12.01.2015 Views

2010 Sustainable Streets Index - NYC.gov

2010 Sustainable Streets Index - NYC.gov

2010 Sustainable Streets Index - NYC.gov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Purpose<br />

• Reduce excessive vehicle speeds<br />

• Provide safer pedestrian crossings<br />

• Enhance the streetscape<br />

• Improve bicycle connections<br />

Outreach<br />

• DOT identified the need for safety improvements as part of the Pelham<br />

Gardens Safe <strong>Streets</strong> for Seniors (SFSS) project<br />

• DOT presented plans to the Bronx Community Board 11 Transportation<br />

Committee (CB11) and local elected officials in June 2009 and<br />

received feedback<br />

• DOT presented the modified plans to CB11 and local elected officials in July<br />

2009 and received support for the plan<br />

• DOT distributed flyers along Allerton Avenue immediately before<br />

implementation to provide project information and to notify the community of<br />

the upcoming improvements<br />

Approach<br />

Bronx<br />

Queens<br />

Area of detail<br />

PERRY AV<br />

ULL AV<br />

NO NAME<br />

DECATUR AV<br />

• Narrowed the roadway from two moving lanes to one moving lane in each<br />

direction from East Gun Hill Road to Boston Road<br />

• Installed a wide center, painted median<br />

• Installed pedestrian refuge islands and left-turn bays at key intersections<br />

• Installed a new bike lane from Boston Road to Kingsland Avenue in<br />

both directions<br />

• Intersection improvements at Bronx Park East and Allerton Avenue to reduce<br />

traffic delay and improve flow<br />

BRONX RIVER PKWY<br />

Results<br />

E 217 ST<br />

E 216 ST<br />

• Vehicles traveling over the speed limit decreased by 7% along eastbound<br />

Allerton Avenue and by 4% along westbound Allerton Avenue<br />

• Shorter pedestrian crossing distances<br />

• Greened the corridor<br />

• Bicycle connectivity improved and ridership increased by over 25%<br />

WEBSTER AV<br />

BRONX BLVD<br />

OLINVILLE AV<br />

WILLETT AV<br />

DUNCOMB AV<br />

ROSEWOOD ST<br />

E 214 ST<br />

E 213 ST<br />

E 211 ST<br />

E 218 ST<br />

E 215 ST<br />

TILDEN ST<br />

MAGENTA ST<br />

BARTHOLDI ST<br />

S OAK DR<br />

BURKE AV<br />

E 219 ST<br />

E 214 ST<br />

E 213 ST<br />

E 212 ST<br />

E 211 ST<br />

DUNCAN ST<br />

E 218 ST<br />

E 215 ST<br />

HERING AV<br />

OAKLEY ST<br />

NEEDHAM AV<br />

HICKS ST<br />

PEARSALL AV<br />

EASTCHESTER RD<br />

CORSA AV<br />

FENTON AV<br />

SEYMOUR AV<br />

FISH AV<br />

WILSON AV<br />

MICKLE AV<br />

E 222 ST<br />

TILLOTSON AV<br />

GIVAN AV<br />

GRACE AV<br />

Allerton Avenue is an east-west<br />

corridor located in the Pelham<br />

Gardens and Bronxwood<br />

neighborhoods of the Bronx. East<br />

of Laconia Avenue is predominantly<br />

residential while to the west, the<br />

corridor has more commercial<br />

shopping areas. At the west end of<br />

the project is Bronx Park, home of<br />

the New York Botanical Garden and<br />

the Bronx Zoo.<br />

ALLEY<br />

SEXTON PL<br />

ELY AV<br />

SEXTON PL<br />

HAMMERSLEY AV<br />

ALLEY<br />

ALLEY<br />

WICKHAM AV<br />

BRUNER AV<br />

BAYCHESTER AV<br />

EDSON A<br />

FISH AV FISH AV<br />

ARNOW AV<br />

BOSTON RD<br />

LACONIA AV<br />

HERING AV<br />

ALLERTON AV<br />

TENBROECK AV<br />

THROOP AV<br />

STEDMAN PL<br />

E GUN HILL RD<br />

BRONX RIVER PKWY<br />

WHITE PLAINS RD<br />

BRONX PARK E<br />

CRUGER AV<br />

BARKER AV<br />

KINGSLAND AV<br />

WESTERVELT AV<br />

DR. KAZIMIROFF BLVD<br />

SEYMOUR AV<br />

YOUNG AV<br />

WILSON AV<br />

YATES AV<br />

BOUCK AV<br />

MACE AV<br />

1 mile<br />

<strong>Sustainable</strong> <strong>Streets</strong> <strong>Index</strong> <strong>2010</strong><br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!