05.01.2015 Views

Uniform Mitigation Assessment Method TRAINING MANUAL

Uniform Mitigation Assessment Method TRAINING MANUAL

Uniform Mitigation Assessment Method TRAINING MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Description of Standardized Field Protocol (SFP)* (continued)<br />

Following are suggested minimum guidelines that can be used to standardize field surveys across all<br />

agencies involved in the review process, if time constraints prohibit a thorough walk-over of the<br />

assessment area:<br />

Area<br />

Sampling Effort<br />

1-2 acres 100% of perimeter and minimum of two 30 m<br />

transects, depending on homogeneity of site*<br />

>2 to 5 to 20 acres 100% of perimeter and minimum of ten 30 m<br />

transects, depending on homogeneity of site*<br />

* The transects are located from the wetland or water body edge towards the interior of the assessment area,<br />

perpendicular to the edge, for a distance of 30 meters or until the limit of the proposed activity, whichever is<br />

greater. Depending on the homogeneity of the site, these minimum requirements can be adjusted. For instance,<br />

when sampling a Juncus spp. marsh where there is ample visibility of the entire site, it may not be necessary to repeat<br />

the transects.<br />

* The SFP is not part of Ch 62-345, but it is presented here as a tool that may be used to assist in field assessments of the project area.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!