2 westminster.if plan goes thru how wide must the street be would like to be kept informed of any developments.<br />

ken gorby (plan 2B0<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: alison@harbart.net [mailto:alison@harbart.net]<br />

Sent: Monday, June 28, 2010 8:45 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

RE: Transportation Feasibility Study Related to the Redevelopment of NASB Thank your for the opportunity to<br />

<strong>com</strong>ment on this study. I am excited about the potential for the redevelopment of NASB to generate much-needed<br />

jobs and be<strong>com</strong>e a vital force in Mid Coast Maine economic recovery. At the same time, it is important to retain the<br />

unique historic character of Brunswick and avoid the suburban sprawl dominated by automobiles that I have<br />

witnessed in Central New Jersey and Fairfield County, Connecticut. It is wrong-headed to inflict automobile<br />

speedways on the citizens of Brunswick and Topsham 24/7 to ac<strong>com</strong>modate traffic only two hours a day, five days a<br />

week. If keeping streets safe for pedestrians and cyclists adds a bit of time to daily vehicular <strong>com</strong>mutes, so be it.<br />

Some drivers to Bath Iron Works or Cooks Corner from points South of Brunswick may prefer to add a few miles<br />

and speed along on the 196 Coastal Connector and avoid the slowdowns through Brunswick, which would be just<br />

fine. As a resident of the NorthWest Brunswick neighborhood who takes advantage of living within walking and<br />

bicycling distance of Brunswicks downtown, my interest is primarily in Strategies 2A, 2B and 2C. 1. It is critical<br />

that mobility plans safely ac<strong>com</strong>modate bicycles and pedestrians on all roads other than major highways. 1.1. The<br />

intersection of Route 201 and Route 196 is near many facilities that draw pedestrians and bicyclists, or would, if<br />

18


there were safe access. They include: Mt. Ararat Middle School, Mt. Ararat High School, the Merrymeeting Adult<br />

School, the Orion Arts Center (at the Middle School), the Topsham Municipal Complex, the Post Office, the<br />

Topsham Fair Mall, as well as businesses that will emerge at the redeveloped NASB Topsham Annex. 1.2. Outer<br />

Pleasant Street from I-295 to Mill Street serves not only many local businesses that generate a lot of left-turn traffic<br />

from the roadway and from parking lots onto the roadway, but also neighborhoods of short side and parallel streets<br />

that now must use Pleasant Street. Some businesses, such as the Salvation Army, serve a population that may not<br />

even own cars. 1.3. Mill Street provides or impedes access to the Androscoggin River and popular pedestrian<br />

destinations such as the canoe portage park, the Swinging Bridge, and the Androscoggin Riverwalk. 2. Through<br />

traffic between points south on I-295 and Cooks Corner, Bath and Coastal Route One should be directed to use the<br />

Route 196 Coastal Connector. Local traffic between those areas should be encouraged to use the Coastal Connector<br />

even though it is longer. They should be discouraged from using Pleasant Street and Mill Street by making them<br />

slower streets, appropriate to urban <strong>com</strong>munities with pedestrians and cyclists. 2.1. South of Exit 28 on I-295 install<br />

signs that 2.1.1. Direct traffic for Cooks Corner, NASB (a/k/a Brunswick Landing), Harpswell via Route 24, Bath<br />

and Coastal Route One to Exit 31 and the Coastal Connector 2.1.2. Stress that Exit 28 is for Downtown Brunswick,<br />

Bowdoin & Harpswell via Route 123, only 2.2. On Route One South in Cooks Corner, install signs to direct traffic<br />

to I-295 South via the Route 196 Coastal Connector. 2.3. On Outer Pleasant Street, slow traffic and provide safe<br />

routes for pedestrians and cyclists. 2.3.1. Given my past life in New Jersey where they are eliminating traffic circles,<br />

I was leery of roundabouts but am now persuaded that they might safely and effectively slow traffic if installed on<br />

Pleasant Street at the intersections with the I-295 off ramp, River Road, and Mill/Stanwood Street. 2.3.2. Reduce the<br />

width of outer Pleasant Street to three lanes with a center left-turn lane. 2.3.3. Widen and improve sidewalks (trees,<br />

attractive lighting, etc.) to safely ac<strong>com</strong>modate strollers and wheelchairs. 2.3.4. Create clearly marked bicycle lanes.<br />

2.3.5. At traffic lights, clearly mark pedestrian crosswalks and provide safety medians in the middle of the street.<br />

2.3.6. Reduce the number of curb cuts along Pleasant Street by 2.3.6.1. Working with the Town of Brunswick to<br />

encourage existing businesses to share parking lots and curb cuts, and insisting the new businesses do the same.<br />

2.3.6.2. Creating a network of parallel streets to move local traffic away from Pleasant Street. 2.4. On Mill Street,<br />

slow traffic and provide safe routes for pedestrians and cyclists. 2.4.1. Reduce the width of Mill Street to three lanes<br />

with a center left-turn lane. 2.4.2. Implement the Androscoggin Riverwalk plan to create a path for pedestrians and<br />

cyclists from Bow Street to the Swinging Bridge that is close to the river and separated from traffic by a guardrail<br />

2.4.3. Widen and improve (trees, attractive lighting, etc.) the sidewalk of the South side of Mill Street (across Mill<br />

Street from the River) to ac<strong>com</strong>modate strollers and wheelchairs 2.4.4. Create clearly marked bicycle lanes from the<br />

Swinging Bridge to Pleasant Street and from Pleasant Street to Maine Street. 2.4.5. Ensure safe pedestrian crossings<br />

at the Mill Street Canoe Portage, Cumberland Street to the business across Mill Street, and from Cushing Street to<br />

the Swinging Bridge. Possibilities include: 2.4.5.1. Traffic lights controlled by pedestrians 2.4.5.2. Flashing<br />

crosswalks, with warning signs for drivers when a pedestrian activates the flashers 2.4.5.3. Speed bumps on either<br />

side of crosswalks 2.5. On Route 196 in Topsham, reduce the number of traffic signals between the Coastal<br />

Connector and I-295. They deter drivers from using the Coastal Connector to bypass Pleasant and Mill Street. 3. My<br />

preference at the intersection of Route 196 and Route 201 is to as much as possible retain the character of Route<br />

201 as Topshams Main Street, leading from the river and the lower village to the Post Office and the Municipal<br />

Complex and then on to the Mt. Ararat school campus and the redeveloped NASB Topsham Annex. 3.1. Depress<br />

Route 196 below Route 201. 3.2. Maintain sidewalks and bicycle lanes on both sides of Route 201. 3.3. Ensure safe<br />

pedestrian crossings at side streets and strategic locations such as the Post Office, Municipal Complex, and Mt.<br />

Ararat schools. 4. On areas outside the scope of this study, my suggestions include: 4.1. Create direct access from<br />

Route One South to Maine Street in Brunswick in both directions: over the Frank J. Wood Bridge to Topsham (as<br />

now) and to downtown Brunswick and Fort Andross. Perhaps a roundabout could achieve that. 4.2. Until that is<br />

achieved, install clear signage along the length of Cushing Street to direct traffic going from Route One South to<br />

Maine Street to travel all the way to Pleasant Street, rather than turning on the residential side streets. This will have<br />

the dual benefit of protecting NorthWest Brunswick neighborhood from through traffic and exposing Pleasant Street<br />

businesses to passing vehicles. 4.3. Explore making Pleasant Street from Maine Street to Mill/Stanwood Street twoway<br />

with three lanes, including one left-turn lane. Add clearly designated bicycle lanes. The current traffic pattern of<br />

one-way streets and streets that abruptly change from two-way to one-way is confusing to visitors. Reducing the<br />

travel lanes will make Pleasant Street safer for pedestrian crossings. 4.4. Revisit adding a River Road exit to I-295<br />

between Exit 28 and Exit 31 to draw traffic off of Pleasant Street. Again, thank you for you opportunity to <strong>com</strong>ment<br />

on the study. It is important that planning for mobility considers pedestrian and cyclist mobility as well as vehicular<br />

mobility. Even more importantly, we must not sacrifice the character of our historic <strong>com</strong>munity just to<br />

ac<strong>com</strong>modate traffic for two hours, five days a week, especially when we have a perfectly serviceable Route 196<br />

Coastal Connector for through traffic both <strong>com</strong>muters and visitors. Alison Harris 38 Cumberland Street<br />

19


Brunswick, ME 04011 207-729-0787 Alison Harris<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: brunswickautorecycling@yahoo.<strong>com</strong> [mailto:brunswickautorecycling@yahoo.<strong>com</strong>]<br />

Sent: Tuesday, June 29, 2010 1:46 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty; <strong>VHB</strong>_Webmaster<br />

Subject: Brunswick Naval Air Station website form submittal<br />

WHEN WILL THE TOWN MEETING TAKE PLACE IN JULY PAULA LETOURNEAU<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: midcoasteve@gmail.<strong>com</strong> [mailto:midcoasteve@gmail.<strong>com</strong>]<br />

Sent: Sunday, August 01, 2010 8:51 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

RE: Strategy 2A: Coastal connector Options 2A and 3 are are the only options that would increase thetraffic flow<br />

rate because either would eliminate the signalized intersection at Rt 201. Option 4, widening Rt 196, will reduce buy<br />

half the length of the line of traffic that has to stop at the signalized Highlands/Rt196 intersection. To increase flow<br />

efficiency, the sigal a Highlans/Rt 196 must be elimnated. Consider building a single lane signalized bridge over<br />

Rt196 to connect the 2 properties. It could easily handle the extremely low trafic volume that requires cross lane<br />

access to Rt196. Lets' attempt make the "Connector" a true connector. Stephen Goller<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: flanagan1@sus<strong>com</strong>-maine.net [mailto:flanagan1@sus<strong>com</strong>-maine.net]<br />

Sent: Sunday, August 01, 2010 8:55 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Whatever you decide, do not add roundabouts to the plans. They are very dangerous. marilyn flanagan<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: flanagan1@sus<strong>com</strong>-maine.net [mailto:flanagan1@sus<strong>com</strong>-maine.net]<br />

Sent: Monday, August 02, 2010 12:49 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Dear Sir or Madam, One <strong>com</strong>ment I do have is that in my opinion the plans for "roundabouts" are badly mistaken.<br />

These constructions are confusing, dangerous, counter-productive, and wasteful in every sense of the word. James<br />

M. Flanagan<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: jimbyrnept@sus<strong>com</strong>-maine.net<br />

Sent: Monday, August 02, 2010 9:28 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

20


To Whom it may Concern: I would offer the following feedback and input to the redevelopment process of the<br />

NASB. -concerning the coastal connector in Topsham I am in favor of options two (the rotary) and option 4<br />

widening the connector into 4 lanes. I feel that option 4 would allow the <strong>com</strong>munity the option to continue to work<br />

on the bike and pedestrian path, hopefully someday progressing to a pedestrian bridge. One favorable point on these<br />

options is that they seem to allow bike and pedestrian access to the schools and areas North of 196. The rotary<br />

would assist traffic movement and efficiency if done right. I am strongly in favor of rotaries as they improve traffic<br />

flow, save gas and actually decrease accident frequency and serious injuries. (an article in a recent economist<br />

magazine discussed worldwide <strong>com</strong>ebacks of rotaries) Not too many drivers are T-boned at a rotary. I feel that<br />

options 3 and 3A although intriguing would slice through some significant unfragmented forests as well as greatly<br />

effect the character of the somewhat small town feel of Topsham. I can live with the rotary at the 196 and 201<br />

interchange because that volume of traffic needs to be moved through but the alternate rotaries, even one lane, don't<br />

seem to fit the character of the town in their location and spirit. The pedestrian bridge option seems expensive and<br />

may not produce the result of bike and pedestrian friendly areas that the <strong>com</strong>munity seeks but I say this with not a<br />

true understanding of the proposal so this is a qualified non re<strong>com</strong>mendation. Regarding the Brunswick Maine Street<br />

and Pleasant street intersection. I agree that this area is extremely problematic and very inefficient. The best solution<br />

I believe is a rotary at this intersection to improve traffic flow and allow motorists some turns that they cannot do<br />

now as noted in the Feasibility study form. To add that I am forced to use residential roads frequently and Cushing<br />

Street is probably the main cut through that I use. Thank you for your continued efforts and hard work Sincerely,<br />

Jim Byrne 11 Jeanne Drive Topsham, ME 04086 207 729-3901 Jim Byrne<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: fmoore@sc.rr.<strong>com</strong> [mailto:fmoore@sc.rr.<strong>com</strong>]<br />

Sent: Tuesday, August 10, 2010 7:00 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

August 10, 2010 As plans are established for the redevelopment of the Naval Air Station Brunswick (NASB) the<br />

Midcoast Regional Redevelopment Authoritys (MRDA) number one objective is to increase access to BNAS from<br />

Route 1. Given the numerous entrances known as gates when BNAS was an actively operating facility, isnt<br />

there enough access already Why must more land and money be spent for yet another entrance Since 1950 various<br />

entrances have been used daily and or on an as-needed basis, to allow the thousands of military and civilian workers<br />

access to their place of work. When the flying Blue Angels bring their spectacular air shows to our area, crowds of<br />

over 100,000 people are able to enjoy the talents of these special pilots, and our roadways always have been able to<br />

handle the increased traffic adequately. Will the increase in traffic headed for NASB be any greater than those<br />

numbers Must all the people enter from one primary location at a cost of $30 to $40 million dollars for this single<br />

option If there is to be an estimated 30 to 40 million dollars allocated in Strategy 1: Increased Base Access, will a<br />

variety of environmental, geological, and historical studies be <strong>com</strong>pleted and cautiously scrutinized Assuming the<br />

answer to this question is Yes then please consider the following: Option 1: Trumpet loop from Route 1 directly<br />

onto NASB requires the most land to ac<strong>com</strong>plish the same goal as Option 2 (Flyover lanes) and Option 3<br />

(Signalized Frontage Road). When a study of the history of the land is done for Option 1, it will be learned that the<br />

property has tremendous historical importance about which much has been researched and written. The proposed<br />

loop entirely en<strong>com</strong>passes what remains of the former Merrymeeting Park. Local historian Mr. Chris Gutcher has<br />

done valuable research and writing on the history of the park. It should be taken into consideration when information<br />

about this land is studied. Unfortunately nearly sixteen acres of the park was destroyed when Route 1 was<br />

constructed in the early 1960s. In addition to Merrymeeting Park, Mr. Gutcher has recently <strong>com</strong>pleted research on<br />

the Humphreys shipyard and steam mill that were located within the scope of the proposed Trumpet loop. Further,<br />

the Trumpet loop will destroy what has been described by Dr. Bruce Bourque, State of Maine State Museum Chief<br />

Archeologist and Curator of Ethnography, as one of the most unique Native American cultural sites in North<br />

America. The Red Paint Indians lived on this land nearly 8,000 years ago, and there is much more to be learned<br />

about them and other Native American cultures that made this specific piece of land their home after the demise of<br />

the Red Paint. Should the Trumpet loop be constructed all of the above along with the deer, turkeys, fox, beaver,<br />

eagles and other wildlife will be gone forever. Two special residences on the property will be destroyed as well. I<br />

and members of my family have these questions for the <strong>com</strong>mittee: 1. Why is the Trumpet loop considered as<br />

Option 1 (It can’t be that it has the least amount of impact on the land. As is seen in the <strong>com</strong>mittee’s pictorial<br />

21


proposals it requires the most land.) 2. If each of the three options costs from $30 to $40 million, doesnt it make<br />

sense to choose the option with the least historical and environmental impact 3. Which option will require using the<br />

most taxable land 4.Which option is the greenest meaning will have the smallest impact on the environment and<br />

habitat of flora and fauna 5a. Shouldn’t the option that is chosen use land that already is not part of the tax base in<br />

Brunswick instead of removing more property from the tax rolls (For example, back in the 1940s the Federal<br />

government wanted the road frontage land that runs from the cemetery across from VIP on the Old Bath Road all the<br />

way to the area across from Foshay’s Tire. My family owned that land and the government took it from them.) 5b.<br />

Can you imagine the taxes the Town of Brunswick could collect if that property, along with that taken in the last 20<br />

years (along Jordan Avenue and the Old Bath Road to expand the landing zone for the air base) were still<br />

<strong>com</strong>mercially available (In 1959 sixteen acres were taken to makeup part of the current Route 1. There are now<br />

only thirty-one acres left from a purchase of 140 acres my grandfather made in 1929.) 6. Will any consideration be<br />

given to what our family has endured in the past when it <strong>com</strong>es to losing more land Some final questions I would<br />

like answered: 7. How will the various strategies (1, 2A, 2B, 2C, and 3) be implemented over time Is there any<br />

guarantee that each of these will be ac<strong>com</strong>plished, or is it probable that Strategy 1 is the top priority and the others<br />

may not <strong>com</strong>e to fruition in this century Because I live and work in South Carolina and summer on the<br />

Merrymeeting Park property during June and July (and plan to retire there in 2012), I will not be able to attend the<br />

August 12 meeting. On behalf of the elder members of my family, I respectfully request that the questions and<br />

information included herein be seriously considered and responded to so we will know we have been included in the<br />

process being followed by the MDOT and the MRDA. Thank you. Sincerely, Frank Moore, Grandson of Original<br />

Merrymeeting Park Property Owner (Earl L. Ormsby, Sr.) for Gilbert Ormsby, current Merrymeeting Park Property<br />

Owner Florence Ormsby, current Merrymeeting Park Property Owner Barbara Ormsby, current Merrymeeting Park<br />

Property Owner Frank Moore<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: mekousa@gmail.<strong>com</strong> [mailto:mekousa@gmail.<strong>com</strong>]<br />

Sent: Monday, August 16, 2010 8:22 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Hi. Thanks for the opportunity to submit <strong>com</strong>ments. I have lived in Topsham for 13 years and Bath for 34 years<br />

before that. As a person who travels the Topsham bypass (Rt 196) several times a day, here are my observations on<br />

traffic flow. The bypass worked well at first. Now it has turned into stop light after stop light. It literally takes 5-10<br />

minutes to get through during most of the day. I often hit 4 or 5 red lights each trip. A couple of years ago, they built<br />

an access road. Why not pull almost all the stop lights off the bypass and close it to left turning traffic. The only<br />

exceptions should be Rt 201, Rt 95, and the Topsham Fair Mall. This would be a great improvement because<br />

through traffic will keep moving instead of stopping over and over. All local traffic would access businesses from<br />

the access road. I've seen this work very well in many other states that I have visited. Thanks for listening. Kevin<br />

Olson<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: alank@donfoshays.<strong>com</strong> [mailto:alank@donfoshays.<strong>com</strong>]<br />

Sent: Tuesday, August 17, 2010 8:18 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Hello, I manage Don Foshay's Discount Tire on Bath rd in Brunswick and am writing concerning the possible<br />

changes in traffic routes in Brunswick. To keep it short, I will be direct and to the point. Although I do feel there are<br />

areas of Brunswick which could use some help, I feel most of the propsed changes should be held till further review.<br />

We just shipped out close to 4000 people from the area, why do we need drastic traffic control now The only area I<br />

feel that could use some eleviation is Mill St to Pleasant. The 201/196 in Topsham is absolutely fine. I don't<br />

understand the thought that people cannot wait 1 minute for a light to change. Widening the overpass will not do<br />

anything as it is only as good as the off ramps on the Brunswick side. The Pleasant St revamp needs to be looked at<br />

as the proposed change would make it impossible for any business to work in that area. As far as my area goes, I feel<br />

22


you have already made up your mind as to where the bypass will go through...which is right through my store.<br />

Please take a look 300 ft down and you will find an area in a gully where a stepped down road would work<br />

perfectly. You now have my e-mail, please keep me informed. Thank You Alan Kapocius<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: brunswickautorecycling@yahoo.<strong>com</strong> [mailto:brunswickautorecycling@yahoo.<strong>com</strong>]<br />

Sent: Friday, August 27, 2010 4:40 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I THINK THE OFF RAMP TO THE BASE IS NOT WORTH THE MONEY UNTIL THE DEMAND IS<br />

THERE.AS FAR AS THE NEED EVEN WHEN THE BASE WAS FULL COOK'S CORNER HANDLE THE<br />

TRAFFIC. AS FAR AS THE STUDY DID THEY DO THAT WHEN THE BASE WAS FULL AND THERE WAS<br />

CONSTRUCTION I TRAVEL THRU COOK'S CORNER EVERY DAY THE ONLY THING I HAVE TO STOP<br />

FOR IS THE RED LIGHTS. NEVER BECAUSE THERE IS TO MUCH TRAFFIC EXCEPT FOR<br />

CONSTRUCTION. WHERE THEY WANT TO PUT IT THERE IS NO REASON THEY CAN'T PUT IT OVER<br />

IN THE GULLY SO IT WOULDN'T EFFECT 2 BUSINESS.IF ANY ONE WAS A NEED TO DO IT WOULD<br />

BE PLESANT ST THAT IS ALWAYS A MESS. PAULA LETOURNEAU<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: "brunswick auto recycling"@yahoo.<strong>com</strong> [mailto:"brunswick auto recycling"@yahoo.<strong>com</strong>]<br />

Sent: Friday, August 27, 2010 5:41 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

HAVE YOU BEEN TO COOKS CORNER LATELY NOT MUCH TRAFIC AT ALL, ANY TIME OF<br />

DAY!!!IS THERE I DO NOT SEE A NEED FOR A RAMP THROUGH THE ONLY SALVAGE YARD IN THE<br />

AREA AND NEITHER DO MY CUSTOMERS. WE SAY WAIT TILL THERE IS THE NEED TO IMPROVE<br />

TRAFIC FLOW. $30,000,000 IS ALOT OF MONEY TO WAIST. SPEND IT WHERE IT IS NEEDED NOT<br />

WHERE YOU THINK IT MIGHT BE NEEDED. PEOPLE WILL BUILD THERE IF THEY WANT TO NO<br />

MATTER HOW THEY GET IN THERE.THERE IS GOING TO BE 10 OTHER WAYS IN TO THE BASE DO<br />

YOU THINK RT1 IS THE ONLY WAY PEOPLE WILL GO IN I DONT!!! THEY WILL USE THE CLOSEST<br />

ENTERENCE TO WHERE THEY NEED TO GO. THERE WILL BE ANOTHER ONE RIGHT ON BATH ROAD<br />

ANYWAYS!!! YOU TALK ABOUT OVER BUILDING AT YOUR MEETINGS ,HOW YOU DONT WANT TO<br />

DO THAT BECAUSE PEOPLE WONT USE PUBLIC TRANSPORTATION AND HOW YOU CAN WAIT ON<br />

THE RAIL SPUR BECAUSE THE DEMAND IS NOT THERE THAT MAKES SENCE BUT THEN YOU GO<br />

AND SAY YOU NEED TO BUILD THIS EVEN THOU THE TRAFIC IS NOT THERE. THAT MAKES NO<br />

SENCE,SOUND LIKE A OXY MORON OR SOMETHING YOU ALSO SAY OPTION 1,2,3 ALL COST THE<br />

SAME NOW THAT MISS LEADING. TELL THE TRUTH WILL 1,2 COST MORE THAN 3 YES IT WILL.<br />

YOU SAY 20 - 30 MILLION NOW WE ALL KNOW 1,2 WOULD BE 30-40 MILLION AND 3 WOULD BE 10-<br />

20 MILLION. BIG DIFFERENCE THERE, AT LEAST TO US LITTLE PEOPLE!!! SO TAKE A RIDE DOWN<br />

PLESANT ST AND RT197 IN TOPSHAM THEN DRIVE THROUGH COOKS CORNER AND THEN ASK<br />

YOUR SELF IF COOKS CORNER IS A PROBLEM. WE SAY FIX THE PROBLEMS FIRST AND THEN<br />

COOKS CORNER WHEN THE DAMAND IS THERE. MAYBE DIRECT ACCESS FORM I95 TO THE BASE<br />

WOULD BE THE WAY TO GO BUT THEN I DONT MAKE 6 FIGURES A YEAR WHAT DO I KNOW I<br />

REALY THINK A RAMP FIRST IS NOT THE WAY TO GO IT COULD BE A GOST RAMP! AND I REALY<br />

DONT THINK YOU WANT THAT. THERE IS TALK ABOUT CREATING JOBS WHAT ABOUT THE ONE<br />

YOU WILL KILL. AGAIN I STRONGLY SUGEST NOT BUILDING THROUGH THE BISSNESSES ON BATH<br />

ROAD BRUNSWICK AUTO RECYCLING,DISCOUNT TIRE,AUTOMERTCS. THERE ARE OTHER<br />

OPTIONS! SHAWN LETOURNEAU<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

23


From: cp348@aol.<strong>com</strong> [mailto:cp348@aol.<strong>com</strong>]<br />

Sent: Friday, August 27, 2010 7:15 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Why don't you make an interchange I295 just north of Freeport.Go east just south of base then north east, just east of<br />

mid coast hospital to route 1 then north west across river to I95 north of Topsham. then you could continue southeast<br />

over 201 south 196 over river to river road back to 295. That way anyone <strong>com</strong>ing north can get off to go to base or<br />

continue to Bath or east by pass. Coming From Lewiston, Lisbon can bypass Topsham to route 1 to base. River road<br />

can do the same as Lisbon. or go south and get on 295.That way they won't go on pleasant st - traffic circles don't<br />

work like people think they will. Look at the map instead of at downtown map Virgil Faith<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: duckcove@roadrunner.<strong>com</strong> [mailto:duckcove@roadrunner.<strong>com</strong>]<br />

Sent: Friday, August 27, 2010 8:22 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I have just a question as to whether there will be any access to the Old Gatchell Cemetery in he woods on the<br />

BNAS. We have been to it several times but was always taken by a lady that worked at the Base. The last time we<br />

were there the fence around it was not in very good shape. Just was wondering about this. Sandra Hickey Sandra<br />

Hickey<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: mharrison04252@gmail.<strong>com</strong> [mailto:mharrison04252@gmail.<strong>com</strong>]<br />

Sent: Monday, August 30, 2010 12:29 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I have a re<strong>com</strong>mendation that I did not see in the report. Thank you for your consideration of my input. Add a green<br />

light turning arrow for US Route 1 southbound traffic at the intersection of Mill Street and Pleasant Street in<br />

Brunswick. The green arrow would be lighted whenever the northbound traffic had a green light. I believe this<br />

would greatly increase the speed of traffic southbound through this intersection and improve the present condition<br />

that results in lengthy backups. Southbound motorists appear confused and frequently stop to yield when in fact if<br />

traffic is flowing northbound there is no reason for them to stop or yield. Matthew Harrison<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: pmconusa@netscape.net [mailto:pmconusa@netscape.net]<br />

Sent: Monday, August 30, 2010 1:43 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

There is no reasonable expectation that the Brunswick Naval Air station will have anywhere near the roughly 6000<br />

people who occupied the facility in its hay-day. There will certainly not be the 300 or more school age children who<br />

need to be transported to local schools every day. The conclusion a prudent person could make is that the traffic in<br />

and around the old air station will be nowhere near what it was. Any spending on access and egress should be<br />

constrained to maintaining the system of roads as they exist today. Any additional widening would be a waste of<br />

taxpayer funds. It is already too late, but I think an over 100 page study to <strong>com</strong>e to these conclusions was a colossal<br />

waste as well. Fred Blanchard<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

24


From: Ken Gorby [mailto:gorbs123@<strong>com</strong>cast.net]<br />

Sent: Tuesday, September 07, 2010 8:26 AM<br />

To: Mann, Chris A<br />

Cc: aken<br />

Subject: NASB TRANSPORTATION STUDY<br />

KEN GORBY<br />

2 Westminster AVE<br />

BRUNSWICK ME 04011<br />

I will be affected by 2b and I am not pleased as you can imagine. all variations affect me and my home. Reason I<br />

bought home on dead end was to avoid traffic, congestion etc.<br />

Feel that your study tries to solve all problems but only on paper. How traffic etc changes with one plan will not<br />

necessarily get better by having more plans in place.<br />

Also feel roundabout at exit 28 connector/rte 1 intersection and removing all signs directing traffic onto pleasant st<br />

would improve traffic flow, reduce cars on pleasant. then if not working as desired try another plan.<br />

ken gorby<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: olivermarlene@yahoo.<strong>com</strong> [mailto:olivermarlene@yahoo.<strong>com</strong>]<br />

Sent: Wednesday, September 08, 2010 6:19 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Thank you for asking for public <strong>com</strong>ment. I have not read the draft report summary and am basing my opinions on<br />

today's Times Record Editorial. 1) I am wary of hiring consulting firms, especially from out of state. I will guess<br />

that their employees don't live in this area and don't use the roads on a regular basis whether by car, bicycle or by<br />

foot. If consulting firms did not <strong>com</strong>e up with major and expensive re<strong>com</strong>mendations their fees might not get paid.<br />

2) Roundabouts cause crashes, namely for bicyclists and pedestrians with visual impairments, and tourists<br />

unfamiliar with the area. 3) Raised medians also cause crashes. Two places that <strong>com</strong>e to mind are on the Coastal<br />

Connector and Rte. 1 near the Swinging Bridge. I feel they are more nuisances than helpful, especially in the winter<br />

and at night, and can force cars to enter the path of bicyclists. 4) As far as widening the Coastal Connector I am for<br />

any widening that will benefit bicyclists and pedestrians. I live in Topsham and have two children attending Mt.<br />

Ararat High School. Although the Connector is a direct route from my house to the school I will not allow them to<br />

walk or bicycle to school by way of the Connector. It is simply too dangerous. 5) Please don't put another traffic<br />

light on Route 201. Thanks for reading this. I lived in Boston and California; by <strong>com</strong>parison driving through<br />

Brunswick and Topsham is a piece of cake!! Marlene R. Oliver<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: gil.peterson@hotmail.<strong>com</strong> [mailto:gil.peterson@hotmail.<strong>com</strong>]<br />

Sent: Thursday, September 09, 2010 11:58 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

The proposed roundabouts, or traffic circles, on Pleasant Street would enhance the flow of traffic and should be<br />

considered a viable alternative to the current situation. However, the current mess at the intersection of Stanwood,<br />

Pleasant, and Mill Streets needs serious redesign as its current status causes serious backups on Mill Street. Cars<br />

turning left from Stanwood onto Pleasant Street do not turn into the left lane, causing cars on Route 1 to stop. Mill<br />

Street, the direct access to the Route 1 by-pass, should be four lanes to maintain the flow of traffic, and the Coastal<br />

Connector should also be four lanes for the same reason. The intersection of Routes 201 and 196 works well and<br />

should be maintained as it is. Gil Peterson<br />

25


Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: peterd@midcoastimaging.<strong>com</strong> [mailto:peterd@midcoastimaging.<strong>com</strong>]<br />

Sent: Thursday, September 09, 2010 8:34 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I have lived in Brunswick for over 23 years, part of that time on Route 123 next to the Navy base, and the rest of that<br />

time here in East Brunswick to the East of the base. I've looked over your Transportation Feasibility Study carefully,<br />

and there seems to be one glaring issue that is not being addressed. Put as simply as possible, the traffic <strong>com</strong>ing up<br />

from Harpswell on Route 24 heading for the downtown Brunswick area & points West should not have to travel on<br />

Bath Road, with its high traffic volume & "high crash locations". Similarly, the traffic <strong>com</strong>ing up Route 123 heading<br />

for Cooks Corner and points East should not have to travel through this congested and accident-ridden Bath Road<br />

artery either. If you made provisions for traffic to flow South of the runway across from Route 123 to Route 24<br />

(Golf Course intersection and Coombs Rd intersections, respectively,) you would significantly cut down on the<br />

traffic volumes and accident rate on Bath Road and the Cooks Corner and Sills Drive intersections. This would give<br />

you a much higher chance of success with any of your traffic access strategies to the new Brunswick Landing<br />

facilities. Peter Dessereau<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: eswan@pineisland.org [mailto:eswan@pineisland.org]<br />

Sent: Friday, September 10, 2010 7:46 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I prefer the "traffic-calming boulevard" model for outer Pleasant Street. Roundabouts at intersections will move<br />

traffic smoothly and will be more visually appealing than traffic lights and lots of lanes. Until power lines are buried<br />

on outer Pleasant, it will be hard to make it look much less ugly than in looks now, but eliminating one of the<br />

existing travel lanes will free up space for much-needed aesthetic improvements. I strongly oppose widening Mill<br />

Street to 4 lanes. Every effort should be made to divert traffic onto the Coastal Connector, a road that is much more<br />

suited to being widened than a downtown street abutting a residential neighborhood like Mill Street. In summary,<br />

please don't propose any solutions that widen existing roads with the exception of the Coastal Connector, whose sole<br />

purpose is moving traffic and is therefore more suited to that role. Emily Swan<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: cfolsom@localnet.<strong>com</strong> [mailto:cfolsom@localnet.<strong>com</strong>]<br />

Sent: Friday, September 10, 2010 6:21 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Re: Strategy 2C Improving mobility on Mill Street I live in the Topsham Heights neighborhood and work in<br />

downtown Brunswick. I go home for lunch and travel across the black bridge and along Mill Street 4 times each<br />

day. A middle turn lane on Mill Street would be helpful for left turning traffic <strong>com</strong>ing out of Cushing Street to have<br />

a place to go to while waiting to merge into southbound traffic. Presently, an opening is needed in both northbound<br />

and southbound lanes in order to turn left. Also, the yield at the end of Mill turning onto Pleasant seems to be the<br />

major contributor to the back up of traffic along Mill in the summer time. Drivers who are unfamiliar <strong>com</strong>e to a<br />

<strong>com</strong>plete stop and wait. It would make more sense to restrict traffic turning left off Stanwood to the inner lane and<br />

allowing Mill to flow into the outer lane. Lastly, the end of Cumberland where it meets Mill is wide enough for a<br />

right turn and left turn lane designation. Drivers often pull to the far right and sit with their blinkers on for a left<br />

hand turn; impeding all those who could turn right. (My other option for getting home would be a left hand turn onto<br />

26


Maine Street from Lincoln! Which is why I continue to navigate through Mill Street every day.) Cindy Folsom<br />

Do NOT add to mailing list.<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: Claudia & Ed Knox [mailto:eknox@sus<strong>com</strong>-maine.net]<br />

Sent: Friday, September 10, 2010 1:39 PM<br />

To: Mann, Chris A<br />

Cc: Margo Knight; Benet Pols; Nancy Randolph; Vicky Marr; Suzan Wilson<br />

Subject: NASB Study Comments<br />

Dear Chris,<br />

Below please find some appreciation for study 'concepts' that I believe are positive, and then (a longer) critique if<br />

study 'concepts' that I believe would endanger the economic and social well being of the town I live in, Brunswick.<br />

I. Appreciations<br />

Proposed Pleasant Street roundabouts at the end of the route 295 ramp, at Church Street, and at River Road, are<br />

worth really exploring. These locations are the right ones for signaling gradual transitions in land uses as Pleasant<br />

morphs from highway <strong>com</strong>mercial in tone to a more urban and pedestrian <strong>com</strong>mercial/residential mix. The<br />

roundabouts also help to calm traffic while facilitating steady traffic flow and offering opportunities to reverse<br />

direction. These traffic management tools can support Pleasant Street businesses.<br />

Widening of the Coastal Connector is <strong>com</strong>pletely logical and economical - it was designed for this destiny. The<br />

overpass re<strong>com</strong>mendation makes sense to me and I hope that it does to Topsham.<br />

Changes in the signage on 295 directing through traffic, should encourage use of the Coastal Connector and<br />

discourage use of Pleasant Street for this segment of the driving public. As roundabouts are built on Pleasant Street,<br />

and as the Coastal Connector is widened and an overpass is added, more local drivers will select the Topsham route<br />

because they will perceive it as faster. Reduction in traffic volumes on Pleasant Street will encourage local shoppers<br />

to patronize Pleasant Street businesses.<br />

II. Critiques<br />

NASB addresses needs to move traffic to Brunswick Landing to the exclusion of addressing the needs of the<br />

Brunswick <strong>com</strong>munity to reconnect with its primary <strong>com</strong>mercial roadway, Pleasant Street, and with its<br />

Androscoggin riverfront. Some of the NASB 'concepts' exacerbate the alienation of Brunswick from Pleasant Street<br />

and from the River. Furthermore, the 'concepts' are based upon traffic modeling for limited high use periods, not<br />

upon normal (e.g. peak travel on a weekday in October or May) traffic flow. This approach engineers roadways for<br />

atypical situations, and gives precedence not to local users but to vacationers. This is both expensive to the State<br />

and damaging to healthy local development.<br />

The massive intersection proposed for Pleasant/Mill Street, exactly where the riverfront and Brunswick's historic<br />

neighborhoods begin, is a huge mistake - an insult even. This idea <strong>com</strong>pounds earlier errors in traffic engineering<br />

and will further erode downtown residential and <strong>com</strong>mercial property values.<br />

Mill Street should be kept to two lanes, with dedicated left turns as needed. Traffic should be calmed to a relatively<br />

low speed. Pedestrian access to the swinging bridge and the future riverwalk should have priority. The proposed<br />

elevated pedestrian walkway is laughable - poorly positioned and fundamentally useless. There should be no<br />

median barrier on Mill Street that inhibits pedestrian crossing at Cushing Street.<br />

Any new design for the Pleasant/Mill Street intersection should not preclude the future return of two-way traffic<br />

between Stanwood and Union Streets on Pleasant Street, or, potentially, between Stanwood and Maine Streets on<br />

Pleasant Street. This is Pleasant Street's historic function, to conduct Brunswick drivers to businesses on Pleasant<br />

Street and to allow them to easily travel between the North and South sides of Brunswick's downtown. A one-way<br />

27


'inner' Pleasant Street is a barrier to normal <strong>com</strong>mercial and social interaction. A one-way 'inner' Pleasant<br />

Street distorts logical driver choice, sending vehicles onto Maine Street, Mill Street, Union Street, Stanwood Street,<br />

and numerous smaller side streets, all in a convoluted effort to get out of town. This excess burden of traffic is<br />

deleterious to a vibrant downtown and to residential neighborhoods. The location of Brunswick's new police station<br />

at Stanwood and Pleasant opens opportunities for better management at this key intersection and the restoration of<br />

two-way traffic.<br />

Proposed median barriers on 'outer' Pleasant Street seem counterproductive to me - I don't think they are a necessary<br />

adjunct to the roundabouts. I think better design standards for the roadway can reduce the number of potential left<br />

turns by reducing the number of curb cuts. Can some dedicated left turn stacking lanes be worked in Parallel roads<br />

may be a good addition to driver choices particularly if they are carefully coordinated with the interests of some<br />

residential enclaves.<br />

Lastly, Sage Hill Road now functions as a dead end and is problematic because its only inlet/outlet is via Mill<br />

Street. Its connection to Pleasant Street should be established.<br />

Sincerely,<br />

Claudia Knox<br />

Brunswick<br />

From: McInnes, Richard D. [mailto:mcinnes@mitre.org]<br />

Sent: Friday, September 10, 2010 10:43 AM<br />

To: Mann, Chris A<br />

Cc: McInnes, Richard D.<br />

Subject: Traffic Circles<br />

Sir,<br />

I am concerned that Traffic Circles are being considered. Other states are spending a lot of money removing traffic<br />

circles. One particular example is the traffic circle in Concord Massachusetts. It is my understanding that they are<br />

getting ready to spend $ Millions to implement a new solution.<br />

Bath just built a traffic circle when a simple traffic light would have worked. I understand that they built it because<br />

they received funding from some government agency but I think we all need to be good stewards of our tax dollars<br />

as they are in short supply.<br />

Best Regards,<br />

Richard McInnes<br />

Brunswick<br />

From: Scott Taylor [mailto:scott@brunswicktelegraph.<strong>com</strong>]<br />

Sent: Friday, September 10, 2010 11:03 PM<br />

To: Kennedy, Marty<br />

Cc: Cooney, Leighton; Louise<br />

Subject: NASB Study - NWBNA <strong>com</strong>ments<br />

Marty Kennedy<br />

<strong>VHB</strong> Consulting<br />

Re: NASB Transportation Study<br />

Dear Marty:<br />

10 September 2010<br />

28


On behalf of the board of the NorthWest Brunswick Neighborhood Association, I am writing to provide some of our<br />

<strong>com</strong>ments and concerns which we hope will be included in the final <strong>VHB</strong> report. We are naturally concerned with<br />

the aspects of the report’s re<strong>com</strong>mendations that directly impact our neighborhood. Of specific concern is the idea of<br />

widening Mill Street.<br />

The historic NorthWest neighborhood is bordered by Pleasant, Mill and Maine Streets. This area is one of the most<br />

historically significant parts of Brunswick. It includes 2 of the 3 Brunswick homes designed by famed architect John<br />

Calvin Stevens. There are several, well-preserved examples of the original apartment buildings that housed mill<br />

workers in the late 1800s – (the rest were destroyed when the Rt. 1 overpass was constructed). It is home to the<br />

recently restored John Roebling Swinging Bridge, as well as Davis Park – the only accessible in-town green space<br />

besides the mall that is not dedicated to athletic use.<br />

The character of the neighborhood is shaped with an eclectic <strong>com</strong>munity of families, students, retirees, artists, and<br />

professionals from a wide range of economic and cultural backgrounds all of whom are interested in the positive<br />

development and revitalization of their neighborhood. The homes that line our streets, many of which are being<br />

lovingly restored, are a direct link to the original development of Brunswick’s downtown. This <strong>com</strong>bination of<br />

active, friendly, and diverse neighbors, historic architecture, and the walkable proximity to the economic and<br />

cultural vibrancy of Topsham, Maine Street Brunswick, and Bowdoin College, provides a rich quality of life and<br />

makes the Northwest Brunswick Neighborhood an ideal location in which to live.<br />

While you have said repeatedly that the report is not a re<strong>com</strong>mendation to do anything without the <strong>com</strong>munity’s<br />

blessing, it’s not hard to see how some people are viewing it precisely as a blueprint or foregone conclusion for the<br />

future “necessary” or “inevitable” development of Brunswick.<br />

We believe that the report gives vision to several projects which could be very good for Brunswick’s future. We<br />

are confident that many of the Traffic Demand Management strategies that came to the forefront during the Study, if<br />

implemented, will mitigate any need for or interest in expanding Mill. We support:<br />

- New signage on 295 that appropriately routes traffic to the Coastal Connector<br />

- Expanding the Coastal Connector to a consistent width and grade separating the intersection at Rt. 201<br />

- Better management of Rt. 1 southbound traffic as it passes through Brunswick, including the MDOT<br />

study of the intersection of the Rt. 1 off ramp, allowing a left turn onto Maine St.<br />

- Managing Pleasant Street traffic – including the improvement of the intersection at Pleasant, Mill and<br />

Stanwood Streets<br />

- Creating direct access to the base for rail and cars if further research shows it’s needed and costeffective.<br />

There were a lot of good ideas in the report, but we’d like to say in no uncertain terms that the expansion of Mill<br />

Street would unquestionably threaten the quality of life in this increasingly vital neighborhood, and would<br />

irreversibly sever the downtown from our waterfront. The bank of the Androscoggin River in this neighborhood<br />

offers Brunswick’s only possibility for multi-use, in-town waterfront development. With ongoing upstream<br />

improvements in water quality, wildlife restoration and protection, the river that was the sad inspiration for Senator<br />

Muskie’s Clean Water Act, can be a proud example of the potential for waterfront revival. To widen Mill Street,<br />

thereby increasing traffic, pollution and noise. It would be a travesty if such a precious resource for the whole town<br />

was sacrificed to a four lane highway built to ac<strong>com</strong>modate those whose goal is to leave Brunswick and get<br />

somewhere else as fast as possible.<br />

During the Transportation Study process, you were publicly presented with a petition with 100 signatures<br />

requesting that the feasibility of decking-over Mill Street be considered. No formal response to that petition has been<br />

received. Given that those 100 signatures were easily collected online in a short time frame, we know that thousands<br />

of signatures can be collected with a minimum of effort. An intelligent approach to the long term goal of decking<br />

over Mill Street is a concept that could change the future of Brunswick and the region and the perception of Maine<br />

overall. It deserves to be incorporated into the considerations of the current Study and both short and long term<br />

plans for this area.<br />

It seems that the State now owns, or will soon own, property parcels along much or all of Mill Street. This property<br />

should be protected and landscaped to provide sound and visual barriers between the neighborhood and Mill Street.<br />

The homes on Sage Hill, the end of Cumberland and all along Oak Street are particularly vulnerable.<br />

29


We are requesting that as part of the overall Transportation Study re<strong>com</strong>mendation to improve facilities for cyclists<br />

and pedestrians and the hoped-for expansion of Brunswick’s bus service, this neighborhood will see the following:<br />

- At least three pedestrian bridges providing access to the river bank – one at the Canoe Portage, one<br />

opposite the Swinging Bridge and another opposite Union Street<br />

- The inclusion of the Riverwalk plans in the overall transportation plans<br />

- Reorganization of the traffic patterns to protect the neighborhood from being used as an access route to<br />

Maine Street<br />

And finally, we recognize the considerable work that you have put into this study and the many different options<br />

presented. There are a lot of good ideas in there, but we hope that as the powers that be move forward on any and<br />

all “improvements” that they will be carefully considered in terms of short term and long term benefits and losses to<br />

all the residents of our fair town.<br />

We look forward to working together with you and the town and the folks in Augusta for the betterment of<br />

Brunswick, and our many neighbors, friends and guests.<br />

Best,<br />

Scott Taylor<br />

President<br />

NWBNA<br />

From: kiran1@earthlink.net<br />

Sent: Tuesday, November 9, 2010 11.10 AM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

Wanted to know what the status of the draft is in terms of implementations of this study. I am the owner of<br />

Travelers Inn and Knights Inn on pleasant street. Would like to know more about the plans on pleasant street and<br />

route 1. Thank You Kiran Patel<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

From: gtelectricalservices@yahoo.<strong>com</strong> [mailto:gtelectricalservices@yahoo.<strong>com</strong>]<br />

Sent: Tuesday, November 09, 2010 8:33 PM<br />

To: cmorris@morris<strong>com</strong>m.net; Kennedy, Marty<br />

Subject: Brunswick Naval Air Station website form submittal<br />

I wonder if it would be possible to get a paper copy of the entire study report. Thank you George Thompson<br />

Email sent by <strong>VHB</strong> QuickMail.NET<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!