VI. Results<br />
• Prior to <strong>Lean</strong> Program<br />
– Project 1<br />
– Project 2<br />
• After <strong>Lean</strong><br />
12 Mos. Late $ On Budget<br />
12 Mos. Late $ 50M Over<br />
– ARC - $58M On Time<br />
$ On Budget<br />
– MOB 1 - $20M 2 Mos. Early $ 100k Under<br />
– MOB 2 - $24M 1 Mos. Early $ 1M Under<br />
– Bed Tower $51M<br />
1 Mo. Ahead $ On Budget